Skip to Content
ORGANISATION ANALYSIS

PWD

PWD

Tenders297
Active297
Results0
Companies0

Tender activity

[Repair work of the damaged stone set surface at km 11 of the Kedarnath dham Pedestrin pilgrimage route at Ukhimath block Rudraprayag district.]2026_pwd_102339_2
26/11/2026 09:30:00
[Pabau mai PMGSY dwara PWD ko hastgat Odagad Nai Motor Marg ka One Time maintenace ka karya]2026_pwd_102368_1
26/11/2026 09:30:00
[Repair work of the damaged stone set surface at km 9 and 10 of the Kedarnath Dham pedestrain pilgrimage route at Ukhimath block Rudraprayag district]2026_pwd_102339_1
26/11/2026 09:30:00
[Improvement and Bituminous work by P.C. of Devali-Bhanigram Motor Road in Kedarnath Assembly Constituency, Ukhimath Block, Distt- Rudraprayag.]2026_pwd_102317_1
30/11/2026 08:30:00
[Improvement work by P.C. on the Extenstion Jugashu Ranshi Talsari Motor Road Transferred from the PMGSY Irrigation Division, Rudraprayag under the one-time maintenance scheme.]2026_pwd_102212_1
30/11/2026 08:30:00
[Improvement work of Balsundi-Akhodi Motor Road in Kedarnath Assembly Constituency, Augastyamuni Block, Distt- Rudraprayag.]2026_pwd_102207_1
30/11/2026 08:30:00
[Repair work of the damaged stone set surface at Km 12 of the Kedarnath Dham pedestrain pilgrimage route at Ukhimath block Rudraprayag district.]2026_pwd_102339_4
26/11/2026 09:30:00
[For repair work of the damaged stone set surface at km 13 and 14 of the kedarnath dham pedestrin pilgrimage route at Ukhimath block Rudraprayag district.]2026_pwd_102339_3
26/11/2026 09:30:00
[Renewal work of Majra Mahadev Sauth Motor Road under OTM Block Thalisen Constituency Srinagar DistPauri Gharwal]2026_pwd_102353_1
27/11/2026 09:30:00
[ One time maintenance work of Tipri Chah Gadoliya Motor road, transferred from PMGSY, under State Sector in Tehri Constituency of District Tehri Garhwal (One Time Maintenance).]2026_pwd_102350_1
04/12/2026 09:30:00
[pmgsy se hastantarit kandanala gadiyupul se punodi motor margh me one time maintence hetu sudharikaran aadi ka kariya (Lambai 5.325)]2026_pwd_102245_1
26/11/2026 06:30:00
[FOR IMPROVEMENT WORK ON THE MOTAR ROAD FROM BRETHI (THAN) TO GANGESHWAR MAHADEV (GANGA GHAT) IN CHINYALISAUR BLOCK UNDER STATE PLAN AT CHINYALISAUR , DISTT. UTTARKASHI]2026_pwd_102316_1
07/12/2026 09:30:00
[FOR IMPROVEMENT WORK IS BEING CARRIED OUT IN THE TOTAL LENGTH OF DANDAGAUN MOTOR ROAD IN CHINYALISAUR BLOCK UNDER THE STATE SECTOR AT CHINYALISAUR , DISTT. UTTARKASHI]2026_pwd_102315_1
07/12/2026 09:30:00
[Construction work of interlocking tiles on damaged roads in village Karbari Ratanpur, Raghunathpur, Sherpur and Pelio in Sahaspur constituency of Dehradun district under State Sector.]2026_pwd_102032_1
23/11/2026 09:30:00
[Various repair works by PC on Bhatgarhi Motor Road in Chakrata Constituency of Dehradun District under One-Time Maintenance (Year 2026-27).]2026_pwd_102299_1
23/11/2026 09:30:00
[Construction work of interlocking tiles on damaged roads in village Ganeshpur, Jheevarhedi, Naya Gaon, Ratanpur in Sahaspur constituency of Dehradun district under State Sector.]2026_pwd_102030_1
23/11/2026 09:30:00
[Construction of the Ali-Mundeti-Shaktinagar motor road, located within the Bhilangna block of the Ghansali constituency in district Tehri Garhwal (Phase II, Stage-1)]2026_pwd_102278_1
21/11/2026 09:30:00
[Interlocking Tiles work on Baburkhola to Machhalia Motor Road in Someshwar Assembly Constituency of Almora district under State Sector]2026_pwd_102284_1
28/11/2026 07:30:00
[construction of College Road Chamba Manjude village passing through Chamangaon up to Allwether Road]2026_pwd_102286_1
23/11/2026 07:00:00
[Construction of a 24 Metre Span Bridge at Km 10 of UGT Motor Road]2026_pwd_102283_1
14/12/2026 09:30:00
[Construction of CC Tiles from Deepak Kirana Store to Ancient Shiv Temple and from the Gate of Kasturba Gandhi Hostel to the House of Ashok Kashyap under Gadarpur Assembly Constituency, District Udham Singh Nagar, under Honble Chief Minister Announcem]2026_pwd_102232_1
17/11/2026 09:30:00
[Reconstruction of the road by providing PC (Premix Carpet) from Inter College to St. Mary School via Ramjeevanpur No. 1 under Gadarpur Assembly Constituency, District Udham Singh Nagar, under Honble Chief Minister Announcement No. 790-2026.]2026_pwd_102230_1
17/11/2026 09:30:00
[Strengthening of the road from Jagdishpur to Durgapur via Shrirampur under Gadarpur Assembly Constituency, District Udham Singh Nagar, under Honble Chief Minister Announcement No. 803-2026]2026_pwd_102229_1
17/11/2026 09:30:00
[Surface Improvement Work on the road from NH 74 to Majra Shila under Gadarpur Assembly Constituency, District Udham Singh Nagar, under Honable Chief Minister Announcement No. 793-2026]2026_pwd_102228_1
17/11/2026 09:30:00
[pmgsy se hastantarit simdi se kanda malla motor margh ke km 1 se 4.80 tak me one time maintence ke antragath maramath avam sudharikaran aadi ka kariya lambai 4.80 km 25)]2026_pwd_102245_2
26/11/2026 06:30:00
[Hon. Chief Minister, under announcement no. 1651/2021, the work of repairing the remaining section and blacktopping the Gaja Psarkhet to Gauntachali motor road. (Through Debatable)]2026_pwd_102277_1
18/11/2026 08:30:00
[RAJYA YOGNA KE ANTRAGATH JANPAD PAURI GARHWAL KE VIDHANSHABA CHETRA LANSDOWNE KE VIKASKHAND RIKHNIKHAL KE ANTRAGATH BASDA BUNGA DEVIYUKHAL MOTOR MARGH KE ANTRAGATH BASDA BUNGA DEVIYUKHAL MOTOR MARAGH KE CH 2.500 SE 4.000 KM ME DAMRIKARAN LAMBAI 1.50]2026_pwd_102094_1
25/11/2026 06:30:00
[Reconstruction of road from SH-41 towards Kaudharatan village in Nanakmatta Constituency of Udham Singh Nagar district under State Plan.]2026_pwd_102253_1
19/11/2026 11:30:00
[Reconstruction of the road from house of Harshit Biswas to house of Kinchun Mandal in Surendranagar village in Sitarganj constituency under State Plan.]2026_pwd_102249_1
19/11/2026 11:30:00
[Construction of road towards village Gausikuan Tharwat in Khatima constituency of Udham Singh Nagar district Undr State Plan.]2026_pwd_102240_1
19/11/2026 11:30:00
[SRIKALKHAL NEWGAON SARI BHAINT MOTOR ROAD TO HULYANA MOTOR ROAD IN GANGOTRI CONSTITUENCY DUNDA BLOCK UNDER ONE TIME MAINTINANCE AT DUNDA , DISTT. UTTARKASHI ]2026_pwd_102247_1
23/11/2026 09:30:00
[Construction work by interlocking tiles on motor road from Gadool-Phagsi-Badogal motor road to Dr. Nautiyal house in village Kodsi under State Sector.]2026_pwd_102250_1
21/11/2026 09:30:00
[Damrikaran of pmgsy Transferred Khurmola to Nag gaon Motor Road Under One Time Maintainenace (Rajya Yojana) Length 8.05 Km]2026_pwd_102237_1
27/11/2026 09:30:00
[Renewal work by PC coldmix/PC at Adibadri-Nauti Motor Road (SH). (Km. 1, 2, 3)]2026_pwd_102221_1
24/11/2026 11:30:00
[Renovation and Interior Development of Conference Room including Design, Supply, Installation, Testing and Commissioning of Integrated Audio-Visual and Digital Conferencing System at Conference Room, Lok Bhavan, Dehradun.]2026_pwd_102190_1
25/11/2026 09:30:00
[S.I.T.C. of Integrated Visual System, Sound System, Stage Light and Drapery System at Auditorium in Lok Bhavan, Dehradun.]2026_pwd_102189_1
25/11/2026 09:30:00
[reconstruction work of the syuta narangi Basal Motor Road from km 2 to Bhandargaon Miyagaon mr second Phase Stage second]2026_pwd_102216_1
20/11/2026 08:00:00
[Reconstruction of the road using interlocking tiles of specifically the route extending from Melaghat Main Road via Baggha Colony to Mayur Vihar Sectors 2, 3 Ward No. 09 in Khatima Constituency of Udham Singh Nagar district under the State Plan.]2026_pwd_102217_1
18/11/2026 09:30:00
[Reconstruction and strengthening work of Uppu to Aulani motor road]2026_pwd_102218_1
28/11/2026 10:30:00
[Construction of road by CC interlocking tiles at Village Badheri Rajputana and Shantarshah of Piran Kaliyar constituency of district Haridwar Under State Sector (Job 3).]2026_pwd_101934_4
21/11/2026 08:30:00
[Construction of road by CC interlocking tiles from Mubarik charkhi passing ............ extending towards Muntayaz house as well as the Badheri main road at Village Ratanpur of Piran Kaliyar constituency of district Haridwar Under State Sector (Job 4]2026_pwd_101934_3
21/11/2026 08:30:00
[Construction of internal roads by CC interlocking tiles and Brick on edge at Village Rahmatpur and Belda of Piran Kaliyar constituency of district Haridwar Under State Sector (Job 2).]2026_pwd_101934_2
21/11/2026 08:30:00
[Reconstruction of internal roads by CC interlocking tiles from GT road to Village via Ravidas Temple at Village Beldi Salhapur of Piran Kaliyar constituency of district Haridwar Under State Sector (Job 1).]2026_pwd_101934_1
21/11/2026 08:30:00
[Construction of Kheti-Randoli motor road up to village Randoli under the State Plan ]2026_pwd_102172_1
30/11/2026 07:30:00
[Construction of internal roads in village Nizampur in Manglaur assembly constituency of Haridwar district, under State Plan year 2026-27.]2026_pwd_102168_1
23/11/2026 07:30:00
[Construction of internal roads of village Narsan Kala under Mangalore assembly constituency of Haridwar district by interlocking tiles under State Plan year 2026-27]2026_pwd_102165_1
23/11/2026 07:30:00
[Construction of brick kharanja from the Narsan-Jhabrera road towards Nagla Koyal along with Naale ki Patri in the village of Narsan Kalan in the Manglaur assembly constituency of Haridwar district under State Plan year 2026-27.]2026_pwd_102163_1
23/11/2026 07:30:00
[Construction of internal roads using interlocking tiles in village Tanda Bhaneda in Manglaur assembly constituency of Haridwar district under the State Plan year 2026-27.]2026_pwd_102159_1
23/11/2026 07:30:00
[Construction work of Helipad near Ramtal garden resort above Birmau Kandi at km 90 of NH 707 A (Tiuni Chakrata Mussoorie Chamba Kritinagar) under Chakrata constituency of district Dehradun.]2026_pwd_102109_1
13/11/2026 09:30:00
[ Improvement and widening of the Pithoragarh-Chandak motor road from single lane to 1.5 lane in Pithoragarh constituency of district Pithoragarh under the Honrable CM announcement No. 525/2025 (Length 6.000 km)]2026_pwd_102173_1
30/11/2026 09:30:00
[Maintenance work of Udpalta-Uprauli motor road in Kalsi block, Chakrata constituency of Dehradun district under the State Sector. (Motor road transferred from PMGSY) Length 5.515 km.]2026_pwd_102170_1
21/11/2026 09:30:00
[Improvement and reconstruction of Sardarnagar Keshowala Bannakheda Bailparao Kotabag Kalaldhungi SH 61 from Km 75.00 to Km 81.00 located in the Kotabagh development block of the Kaladhungi assembly constituency in Nainital by DBM/BC In anticipation]2026_pwd_102162_1
02/12/2026 11:30:00
[Construction of a car parking at Mohan Bazar, Mukteshwar, in the Ramgarh Block of Nainital district ]2026_pwd_102153_1
25/11/2026 11:30:00
[Under the State Plan 2026 27 construction of a road using CC interlocking tiles in the village of Basedi Khadar in the Laksar constituency stretching from the Bahadurpur main road passing by the poultry farm and leading towards the fields of Rajendra]2026_pwd_102115_1
23/11/2026 07:30:00
[Construction of a road by CC interlocking tiles under the State Plan 2026 27 in the Laksar constituency from Baleshar house in the village of Dausni towards the boundary of the village of Mohammadpur Buzurg]2026_pwd_102111_1
23/11/2026 07:30:00
[Improvement and reconstruction of Kasiyalekh -Harinagar-Aksoda motor road in the Bhimtal Assembly constituency in Nainital, km 1 to km 8. Under Honble Chief Ministers Announcement No. 66 2026 by PC]2026_pwd_102099_1
02/12/2026 11:30:00
[Under the State Plan Chief Minister Announcement No. 283 2025 Improvement of Titoli Motor Road from Km 4 of Saheed Sanjay Bisht motor road Kainchi Hartapa Hali Motor Road in Nainital Assembly Constituency ]2026_pwd_102034_1
02/12/2026 11:30:00
[Repair and Improvement work on Sera-Bona foot way in Munsyari Block of Dharchula Constituency Pithoragarh District under TSP (Length 12.00km).]2026_pwd_102002_3
19/11/2026 09:30:00
[Repair and Improvement work on Madkot-Bona-Tomik foot way in Munsyari Block of Dharchula Constituency Pithoragarh District under TSP (Length 22.450km).]2026_pwd_102002_2
19/11/2026 09:30:00
[Repair and Improvement work on Madkot-Bui-Pato (Length 18.00km) and Pilthi-Pato (Length 2.00km) foot way in Munsyari Block of Dharchula Constituency Pithoragarh District under TSP.]2026_pwd_102002_1
19/11/2026 09:30:00
[Renewal work PC of Sumankyari-Bangaon Motor Road ( Km 4,5,6,7,8,9,10), Kharson-Kyari to Kharson Motor Road (1,2,3,4.7.50) and Nakot-Negyana Motor Road (1,3,4,7,8,9.50) (Rural Road) in the Dhanaulti Assembly under financial year 2026-27.]2026_pwd_102087_1
25/11/2026 06:30:00
[Renewal work using SDBC at Various Kilometers of Badethi-Banchora-Bhadrigad Motor Road (Km 54.600, 55,56,57,58) (SH-16) and Aglad-Thatyur-Almas Band Motor Road (Km 9,10) in the Dhanolti Assembly, under financial year 2026-27.]2026_pwd_102078_1
25/11/2026 09:30:00
[Renewal work PC at Various Kilometers of Dugdda-Tewa-Bangsheel-Moldhar Motor Road (Km 4,5,6), Bhatoli-Madrasu Motor Road (Km 1,2,3,4,5) and Sainji Link Motor Road (Km 1) (Rural Road) in the Dhanaulti Assembly under financial year 2026-27. ]2026_pwd_102083_1
25/11/2026 09:30:00
[Improvment of Sweet Gahar Odla Motor road in the khirsu block on the Srinagar constituency in Pauri Garhwal district, under District Mineral Foundation ]2026_pwd_102064_1
25/11/2026 09:30:00
[Reconstruction and improvement work (by PC) of Dhokane Kulgad Bichkhali Pathri motor road under development block Ramgarh in Assembly Nainital in district Nainital. Under the state sector]2026_pwd_102028_1
25/11/2026 11:30:00
[C/O Peerul Collection and Briquette Unit in Block Pati and Barakot in distt Champawat under SDRF and Preparedness and capacity Building ]2026_pwd_102026_3
24/11/2026 09:30:00
[R/I of Dholigown paras Rikholi M/Road Km 3 in Distt Champawat Block Pati under State Sector]2026_pwd_102026_2
24/11/2026 09:30:00
[R/I of Chamania Chour to Satkhal M/R under State Sector 2026-27 in Distt Chamapawat Block Lohaghat]2026_pwd_102026_1
24/11/2026 09:30:00
[Whitewashing and Repair work etc. at Family court Nainital]2026_pwd_102023_1
19/11/2026 08:30:00
[Construction of drains , repair of damaged walls etc. on the Bhowali Nainital Tanki Kilbury Pangot motor road (SH-63), under the deposit head(road cutting charges).]2026_pwd_102017_1
20/11/2026 09:30:00
[Construction of a 97.56 Meter span Bailey suspension bridge over the Dhauli River at Tapovan located in the Joshimath Development Block of Chamoli district on the Tapovan-Bhangyul pedestrian route.]2026_pwd_102013_1
03/12/2026 09:30:00
[ Supply of furniture and other residual civil works for the Honble Chief Ministers cottage at the State Guest House Nainital under the control of the State Estates Department]2026_pwd_102012_1
25/11/2026 11:30:00
[Repair and Improvement work on Suring-Leelam foot way in Munsyari Block of Dharchula Constituency Pithoragarh District under the TSP ]2026_pwd_101997_1
18/11/2026 09:30:00
[construction of College Road Chamba Manjude village passing through Chamangaon up to Allwether Road]2026_pwd_102025_1
18/11/2026 07:00:00
[Construction work of a motor road from Anu Birsal, Sunbag to Korag, including a 12-meter span RCC bridge, under the Chakrata block of Chakrata constituency in Dehradun district, under the State Sector. ]2026_pwd_101962_1
17/11/2026 09:30:00
[Construction of Class A loading bridge in place of previously constructed Class B loading bridge in Pithoragarh Jhulaghat motor road (SH-98) Km 14 Hm (8-10) in Didihat Assembly Constituency of Pithoragarh district , under State Plan]2026_pwd_101986_4
01/12/2026 10:00:00
[Construction of 2 km of the Khirmande-Ganai motor road (including a steel girder bridge) (total length 12.00 km) balance part of the remaining work under the State Plan (Stage 1 of the project) in the Gangolihat assembly of Pithoragarh district.]2026_pwd_102005_1
30/11/2026 05:30:00
[Strengthening and Bituminous work of Jadi-Sijla motor road, in Chakrata block of Chakrata constituency in Dehradun district, under TSP. ]2026_pwd_101961_1
17/11/2026 09:30:00
[Improvement and Bituminous work of Bhangar motor road, in Chakrata block of Chakrata constituency in Dehradun district, under TSP. ]2026_pwd_101960_1
17/11/2026 09:30:00
[Improvement and Bituminous work from Pipra side on Lokhandi-Pipra-Meenus motor road of a 5.00 km motor road, under the Chakrata block of Chakrata constituency in Dehradun district, under TSP. ]2026_pwd_101959_1
17/11/2026 09:30:00
[ Supply of Bailey bridge for the construction of pedestrian Bailey bridge over Mayapur Escape Channel, near upstream of Daksh Temple in Kankhal, Distt. Haridwar under Kumbh Mela-2027]2026_pwd_101660_3
09/11/2026 09:30:00
[Renewal by P.C in Ancholi Jakh Puran Meldungari motor road Km. 9 to 14 under AR 2026-27]2026_pwd_101986_1
18/11/2026 09:30:00
[Improvement and asphalting of Bursumbadi motor road from Berinag-Gangolihat motor road in Gangolihat constituency of Pithoragarh district under state plan.]2026_pwd_101983_1
07/12/2026 09:30:00
[Renewal by P.C in Badari to Kamleshwar motor road under AR 2026-27.]2026_pwd_101986_2
18/11/2026 09:30:00
[Renewal by P.C in Pithoragarh Jhulaghat motor road to Bhatery motor road under AR 2026-27. ]2026_pwd_101986_3
18/11/2026 09:30:00
[Renewal work by SDBC at Km. 1 (200m.), 2,3,8,19,27,29 and by BC at Km. 12, 13, 14, 15, 16, 22, 26 of Karanparyag Nauti Paithani motor road. (SH)]2026_pwd_101982_1
18/11/2026 11:30:00
[Reconstruction and improvement work of the SukhiDhang Shyamalatal Kanda motor road in the SukhiDhang area of Assembly constituency Champawat district Champawat Under the state plan]2026_pwd_101974_1
25/11/2026 08:30:00
[Improvement work by PC main Chauraha to South Patkot at Village Patikot in Constituency Ramnagar District Nainital Under State Sector (Waiting for section)]2026_pwd_101965_1
25/11/2026 09:30:00
[Reconstruction and Improvement Works Raintoli to Danoli motor road and as part of the project covering 200km of roads (new construction, improvement and damrikaran) in the Tehri constituency, Under the CM GhosanaNo. 25/2025]2026_pwd_101791_1
16/11/2026 09:30:00
[Improvement and damrikaran work Kapriyasand-Maruki-Chandi motor road and as part of the project covering200 km of roads (new construction, improvement and damrikaran) in the Tehri constituency, Under the CMGhosana No. 25/2025.]2026_pwd_101790_1
16/11/2026 09:30:00
[Extension of Gairsain-Pajiyana Motor Road in Karanprayag Assembly constituency under the Announcement of Honble Chief Minister in District Chamoli under the State Plan Km 5 to 6]2026_pwd_101958_1
17/11/2026 07:30:00
[Improvement work on the road from the junction of I.D.P.L. Road and Pashulok Motor Road to Krishnanagar Colony by BC under Kumbh Mela Infrastructure Development Works- 2027 in Rishikesh Constituency of Dehradun District.]2026_pwd_101950_1
09/11/2026 09:30:00
[Under the State Plan Year 2026-27, the reconstruction and improvement work of Kandari Gaon-Maidhar motor road in the Narendra Nagar assembly constituency of Tehri Garhwal district. Length 1.850 km.]2026_pwd_101951_1
12/11/2026 08:30:00
[Under the State Plan for the year 2026-27, reconstruction and improvement work of the Dandeli-Salanagaon motor road in the Narendra Nagar assembly constituency of Tehri Garhwal district.]2026_pwd_101892_1
12/11/2026 08:30:00
[Construction work (Phase II, Stage 1) of the Jakhol-Savni-Satudi-Fitadi motor road in Mori Development Block, Purola Parliamentary Constituency, Uttarkashi district, under the State Plan (Hon ble Chief Ministers Announcement No. 290/2018)]2026_pwd_101952_1
12/11/2026 11:30:00
[Upgradation work of 15 meter RCC Bridge for one lane to two lane at Km 26 of Badethi-Banchaura-Badrigaad state highway (SH-16) under State sector (ADB funded) at Chinyalisaur, District Uttarkashi.(Phase-I) (As per RFQ and TOR)]2026_pwd_101948_1
14/11/2026 11:30:00
[UPGRADATION OF BRIDGE FROM SINGLE LANE TO TWO LANE SILKYARA BANGAWN CHAPDA SAROT MOTAR ROAD AT KM 47 CHAINAGE 46.750 IN CHINYALISAUR BLOCK UTTARKASHI DISTRICT UNDER STATE SECTOR BRIDGE (AS PER RFQ AND TOR)]2026_pwd_101946_1
14/11/2026 11:30:00
[UPGRADATION OF BRIDGE FROM SINGLE LANE TO TWO LANE SILKYARA BANGAWN CHAPDA SAROT MOTAR ROAD AT KM 67 CHAINAGE 66.600 IN CHINYALISAUR BLOCKUTTARKASHI DISTRICT UNDER STATE SECTOR BRIDGE (AS PER RFQ AND TOR)]2026_pwd_101942_1
14/11/2026 11:30:00
[UPGRADATION OF BRIDGE FROM SINGLE LANE TO TWO LANE SILKYARA BANGAWN CHAPDA SAROT MOTAR ROAD AT KM 65 CHAINAGE 64.100 IN CHINYALISAUR BLOCK UTTARKASHI DISTRICT UNDER STATE SECTOR BRIDGE (AS PER RFQ AND TOR)]2026_pwd_101938_1
14/11/2026 11:30:00
[UPGRADATION OF BRIDGE FROM SINGLE LANE TO TWO LANE SILKYARA BANGAWN CHAPDA SAROT MOTAR ROAD AT KM 65 CHAINAGE 64.650 IN CHINYALISAUR BLOCK UTTARKASHI DISTRICT UNDER STATE SECTOR BRIDGE (AS PER RFQ AND TOR)]2026_pwd_101936_1
14/11/2026 11:30:00
[UPGRADATION OF BRIDGE FROM SINGLE LANE TO TWO LANE SILKYARA BANGAWN CHAPDA SAROT MOTAR ROAD AT KM 76 CHAINAGE 75.400 IN CHINYALISAUR BLOCK UTTARKASHI DISTRICT UNDER STATE SECTOR BRIDGE (AS PER RFQ AND TOR)]2026_pwd_101930_1
14/11/2026 11:30:00
[Reconstruction of damaged assets at various locations along the Mangoli Khamari Thapla Jalagaon motor road in Nainital district, under the Floods and Landslides head for the year 2026-27 (subject to approval).]2026_pwd_101929_1
16/11/2026 09:30:00
[Improvement work by PC Pangoot Motor Road at Kotabag Vikaskhand in Constituency Nainital District Nainital Under State Sector]2026_pwd_101928_1
17/11/2026 09:30:00
[Improvement work by PC Syat Link Road at Kotabag Vikaskhand in Constituency Nainital District Nainital Under State Sector]2026_pwd_101925_1
17/11/2026 09:30:00
[Janpad Pauri Garhwal ke Mukhyalaya Pauri Me isthit Purani Jail ke Sangrahalay Swaroop me vikshit karne ka karya]2026_pwd_101918_1
16/11/2026 06:00:00
[Improvement work using interlocking tiles on the existing width of the road from Maneshwar Chauda Rajpura Motor Road to Gaudi Milan Motor Road and Lamkaniya Motor Road under Honrable CM Announcement No. 453/2026]2026_pwd_101916_1
03/12/2026 09:30:00
[Reconstruction and Damrikaran work of Barechhina Seraghat Motor Road SH 3 in Almora District. Under Central Road Infrastructure Fund CRIF]2026_pwd_101873_1
18/11/2026 11:30:00
[Improvement and Damrikaran work of Khairna Ranikhet Mohan Motor Road SH 14 Km 0.000 to 26.000 in Ranikhet Assembly Constituency of Almora District. Under Central Road Infrastructure Fund CRIF]2026_pwd_101871_1
18/11/2026 11:30:00
[Improvement and Damrikaran work of Kapkot Karmi Kapkot to Vinayakdhar Motor Road Km. 0.000 Kapkot to Km. 21.800 Karmi in Kapkot Assembly Constituency of Bageshwar District Under Central Road Infrastructure Fund CRIF]2026_pwd_101863_1
18/11/2026 11:30:00
[Under the State Plan (Chief Minister Announcement No. 265/2023) Improvement and metalling work of Dunikhal to Ratighat (Padali) motor road in Nainital Assembly Constituency of Nainital district. ]2026_pwd_101812_1
25/11/2026 11:30:00
[Under The Uttarakhand Road Infrastructure Protection Act 2014, the important located on the motorways in the total length and acquired width of the motorways, the control line and the Landmarks determined by the Revenue Department in PWD Didihat]2026_pwd_100089_2
16/11/2026 09:30:00
[Renewal work by P.C. in Tawaghat-Narayan Ashram motor road under the annual maintenance year 2026-27 (Km. 12, 13, 14, 15, 16, 17, 18, 19, 23 and 24) (Length 10.00 Km)]2026_pwd_101832_1
16/11/2026 09:30:00
[Construction of a new approach road from the bend on the G-Block to H-Block motor road to Kendriya Vidyalaya, New Tehri.]2026_pwd_101753_1
18/11/2026 09:30:00
[Under state sector year 2026 27 stage 2 work on ujjwalpur sem dharkot motor road km3 to top dungaon]2026_pwd_101768_1
13/11/2026 09:30:00
[Improvement and damarikaran work in Thal Nayal Sapoli Bhattigaon (Gol Marh Bhattigaon) link road in Gangolihat Constituency of Pithoragarh District under State Sector (length 3.200 km)]2026_pwd_101763_3
01/12/2026 09:30:00
[Improvement and blacktopping work of Bara to Dhamigaon motor road in Munsyari block of Dharchula constituency of Pithoragarh district under Honrable CM announcement No. 182/2026 (length 7.30 km) ]2026_pwd_101763_2
01/12/2026 09:30:00
[Construction of motor road from Milam motor road to Queeri-Jimia Saipolo in Munsyari block of Dharchula constituency in Pithoragarh district under the State Plan (Phase II Stage 2) (length 5.00 km) ]2026_pwd_101763_1
01/12/2026 09:30:00
[Construction of Konti Bangaon Siloli Sera Chillyalgaon Kireth Motor Road in Bhilangana Block, District Tehri Garhwal, Under State Sector, (Phase II, Stage -II) ]2026_pwd_101665_1
16/11/2026 09:30:00
[Construction of internal roads of Vill. Hazaragrant using interlocking tiles in constituency Jwalapur Distt. Haridwar under State Sector]2026_pwd_101757_1
13/11/2026 09:30:00
[Renewal work of road using PC from Pathri bridge to Vill. Kutubpur motor road in constituency Jwalapur Distt. Haridwar under State Sector]2026_pwd_101755_1
13/11/2026 09:30:00
[Maintenance and painting work at PHS colony residencial building Type-I Type-II Type-III and Type-IV]2026_pwd_101752_1
27/11/2026 07:30:00
[Upgradation of the Existing Motor Bridge from Class B to Class A on Thal Satsiling motor road SH 60 in Didihat Assembly Constituency, District Pithoragarh, Uttarakhand, under the State Plan (Chainage 143.930)]2026_pwd_101729_1
20/11/2026 09:30:00
[Improvement and asphalting work of the Champawat-Khetikhan motor road to Banagadi Bhumeswar to Duglani Motor road in district Champawat under Honorable Chief Minister Announcement Number-202/2026,]2026_pwd_101715_1
16/11/2026 08:30:00
[Under the announcement no. 191/2026 of the honorable chief minister the work of strengthening the road from km13 to 16 of Chilarkhal Sigaddi Kotdwar Pakharau motar road ]2026_pwd_101553_1
12/11/2026 10:00:00
[Upgradation of the Existing Motor Bridge from Class B to Class A on Thal Satsiling motor road SH 60 in Didihat Assembly Constituency, District Pithoragarh, Uttarakhand, under the State Plan (Chainage 144.015)]2026_pwd_101705_2
27/11/2026 09:30:00
[Upgradation of the Existing Motor Bridge from Class B to Class A on Thal Satsiling motor road SH 60 in Didihat Assembly Constituency, District Pithoragarh, Uttarakhand, under the State Plan (Chainage 154.990)]2026_pwd_101705_3
27/11/2026 09:30:00
[Upgradation of the Existing Motor Bridge from Class B to Class A on Thal Satsiling motor road SH 60 in Didihat Assembly Constituency, District Pithoragarh, Uttarakhand, under the State Plan (Chainage 171.740)]2026_pwd_101705_4
27/11/2026 09:30:00
[Upgradation of the Existing Motor Bridge from Class B to Class A on Thal Satsiling motor road SH 60 in Didihat Assembly Constituency, District Pithoragarh, Uttarakhand, under the State Plan (Chainage 134.950)]2026_pwd_101705_1
27/11/2026 09:30:00
[Construction of road using tiles from the main route to Brilliant Academy in Barkhera Pandey village under the State Plan in the Bazpur Assembly Constituency of Udham Singh Nagar district]2026_pwd_101713_1
12/11/2026 06:30:00
[Renewal by P.C of Purodi Hayo-Tagri motor road in Chakrata constituency of Dehradun District under one Time Maintenance.]2026_pwd_101682_1
13/11/2026 09:30:00
[Construction of internal roads by interlocking tiles in Gram Panchayat Prithvipur of Vikasnagar constituency, Dehradun district under State Sector.]2026_pwd_101676_1
12/11/2026 09:30:00
[Supply of Bailey bridge for the construction of pedestrian Bailey bridge over Mayapur Escape Channel, near upstream of Daksh Temple in Kankhal, Distt. Haridwar under Kumbh Mela-2027]2026_pwd_101660_2
02/11/2026 09:30:00
[Supply of Bailey bridge for the construction of Bailey bridge over Mayapur Escape Channel, near Shri Daridrabhanjan Mahadev Temple in Kankhal, Distt. Haridwar under Kumbh Mela-2027]2026_pwd_101660_1
02/11/2026 09:30:00
[Construction of internal road by interlocking tiles and drain at Kedarawala in Vikas Nagar Constituency under State Sector.]2026_pwd_101649_1
11/11/2026 09:30:00
[Reconstruction and Improvement work of Kaichu link motor road via the Bangoli Rajrajeshwari Jagethi route starting from Diwara School in the Tehri constituency of Tehri Garhwal district (Length 4.425 km), under CM Ghosana No. 25-2025.]2026_pwd_101636_1
18/11/2026 09:30:00
[Reconstruction of road from main road to Bhuda Sarad in GramSabha Shripur Bichwa, in Khatima constituency of Udham Singh Nagar district under State Plan.]2026_pwd_101644_1
09/11/2026 11:30:00
[Construction of road from Tanakpur Road to Gausikua village, in Khatima constituency of Udham Singh Nagar District under State Plan.]2026_pwd_101641_1
09/11/2026 11:30:00
[Construction of Tile road from Main Road Towards nahar to Ravi House at west in Baikunthpur Village in Sitarganj constituency of Udham Singh Nagar District under State Plan.]2026_pwd_101635_1
06/11/2026 11:30:00
[Construction of Tile road from Prabhas Das House towards Jeevan Bakshi House in Rajnagar Village in Sitarganj constituency of Udham Singh Nagar District under State Plan.]2026_pwd_101633_1
06/11/2026 11:30:00
[Reneuwal work (Premix Carpet) on the Laluri to Koti Mehra-Majkhet motor road, Dhanaulti constituency of district Tehri Garhwal.]2026_pwd_101589_1
16/11/2026 09:30:00
[Under state sector in block dasholi Construction of road from Ghursal to Saikot STAGE 1]2026_pwd_101585_1
03/11/2026 09:30:00
[Const. of internal roads by interlocking tiles in Dayanagari, Jamunwala Lane No. 2 and 3, Nanda Farm, and THDC Colony, Phulsaini Enclave Phase-2 under Gram Panchayat Gujrada-Karanpur, and Anand Van under Gram Panchayat Jhajra in Sahaspur Constituency]2026_pwd_101581_1
06/11/2026 09:30:00
[Upgradation work of Kakrali Gate Thuligad Bhairav Mandir motor road in the Champawat assembly constituency of Champawat district, under the Central Road Infrastructure Fund. (Length 18.875 km)]2026_pwd_101511_2
17/11/2026 09:30:00
[Strengthening work in km 61 to 76 and Km 115 to 139 of Late Jagmohan Singh Negi motor road (SH-09) in district Pauri Garhwal under Central Road Infrastructure Fund. in Pauri Garhwal ]2026_pwd_101554_1
12/11/2026 09:30:00
[Strengthening work from Km 1.00 to Km 15.00 of Bijorapani kunjhkhal kolakhal paniya basdang jaikot major district road proposed under CRIF in Chaubattakhal Constituency of District Pauri Garhwal ofUttarakhand]2026_pwd_101552_1
12/11/2026 09:30:00
[Renewal work using SDBC on the Freedom Fighter Shri Vishweshwar Dutt Saklani Motor Road (Raipur Kaddukhal) in the Dhanolti assembly constituency, under financial year 2026-27.]2026_pwd_101572_1
16/11/2026 09:30:00
[Solar cat-eyes installation and beautification work of various intersections on the main road and internal roads of Saansad Adarsh Gram Harsan in Bazpur Development Block under the District Plan (Length 1 Job)]2026_pwd_101548_1
07/11/2026 06:30:00
[Under State Sector Balance Work Of Improvement Of Connecting Roads In The Rajpura-Subhashnagar And Tikonia, Malla Gorakhpur Of the Haldwani Assembly Constituency (Nainital District) Through Bituminous Concrete (BC) Surfacing]2026_pwd_101539_1
06/11/2026 11:30:00
[Reconstruction work of the connecting route from Harlalpur main road to the Primary School Harlalpur Minor Canal in Bazpur Development Block under Bazpur Assembly Constituency under the State Plan]2026_pwd_101544_1
07/11/2026 06:30:00
[Renewal work by SDBC of Tehri Hindolakhal Devparyag Vyasghat Bilkhet Motor Road (State Highway) under annual maintenance year 2026-27.(Km. 11 to 21, length- 11 km).]2026_pwd_101564_1
16/11/2026 09:30:00
[ Renewal work of internal roads of New Tehri city by BC under Provincial Division, PWD, New Tehri (length 9.04 km).]2026_pwd_101563_1
16/11/2026 09:30:00
[Improvement work of Motor Road from Motana to Jhiwali under the state plan in Tehri Garhwal district. (length 5.00 km).]2026_pwd_101566_1
16/11/2026 09:30:00
[Reconstruction from the main road in front of the RTO office to the paved road via the houses of Balwinder Singh and others, and house of Pratap Singh Sandhu in Kashipur Assembly Constituency of Udham Singh Nagar district under the State Plan]2026_pwd_101529_1
07/11/2026 06:30:00
[Road furniture work from km 1 to 9 of Jaitpur Dhanauri road in Bazpur Assembly Constituency of Udham Singh Nagar district under the State Plan]2026_pwd_101525_1
07/11/2026 06:30:00
[C/O work of Paldichhina Januatipaldi Karalapaldi Chanauli Jainkaras motor road under the state plan]2026_pwd_101543_1
04/11/2026 05:00:00
[Construction of motor road from Bintoli to Kunjjali Agarkot in development block Garur of Assembly Constituency Bageshwar under State plan]2026_pwd_101535_1
04/11/2026 05:00:00
[Construction of Footbridge from Bunga to Naugaon under the district plan]2026_pwd_101533_1
04/11/2026 05:00:00
[Construction work 18m Span Footbridge in Ladkhet under District Plan]2026_pwd_101532_1
04/11/2026 05:00:00
[Construction of 30 meter span (1.5 lane) P.S.C. girder bridge over Bangla Nala in Ward No. 3 of Gram Sabha Bhattowala, Rishikesh Constituency, Dehradun District under the State Sector.]2026_pwd_101530_1
06/11/2026 09:30:00
[Construction of Footbridge in the Ghatgad stream of Majkot Village under the district plan]2026_pwd_101531_1
04/11/2026 05:00:00
[Under the State Sector, the work of covering the drain constructed on Malviya Road Hindu National College Marg with RCC slab.]2026_pwd_101523_1
05/11/2026 09:30:00
[Construction work of a helipad in Bhangla Patti Dogi village of Narendra Nagar assembly constituency in Tehri Garhwal district.]2026_pwd_101518_1
29/10/2026 08:30:00
[Construction of Lalath Siwalidhar to Laludikhal motor road under the Devprayag constituency of district Tehri Garhwal. (Second phase stage-I) Under state Sector]2026_pwd_101514_1
12/11/2026 06:30:00
[Improvement work of Budhakhet Amkadiya motor road in Champawat Assembly(Champawat District) under the State Plan, pursuant to the Honrable C.M. Announcement no. 209/2026]2026_pwd_101511_1
20/11/2026 09:30:00
[Renewal by PC on the Marchula Syalde Deghat motor road from km 16 to 20 in the Salt Constituency of Almora District Under AR (In Anticipation of Acceptance)]2026_pwd_101503_1
05/11/2026 06:30:00
[Under State Sector Construction of BM/SDBC road on the Internal route of Mithi Bheri in Disttrict Dehradun under Mussoorie Constituency]2026_pwd_101488_1
04/11/2026 09:30:00
[Under State Sector Construction of Interlocking Tiles motor roads in Gram Panchyat Bisht Gaon Chandroti.]2026_pwd_101490_1
04/11/2026 09:30:00
[Under Honble CM Ghoshna No 23 by2024 Improvement and Bituminous work of road from Ghatikhola to Gadduwala Chowk.]2026_pwd_101489_1
04/11/2026 09:30:00
[Strengthening work of motor road from Bahadrabad Rohalki Tiraha to Alipur Sukrasa Pathri Ambuwala under Kumbh Mela Infrastructure Development 2027]2026_pwd_101501_1
09/11/2026 09:30:00
[Improvement and Strengthening of the Jaspur-Kashipur-Bajpur Road under the Central Road Infrastructure Fund (CRIF).]2026_pwd_101497_1
16/11/2026 09:30:00
[Improvement using Bituminous Concrete (BC) of the Kuseri Bend-Silauni motor road in the Pithoragarh Assembly constituency of district Pithoragarh under the State Plan (Length 6.500 km). ]2026_pwd_101506_1
20/11/2026 09:30:00
[Widening of motor road from two lanes to four lanes from Godavari Hotel towards Sherpur (Reliance Petrol Pump Manglore to N.H.-58 COER College via Roorkee city, Other District Road) in assembly constituency Roorkee of district Haridwar under CRIF ]2026_pwd_101509_1
25/11/2026 09:30:00
[Construction of Oligaon near Bungachhina on Thal Motor Road to Aganya in Didihat Constituency of DistrictPithoragarh under the SCSP Scheme]2026_pwd_101483_1
03/11/2026 09:30:00
[Strengthening work by DBM/BC of the Chakrata-Lakhamandal motor road from km 46.00 to 65.340 in the Chakrata Constituency of District Dehradun under the Central Road Infrastructure Fund 2026-27 (CRIF).]2026_pwd_101480_1
06/11/2026 09:30:00
[Construction work to widen the road from Chutki village to Junaija Farm to a width of 30 feet, covering a distance of approximately 1.000 km. in Udham Singh Nagar district Under the District Plan.]2026_pwd_101476_1
28/10/2026 09:30:00
[Construction of the road up to Gaddhapada Village and construction of drains by providing Interlocking Tiles in Gadarpur Assembly Constituency, District Udham Singh Nagar under the State Plan.]2026_pwd_101474_1
28/10/2026 09:30:00
[Surface improvement of the road from Majhrashila Kulwantnagar Road to Bhola Colony Aryanagar Road in Gadarpur Assembly Constituency District Udham Singh Nagar under Honble Chief Minister Announcement No. 792-2026.]2026_pwd_101472_1
28/10/2026 09:30:00
[Construction of the road from Shimla Malsa Girdharpur Road to Neelkanth Colony by providing Interlocking Tiles in Kichha Assembly Constituency District Udham Singh Nagar under the State Plan.]2026_pwd_101468_1
28/10/2026 09:30:00
[Reconstruction of the link motor road from Anandpur Village to G.A.P. School by providing Premix Carpet in Kichha Assembly Constituency, District Udham Singh Nagar under the State Plan.]2026_pwd_101467_1
28/10/2026 09:30:00
[Renewal work by S.D.B.C at Kemptyfall Bypass motor road under Annual Maintenance year 2026-27.]2026_pwd_101477_1
04/11/2026 05:30:00
[Construction of CC road in Gangotri Vihar of Ward number 2 Bhupatwala in constituency Haridwar District Haridwar under State Sector 2026 27]2026_pwd_101464_1
30/10/2026 09:30:00
[Construction of road using BM and SDBC from Municipal Corporation Bridge to Sapna Puliya and in Adarsh Nagar from Malakpur Chungi towards Solani River of Roorkee assembly constituency of District Haridwar Under State Sector.]2026_pwd_101455_1
30/10/2026 08:30:00
[Construction of double-lane, Class A loading bridges (Phase I) to replace the existing single-lane loading bridges at km 11, 17, and 26 of the Mori-Naitwar-Sankri-Jakhol motor road (State Highway-48) in the Purola assembly constituency of Uttarkash]2026_pwd_101441_1
04/11/2026 11:30:00
[Construction of double-lane, Class A loading bridges (Phase I) to replace the existing single-lane loading bridges at km 57, 60, 62, 62 HM (4-6), 67, 72 and 76 of the Tyuni-Purola-Naugaon motor road (State Highway - 17) in the Purola assembly const]2026_pwd_101443_1
04/11/2026 11:30:00
[Construction of double-lane, Class A loading bridges (Phase I) to replace the existing single-lane loading bridges at km 23, 26, 28, 40, 42 and 43 of the Tyuni-Purola-Naugaon motor road (State Highway - 17) in the Purola assembly constituency of Ut]2026_pwd_101442_1
04/11/2026 11:30:00
[Construction of a road using interlocking tiles at Geeta Enclave Phase-2 Ramni Aansingh Haldwani Development Block within the Kaladhungi Assembly constituency of Nainital district under the State Plan]2026_pwd_100989_2
02/11/2026 11:30:00
[Construction of temporary steel pile girder motor bridges to connect Haddipur Parking (Dakshdweep-2) and dismantling work after completion of the Mela, under Kumbh Mela-2027 (including steel material)]2026_pwd_101428_1
06/11/2026 09:30:00
[All work related to the provision of tents and electrical arrangements at the M.B. Inter College grounds, Haldwani the venue for the Saras Mela 2026 27.]2026_pwd_101415_1
02/11/2026 11:30:00
[Work of renewal by microsurfacing on the Jwalapur Sarai Aithal Basedi Khadar SH 66 motor road from km 15 ch 14.800 to km 21 under the Kumbh Mela Infrastructure Development 2027]2026_pwd_101426_1
30/10/2026 07:30:00
[Construction work under State Plan 2026 27 in village Niranjanpur in Laksar Constituency construction of a concrete drainage channel from km 17 of the Bhogpur Raisy SH 67 and interlocking tiles on Niranjanpur Shivpuri MR]2026_pwd_101364_1
30/10/2026 07:30:00
[Renewal work on the approach motor road to the Dobra-Chanthi heavy vehicle bridge (from km 1 to 1.800) by SDB, under the special repairs year 2025-26.]2026_pwd_101375_1
30/10/2026 09:30:00
[improvement and asphalting of nh 121 to simdi road under state sector]2026_pwd_101388_1
02/11/2026 09:30:00
[Construction Of CC Road On Tapadwa Motor Road From Village Chidkhra Under the District Plan Year 2026-27]2026_pwd_101409_1
02/11/2026 06:30:00
[Soling and Improvement Work of Link Road Basai Under the District Plan For The Year 2026-27]2026_pwd_101407_1
02/11/2026 06:30:00
[Construction of CC road in pipal wali gali of Ward no. 2 Bhupatwala in constituency Haridwar Distt. Haridwar under State Sector 2026-27]2026_pwd_101418_1
30/10/2026 09:30:00
[Construction of CC road from transformer to Satighat in Ward no. 30 Chowk Bazar Kankhal of constituency Haridwar Distt. Haridwar under State Sector 2026-27]2026_pwd_101417_1
30/10/2026 09:30:00
[Construction work of various roads by interlocking tiles in Doctorganj of Gram Panchayat Nawabgarh under Vikasnagar Constituency under the State Sector.]2026_pwd_101342_1
30/10/2026 09:30:00
[Patch repair work from Km 01 to 29 on Khabau Motor Road of Chakrata-Lakhamandal State Highway under the Annual Repair for the year 2026-27.]2026_pwd_101336_1
23/10/2026 09:30:00
[Construction of 12 m span RCC culvert at Km 2 of Patal Ganga to Ganai-Molta motor road for Construction of 10 km road from Patal Ganga to Ganai-Molta 2 no bridge at km 5, i.e. 40m and 30m, and 2 at km 8, i.e. 25m and 20m) Under the State Plan in the]2026_pwd_101333_1
31/10/2026 07:30:00
[Construction work of Laxmipur - Chharba link road, Ward No. 9, and other roads by interlocking tiles in Vikasnagar Constituency of Dehradun District under the State Sector.]2026_pwd_101347_1
30/10/2026 09:30:00