ORGANISATION ANALYSIS
WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED
WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED
Tender activity
[Annual Maintenance Contract for Maintenance of PDH Communication Equipment installed at different sub-stations of WBSETCL]2026_SETCL_1048192_1
12/04/2026 09:30:00 AM[Construction of one no. 132kv Line CESC 4 Bay and modification of 132kv Bus Coupler Bay at Howrah 220KV Sub-station under Howrah Area Office, WBSETCL Under ACE KTZ]2026_SETCL_1048445_1
12/03/2026 09:30:00 AM[Erection of superstructure QD and DC Tower and associated works for SC LILO of New Town AAIII-Subhasgram 220KV Line at KLC Bantala 220 KV Sub station under Kasba Area Office WBSETCL]2026_SETCL_1048367_1
12/04/2026 07:30:00 AM[Construction of foundation of two no 33 KV bay at CK. Road 132 KV Sub station and allied its works at CK Road under Midnapore Area Office WBSETCL]2026_SETCL_1048199_1
12/03/2026 09:30:00 AM[Comprehensive Repair and Maintenance Including Inside and Outside Painting roof treatment of B1 Quarter and its allied works at Midnapore 220 kV SubStation Dharma Dist Paschim Medinipur WBSETCL]2026_SETCL_1048185_1
12/03/2026 09:30:00 AM[Supply, Laying and Spreading of Crushed Stone over a Layer of Cement, Sand and Jhama mix (1 5 10) with Land developing and other Allied works at 132 KV Switch Yard Portion (for 05 nos. of bays) and others civil work at Titagarh 132/33 KV Sub-Station,]2026_SETCL_1046144_1
11/18/2026 09:30:00 AM[Construction of New Boundary wall Boundary wall of Length (approx. 150 m, N-W side of 33 kV switch-yard), New Town AA-I 132 kV S/S, Salt Lake Area Office, WBSETCLUnder ACE KTZ]2026_SETCL_1046117_1
11/18/2026 09:30:00 AM[Sub-Station and Transmission Line LINE PACKAGE-C11( 2ND CALL)]2026_SETCL_1046623_1
11/11/2026 10:30:00 AM[Sub-Station and Transmission Line (PACKAGE-C12)]2026_SETCL_1046823_1
11/11/2026 09:30:00 AM[RNJ-AO/01/2026-27 dt. 13.10.2026]2026_SETCL_1046238_1
11/02/2026 11:30:00 AM[SE and AM/JAL-AO/E/T/2025-26/T-28/08]2026_SETCL_1045652_1
10/30/2026 09:30:00 AM[SE and AM/JAL-AO/E/T/2025-26/T-28/07 ]2026_SETCL_1045628_1
10/30/2026 09:30:00 AM[Fabrication, galvanizing, testing, supply and delivery of different substation structures and matching G.I bolts, nuts and washers for Augmentation of 220/132/33 KV Transformer Capacity from (3X160) MVA to (4X160)MVA along with Construction of 1 no. ]2026_SETCL_1044254_1
11/04/2026 09:30:00 AM[CONSTRUCTION OF 10 NOS. 33 KV INDOOR GIS FEEDER BAYS AT SILICON VALLEY 132 KV SUBSTATION UNDER SALT-LAKE AREA OFFICE AND ALLIED WORKS ON TURN KEY BASIS]2026_SETCL_1044247_1
11/04/2026 09:30:00 AM[Construction of RCC Road in 132KV Switchyard and beside Open stackyard in Kharagpur 400KV Sub Station under jurisdiction of Kharagpur 400KV Area Office WBSETCL]2026_SETCL_1043959_1
11/03/2026 09:30:00 AM[ Tit bit civil repair and maintenance work of control room building store office staff colony etc at Lalgola 132 KV Sub Stn New Sagardighi 220 KV GI Sub Station in the district Murshidabad]2026_SETCL_1043480_1
11/04/2026 09:30:00 AM[Tit bit civil repair and maintenance work of control room building store office staff colony etc at Domkal 132 KV GI Sub Station Amtala 132KV Sub Station in the district Murshidabad]2026_SETCL_1043492_1
11/04/2026 09:30:00 AM[Sub-Station and Transmission Line (COMPOSITE PACKAGE-C13)]2026_SETCL_1043400_1
10/28/2026 10:30:00 AM[Procurement of 33 KV, 10/20 MVAR Capacitor Bank with Reactor, NCT and Structures etc. along with 33 KV C and R Panel required for installation of new Capacitor banks at different substation of WBSETCL.]2026_SETCL_1042183_1
10/28/2026 09:30:00 AM[Biennial contract of operation and Maintenance including risk protection of HVWS emulsifier system and Fire hydrant system]2026_SETCL_1041823_1
10/28/2026 09:30:00 AM