ORGANISATION ANALYSIS
Public Works Roads Department
Public Works Roads Department
Tender activity
[OIL_DEPOSIT_26_27_03 Widening and Upgradation of (i) Naoholia GP Office to Borkula Chariali via Serssa Namghar (L-1.40Km) and (ii) Borkula Chariali to Tipling TE Factory Tiniali Road (L-1.90 Km) for the forthcoming 78th Asom Sahitya Sabha Biennial Co]2026_PWD_54938_3
01/12/2026 08:30:00[OIL_DEPOSIT_26_27_02 Widening and Upgradation of Hukuta Chariali to Madhuting Tiniali (L-3.350 km) for the forthcoming 78th Asom Sahitya Sabha Biennial Conference at Duliajan under OIL Deposit Fund (Emergent Nature) for the year 2026-27. (Duliajan LA]2026_PWD_54938_2
01/12/2026 08:30:00[OIL_DEPOSIT_26_27_01 Widening and Upgradation of DTR (BS Motors) to Outpost via Borpather No 1 OCS-4 (L-3.22 Km) for forthcoming 78th Asom Sahitya Sabha Biennial Conference at Duliajan under OIL Deposit Fund (Emergent Nature) for the year 2026-27.]2026_PWD_54938_1
01/12/2026 08:30:00[Construction of approach road from NH-27 to Pandu Terminal of IWAI under Deposit scheme for 2021-22. (Reconstruction and Rehabilitation of Roads in and around IWAI campus an Upgradation of mandir area in front of IWAI office)]2026_PWD_54896_1
27/11/2026 06:30:00[Defect correction in Construction of Road from Alengi Chungi to Dhodar Ali including Cross Drainage works and Routine Maintenance for 5 years in Jorhat District under PMGSY Ph_I. Package No.AS_10_329]2026_PWD_54885_1
17/11/2026 08:30:00[NGTRD-09]2026_PWD_54925_1
16/11/2026 05:30:00[Installation of 2 nos swing at Bamin Hading under Pradhan Mantri Khanij Kshetra Kalyan Yojana (PMKKKY) for the year 2025-26]2026_PWD_54907_5
01/12/2026 10:30:00[Construction of Multi Storey Market Building at Dihangi, (Phase-I) under Pradhan Mantri Khanij Kshetra Kalyan Yojana (PMKKKY) for the year 2025-26]2026_PWD_54907_6
01/12/2026 10:30:00[Construction of Community Hall, Yoga Centre and Gym at Diyungbra, (Phase-I) under Pradhan Mantri Khanij Kshetra Kalyan Yojana (PMKKKY) for the year 2025-26]2026_PWD_54907_1
01/12/2026 10:30:00[Construction of marriage cum community hall at New Tumbung, Umrangso (Phase-I) under Pradhan Mantri Khanij Kshetra Kalyan Yojana (PMKKKY) for the year 2025-26]2026_PWD_54907_2
01/12/2026 10:30:00[Construction of vertical extension of classroom at J.B Hagjer Degree College, Umrangso under Pradhan Mantri Khanij Kshetra Kalyan Yojana (PMKKKY) for the year 2025-26]2026_PWD_54907_3
01/12/2026 10:30:00[Construction of Gazebo, Landscaping, beautification and boundary chainlink fencing with Iron post on the way to Bamin Hading under Pradhan Mantri Khanij Kshetra Kalyan Yojana (PMKKKY) for the year 2025-26]2026_PWD_54907_4
01/12/2026 10:30:00[Construction of foothpath cum laying of paver blocks in Orchid Park within Bamin Hading (300 metres) under Pradhan Mantri Khanij Kshetra Kalyan Yojana (PMKKKY) for the year 2025-26]2026_PWD_54890_1
01/12/2026 10:30:00[Seismic Requalification of Existing Bridges in Assam under State Disaster Mitigation Fund for the year 2023-24 (Phase I - Geotechnical Analysis)]2026_PWD_54886_1
26/11/2026 08:30:00[ASOM_MALA_3.0_25_26_14 Balance Work for Improvement and Upgradation of Old AT Road (Old NH-37) starting at Ch. 636.80 Km (Laipuli) and ending at Ch. 653.50 Km (Makum ROB) under Asom Mala 3.0 for the year of 2025-26]2026_PWD_54857_1
17/11/2026 08:30:00[ROB/ST-34/ASSAM/RAHA/BALANCE WORK Construction of ROB at Kakati Gaon in replacement of Railway LC Gate No. ST-34 at Rly KM 104/7-8 on Raha Kampur Road under Construction of ROBs on 50_50 Cost Sharing Basis (Balance Work)]2026_PWD_54864_2
16/11/2026 08:30:00[ROB/SK 34/ASSAM/SARUPETA/BALANCE WORK Construction of ROB at LC Gate No. SK-34 on Bhawanipur-Manash Road under Construction of ROBs on 50_50 Cost Sharing Basis (Balance Work)]2026_PWD_54864_1
16/11/2026 08:30:00[BSPTRD/PDNA/2025-26/46]2026_PWD_54836_1
19/11/2026 08:30:00[KAM/KRC/SOPD(G)/2026-27/05Imp ofAlternate Rd to Maa Kamakhya Temple by Providing RCC Bridge to Eliminate Hair Pin Bend, Rock Fall Protection Imp of Junction at Entry Point under SOPDG for the Year 2023.24.(Const of Office Building for the Executive]2026_PWD_54798_1
25/11/2026 06:30:00[Design Supply Installation and Commissioning of 60W Solar LED Street Lights 96 Nos. on both sides from OILs NIA boundary towards the Asom Sahitya Sabha Venue at Madhuting road for a length of 1.00Km (From Ch. 0.00m to Ch. 1000.00m) for forthcoming 78]2026_PWD_54712_1
12/11/2026 08:30:00[MMPNA_2023_24_126A]2026_PWD_54553_1
06/11/2026 08:30:00[Periodic Renewal of App. Road to Madhatari village, Missamukh Rahdhala Khamkhua Ambagan(MRKA) road and Barua-ati to Hatikhuwa road under MMPNA for the year 2023-24 under Kaliabor LAC,]2026_PWD_54615_1
05/11/2026 08:30:00[BSPTRD/PDNA/2025-26/46]2026_PWD_54590_1
06/11/2026 08:30:00[Nalbari_PDNA_2025-26_98]2026_PWD_54420_3
29/10/2026 08:30:00[Nalbari_PDNA_2025-26_85]2026_PWD_54420_2
29/10/2026 08:30:00[Nalbari_PDNA_2025-26_77]2026_PWD_54420_1
29/10/2026 08:30:00[ASOM_MALA_3.0_25_26_14 Balance Work for Improvement and Upgradation of Old AT Road (Old NH-37) starting at Ch. 636.80 Km (Laipuli) and ending at Ch. 653.50 Km (Makum ROB) under Asom Mala 3.0 for the year of 2025-26]2026_PWD_54427_1
03/11/2026 08:30:00[ROB/ST-34/ASSAM/RAHA/BALANCE WORK Construction of ROB at Kakati Gaon in replacement of Railway LC Gate No. ST-34 at Rly KM 104/7-8 on Raha Kampur Road under Construction of ROBs on 50_50 Cost Sharing Basis (Balance Work)]2026_PWD_54408_1
06/11/2026 08:30:00[ROB/SK 34/ASSAM/SARUPETA/BALANCE WORK Construction of ROB at LC Gate no. SK-34 on Bhawanipur-Manash Road under Construction of ROBs on 50_50 Cost Sharing Basis (Balance Work)]2026_PWD_54329_1
03/11/2026 08:30:00[MMUPPNA_RIDF_XXVIII_22_23_71_ Balance work of Improvement of i) Sonari Bhojo Kakotibari Khamungaon Road (Rajgarh Bhojo Ali) (Police Point (Bhojo Chariali) Kakotibari Tiniali) (from ch 11.10km to 15.20 km) and ii) road from Garmur Solapathar]2026_PWD_54304_1
23/10/2026 08:30:00[Township Road, Drain and Associated Utilities at AVFCCL]2026_PWD_54282_1
26/10/2026 08:30:00[Road safety improvement works on SH and MDRs in Dibrugarh division under ASRIP]2026_PWD_53916_1
26/10/2026 08:30:00