Skip to Content
ORGANISATION ANALYSIS

Chief Engineer Chitrakoot Dhaam (Banda) Zone PWD Banda

Chief Engineer Chitrakoot Dhaam (Banda) Zone PWD Banda

Tenders46
Active46
Results0
Companies0

Tender activity

[New Construction work of Kabrai to Makarbai road]2026_CEBAN_1202474_1
11/13/2026 06:30:00 AM
[Special repair work of KHK road to Chhirka Road]2026_CEBAN_1205155_8
11/13/2026 06:30:00 AM
[Special repair work of Reevan Karhiya to Chhimauli road]2026_CEBAN_1205155_2
11/13/2026 06:30:00 AM
[Special repair work of STB to Chandpurwa road (KHK)]2026_CEBAN_1205155_1
11/13/2026 06:30:00 AM
[Special repair work of Rath Jalalpur to Pathkhuri Link Road in Km-2, 3 and 4(500)]2026_CEBAN_1204219_15
11/13/2026 06:30:00 AM
[Construction Work of 2x1.50 Meter R.C.C. Box Culvert in Place of Damaged Culvert at Km-1 of Charkhari Rath to Padra Link Road]2026_CEBAN_1204219_14
11/13/2026 06:30:00 AM
[ Special repair work of Dandipur shermata Mandir Link Road in Km-1(500) and 2]2026_CEBAN_1204219_13
11/13/2026 06:30:00 AM
[ Special repair work of Mamna to Harsundi Link Road ]2026_CEBAN_1204219_12
11/13/2026 06:30:00 AM
[Special repair work of Amgaon Pawai to Karaundhi link road]2026_CEBAN_1204219_11
11/13/2026 06:30:00 AM
[Special repair work of Dhauhal Atrauli to Birkhera Link Road in Km-1]2026_CEBAN_1204219_10
11/13/2026 06:30:00 AM
[Widening and strengthening work of Kheda Shilajeet to Sarila Town Road (ODR) (Length 9.15 Km)]2026_CEBAN_1204629_2
11/17/2026 06:30:00 AM
[Widening and strengthening work of Jarakhar-Bangra Road (ODR) in Km 1 to 10]2026_CEBAN_1204629_1
11/17/2026 06:30:00 AM
[Special repair work of Mamna to Tai Link Road in Km-1]2026_CEBAN_1204219_9
11/13/2026 06:30:00 AM
[Special repair work of B.P. Road to Kulheda via Basela Link Road ]2026_CEBAN_1204219_8
11/13/2026 06:30:00 AM
[Special Repair work of Jhirmauli Ka Dera Link Road ]2026_CEBAN_1204219_7
11/13/2026 06:30:00 AM
[Construction Work of Damaged Culvert at Km-1 of Chhani-Bhujpur Road]2026_CEBAN_1204219_6
11/13/2026 06:30:00 AM
[Special Repair work of Hamirpur Rath to Lodhipur Shramdan Link Road ]2026_CEBAN_1204219_5
11/13/2026 06:30:00 AM
[ Special repair work of Gahra Chauki to Dhamna Link Road in Km-1 to 2]2026_CEBAN_1204219_4
11/13/2026 06:30:00 AM
[Special repair work of Hamirpur Rath to Akuna Link Road in Km-1 to 2]2026_CEBAN_1204219_3
11/13/2026 06:30:00 AM
[Repair Work of Causeway Situated at Km-5 of Muskara-Bandwa Link Road]2026_CEBAN_1204219_2
11/13/2026 06:30:00 AM
[Special Repair Work from Km-1 of Ratna Yadav Link Road at Mahavir Sthan to Barai Link Road on the Right side via Gahrauli]2026_CEBAN_1204219_1
11/13/2026 06:30:00 AM
[Special Repair Work from Chainage 0.950 to 1.150 of the Link Road from Village Amli Kaur Gadaula Dera to Badku Pal Ka Dera via Machahar and Toliya]2026_CEBAN_1204180_4
11/20/2026 06:30:00 AM
[Construction of a 600 mm diameter Hume Pipe Culvert on the Chaklahar Link Road from Piprahari Bagiya (Chilla) Road.]2026_CEBAN_1204180_3
11/20/2026 06:30:00 AM
[Construction of 1000 mm diameter and 2 Nos. 600 mm diameter Hume Pipe Culverts on the link road from Piprahari to Nari via Mantala, up to Km 5]2026_CEBAN_1204180_2
11/20/2026 06:30:00 AM
[Repair of damaged culverts and construction of a retaining wall at Km 1 of Chhinehara Karwai Link Road]2026_CEBAN_1204180_1
11/20/2026 06:30:00 AM
[Construction work of the Bachhaunda Rajwaha Puliya to Kairy Bachhaunda Link Road including 5 years of maintenance]2026_CEBAN_1205453_1
11/18/2026 06:30:00 AM
[Utility shifting work for the construction of a minor bridge with 3 spans of 15 metres each, in place of the existing causeway at Km 6 of the Bahraich Banda to Chahitara Pachulla Road in District Banda.]2026_CEBAN_1202688_1
11/11/2026 06:30:00 AM
[Janpad Banda Main Tahsil Baberu Ke Antargat Vikas Khand Kamasin Main Amlokhar Tirah ke Pas Helipad ka Nirman Kary ]2026_CEBAN_1205453_2
11/18/2026 06:30:00 AM
[Road safety work from Ken River bridge to Atarra Road bypass via Mahokhar bypass ]2026_CEBAN_1205420_1
11/18/2026 06:30:00 AM
[Widening and strengthening work on the road from km 50 of the Kabrai Varanasi NH-35 passing through Mahua Arjunah up to Syonta village in Banda district Including 5 years of maintenance ]2026_CEBAN_1205335_1
11/18/2026 06:30:00 AM
[Special repair of Kushmi Link Road]2026_CEBAN_1204938_3
11/17/2026 06:30:00 AM
[Repair work on damaged causeway located at km 5,7,8 and 10 of the Manikpur Unchadeeh Road (Other District Road) under special repair]2026_CEBAN_1204938_2
11/17/2026 06:30:00 AM
[Repair work on a damaged causeway located at km 4 of the road (Other District Road) leading from Manikpur via Kalyanpur to Dharkundi Ashram under Special repair]2026_CEBAN_1204938_1
11/17/2026 06:30:00 AM
[CONSTRUCTION WORK OF TYPE-4 -12 HOUSES- AND TYPE-3 -12 HOUSES- RESIDENTIAL COMPLEXES UNDER POOLED HOUSE SCHEME IN BANDA DISTRICT]2026_CEBAN_1195274_1
11/07/2026 12:30:00 PM
[WIDENING AND STRENGTHENING WORK OF GUDHAKALAN ROAD -OTHER DISTRICT ROAD- ---INCLUDING 05 YEARS MAINTENANCE-]2026_CEBAN_1195275_2
11/07/2026 12:30:00 PM
[Special repair work of the Mathna kheda Link road in Km-1-850]2026_CEBAN_1204290_3
11/13/2026 06:30:00 AM
[Special repair work of the Balak Baba Link road In Km-1-950-]2026_CEBAN_1204290_2
11/13/2026 06:30:00 AM
[Construction of a 1x2-00 m span box culvert at chainage 2-800 of the Mau Sikriyan Dera Link Road]2026_CEBAN_1204290_1
11/13/2026 06:30:00 AM
[Road Safety Works at various locations on the Maudaha-Baswari Road (MDR)]2026_CEBAN_1200027_2
11/02/2026 06:30:00 AM
[Road Safety Works at various locations on the Rath-Kalpi-Madaripur Road (SH-130)]2026_CEBAN_1200027_1
11/02/2026 06:30:00 AM
[Construction work of Hamirpur- Rath- Garautha- Gursarai- Jhansi Road (SH-42) (Missing Link) from Chainage 74.550 to 110.360 in District- Jhansi and Hamirpur]2026_CEBAN_1194842_1
11/05/2026 06:30:00 AM
[Widening and strengthening of the road Rath Charkhari via Gudha raod (ODR).]2026_CEBAN_1194838_1
11/03/2026 06:30:00 AM
[Construction of a Boundary wall -length 350 m- at the Dang Bungala in Village Khanna Development Block Kabrai]2026_CEBAN_1199335_1
10/28/2026 06:30:00 AM
[Widening and Strengthening of Kadaura Beri Kurara Manki Road Ch 24.100 to 32.500]2026_CEBAN_1194834_1
10/29/2026 06:30:00 AM
[Special Repair work of Hamirpur Kalpi road (SH-91) km 2 to City Forest Gangwa dera via Brahma Ka dera Marg.]2026_CEBAN_1196917_1
10/29/2026 06:30:00 AM
[ Widening and strengthening work on the Atari Majra road in Chitrakoot district starting from the left side at the 1st kilometer of the Ashok Chauraha Guinya road and passing via the FCI]2026_CEBAN_1196269_1
10/27/2026 06:30:00 AM