[Construction of double-lane, Class A loading bridges (Phase I) to replace the existing single-lane loading bridges at km 23, 26, 28, 40, 42 and 43 of the Tyuni-Purola-Naugaon motor road (State Highway - 17) in the Purola assembly constituency of Ut]
PWD