ORGANISATION ANALYSIS
Delhi Metro Rail Corporation Limited
Delhi Metro Rail Corporation Limited
Tender activity
[Licensing of Built up Shops Bare Spaces at Rohini and New Delhi Stations of DMRC Network through open etender in 05 Separate Schedules]2026_DMRC_933881_1
14/12/2026 09:30:00[Overhauling of different types of train Couplers (Front Automatic Coupler, Intermediate Automatic, Semi-Permanent Coupler A and B type) of RS-2/5/11 stock running in Line-2 and 3/4.]2026_DMRC_933857_1
10/12/2026 09:30:00[Installation of Ballastless Track Including Supply of MSS, Buffer stop and Others for Line- 02 Corridor (Patna Station to Malahi Pakri) of Patna Metro Rail Project.]2026_DMRC_933771_1
28/12/2026 09:30:00[Licensing of Builtup Shops Bare Spaces at Malahi Pakri and New Patliputra Bus Terminal Stations of Patna Metro Network through open etender in seven Separate Schedules]2026_DMRC_933248_1
07/12/2026 09:30:00[PD-52 Property Development as Temporary Structure at NPP-Prashant Vihar / Haiderpur Village Metro Stations (Line-8)(Package-A/B) of Delhi Metro Network]2026_DMRC_933215_1
07/12/2026 09:30:00[Manufacturing and Supply of 5884 MT Head Hardened Rails UIC 60/60 E-1(Class-A) 1080 Grade, IRS-T-12-2009 for Patna Metro Rail Project.]2026_DMRC_932861_1
17/12/2026 09:30:00[Supply, Installation, Testing, Commissioning of Video Conferencing (VC) System with the Integration of existing Audio-video (AV) system.]2026_DMRC_932844_1
26/11/2026 09:30:00[Manufacturing and Supply of Track Fastening System for Line-01 Corridor (Danapur to Khemnichak) for Patna Metro Rail Project.]2026_DMRC_932456_1
30/11/2026 09:30:00[Design, Manufacture, Supply, Installation, Testing and Commissioning of Signalling and Train control and Telecommunication System for Cooridor-1 and 2 of Phase- 1 of Patna MRCP.]2026_DMRC_932394_1
14/12/2026 09:30:00[DC of Twin Tunnel (Up and Down Line) by Shield, Tunnel by Cut and Cover from IGD-1 to Dead End and One Underground Station, along with associated Entry/Exits and Connecting subways of stations of Line-10 extension under Phase-V(A) of Delhi MRTS.]2026_DMRC_931953_1
14/12/2026 09:30:00[Design Verification, Detail Engineering, SITC of Electrical and Mechanical System, DG Sets, Environment Control System, Tunnel Ventilation System and Building Management System for Underground Stations of Corridor-2 of Patna Metro Rail Project.]2026_DMRC_931842_1
14/12/2026 09:30:00[Supply, Installation, Testing and Commissioning for Shifting / Raising the Height of 220kV Transmission Lines of BBMB and 132kV and 220kV M/C Transmission Line of HVPNL infringing in Rithala - Kundli Corridor of Delhi Metro Phase - IV Project.]2026_DMRC_931744_1
26/11/2026 09:30:00[Design, Detail Engineering, Manufacture, Supply, Installation, Testing and Commissioning of 25 kV AC Traction (Rigid OHE), 33 kV Auxiliary Sub Stations (ASS) and associated cabling and SCADA works for Underground Corridors of Patna Metro Rail Project]2026_DMRC_931507_1
10/12/2026 09:30:00[ SIG-701 Rate contract for calibration of measuring instruments of Signalling Department of Line-5, Line-6, Line-7, and AEL for 5 years]2026_DMRC_931479_1
16/11/2026 08:30:00[Manufacturing and Supply of Track Fastening System for Line-02 Corridor (Patna Station to Malahi Pakri Ramp) for Patna Metro Rail Project.]2026_DMRC_931437_1
23/11/2026 09:30:00[Construction of Pre Engineered Building PEB roof of FOB paid and unpaid connecting the Madhuban Chowk stations of Line 1 and Line 8 ext of PH IV of Delhi MRTS]2026_DMRC_931337_1
24/11/2026 09:30:00[Plantation and Maintenance of Trees in various MCD Parks against Compensatory Plantation of trees to be felled/transplanted for construction of Bawana Industrial AreaSector 1,2 station(excl.) to Delhi-haryana border section of Rithala-Kundli Corridor]2026_DMRC_931403_1
13/11/2026 06:30:00[Plantation and Maintenance of Trees in various MCD Parks against Compensatory Plantation of trees to be felled/transplanted for construction of Rithala to Bawana Industrial Area Sector 1,2 section of Rithala-Kundli Corridor of Phase-IV Delhi MRTS.]2026_DMRC_931254_1
12/11/2026 08:30:00[ DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING AND TRAINING OF 60 No. STANDARD GAUGE CARS AND COMPREHENSIVE MAINTENANCE OF THESE 60 NUMBERS OF STANDARD GAUGE CARS AS WELL AS DEPOT M and Ps,etc FOR A PERIOD OF 15 YEARS FOR HYDERABAD METRO PROJEC]2026_DMRC_930793_1
13/01/2027 09:30:00[Request for Proposal (RFP) Document for Licensing of Optical Fiber on multiple routes of DMRC Network]2026_DMRC_930719_1
16/11/2026 09:30:00[DDC for Design of 25 kV Overhead Equipment (OHE) system for the elevated line, Power Supply and SCADA for both Underground and Elevated lines including checking of Design of Receiving Substations and Design Validation of Jaipur Metro Phase-2 Project.]2026_DMRC_929158_1
02/11/2026 09:30:00[Tender Document for Exclusive Co-Branding rights at Selected Metro Stations of outside Delhi region of DMRC Network in 7 (Seven) separate Schedules]2026_DMRC_928477_1
02/11/2026 09:30:00[Engagement of Detailed Design Consultant for Structural design works for Central Vista Depot (adjoining Line-8 Majlis Park station) at Grade and at Elevated level and miscellaneous associated allied structural design works, for Delhi MRTS Phase-V.]2026_DMRC_928019_1
12/11/2026 09:30:00[Tender for Licensing Exclusive Advertisement Rights on Delhi Metro Trains of Line-2 of DMRC Network]2026_DMRC_927489_1
22/10/2026 09:30:00[Design, Detail Engineering, Manufacture, SITC of 25 kV AC Traction (RIGID OHE), 33 kV Auxiliary Sub Stations (ASS), Associated Cabling and SCADA Systems from R. K. Ashram to Kartavya Bhawan of Phase-V(A) Delhi MRTS Project.]2026_DMRC_925080_1
12/11/2026 09:30:00[Design, Supply, Installation, Testing and Commissioning of Interoperable Signalling System for Lajpat Nagar - Saket G-Block Corridor (Line-11) of Delhi Metro Phase-IV MRTS.]2026_DMRC_925123_1
04/11/2026 09:30:00[Upgradation of analog CCTV system to IP-based CCTV system of DMRC.]2026_DMRC_923233_1
27/10/2026 09:30:00