ORGANISATION ANALYSIS
Maharashtra Metro Rail Corporation Limited
Maharashtra Metro Rail Corporation Limited
Tender activity
[Outsourcing of Security Services and Housekeeping Services with other essential services under Administration Department and for Mihan and Hingna Depot for a period of 1 year for Nagpur Metro Rail Project.]2026_MMRCL_1352508_1
03/12/2026 10:30:00 AM[Licensing of Advertisement Rights on Advertisement Boards (Gantry) on Exterior of Selected Metro Stations of Nagpur Metro Rail Project for a Period of 05 Years.]2026_MMRCL_1352404_1
10/12/2026 10:30:00 AM[Comprehensive Annual Maintenance Contract (CAMC) for Preventive and Breakdown Maintenance, Load Testing, and Certification of 06 Nos. EOT Cranes of Various Makes and Capacities for a Period of 05 Years at MIHAN and HINGNA Depots, of Maharashtra Metro]2026_MMRCL_1350300_1
02/12/2026 10:30:00 AM[Rectification of Low-Pressure fault and Compressor replacement in Train HVAC System]2026_MMRCL_1349872_1
01/12/2026 10:30:00 AM[Provision of Street/Road Lighting Infrastructure along the roadway from Lokmanya Nagar Square to Lata Mangeshkar Hospital, under Municipal Council, Digdoh, Reach-3, Nagpur.]2026_MMRCL_1349057_1
26/11/2026 10:30:00 AM[P1PD62.2026.Licensing of State-of-the-Art Digital Advertisement Rights at Select Locations inside District Court, Shivaji Nagar, and Mandai Metro Stations of the Pune Metro Rail Project for a Period of 07 (seven) Years.]2026_MMRCL_1348871_1
30/11/2026 10:30:00 AM[Water proofing of 30 Nos of Elevated and Underground Stations of Pune Metro Project]2026_MMRCL_1348710_1
16/11/2026 10:30:00 AM[Maintenance of Operational track, assets of Ballastless track 35.01 RKM, Ballasted Track 4.1 RKM of Mainline and 2 Nos. Depots 8.89 TKM of Nagpur Metro Rail Project for a period of Two Years]2026_MMRCL_1348488_1
26/11/2026 10:30:00 AM[NM1-S AND T-03/2026]2026_MMRCL_1347732_1
17/11/2026 10:30:00 AM[NM1-S-03/2026]2026_MMRCL_1347755_1
02/12/2026 10:30:00 AM[Route Alignment Inspection, feasibility review, preparation of overhead equipment (OHE) pegging plans, OHE layout plans (LOP), Scheme of Sectioning drawings with SP, SSP, SS, Feeding Post Locations, OHE Load Design Calculation for Thane Integral Ring]2026_MMRCL_1347290_1
17/11/2026 10:30:00 AM[Annual Rolling Shutter Maintenance of 30 Nos of Elevated and Underground Stations and 2 Depots of Pune Metro Project for a period of One Year.]2026_MMRCL_1344180_1
22/10/2026 10:30:00 AM[Annual Civil Maintenance of 28 Nos of Elevated and Underground Stations, 12.15 kms of Tunnel and 2 Depots of Pune Metro Project for a period of One Year.]2026_MMRCL_1341294_1
14/10/2026 10:30:00 AM