ORGANISATION ANALYSIS
Chairman cum MD, TSECL
Chairman cum MD, TSECL
Tender activity
[Collection of Outstanding Revenue through E Wallet Recharge method by engagement of outsource agency of Electrical Sub Division Ranirbazar khayerpur and Bodhjungnagar under ED Ranirbazar of TSECL for 12months]2026_POWER_78798_1
11/17/2026 08:30:00 AM[Collection of outstanding Revenue through E-Wallet Recharge ED Kamalpur]2026_POWER_78678_1
11/25/2026 11:30:00 AM[Collection of Outstanding Revenue through E Wallet Recharge under ED Teliamura]2026_POWER_78630_1
11/20/2026 11:30:00 AM[Construction of HT/LT line including 2x200 KVA Sub-Station with Sub-Station Base for providing new service connection at newly constructed ANM School Building at Durjoynagar, Agartala, Tripura (West) under ESD-Durjoynagar.]2026_POWER_78520_1
11/16/2026 08:30:00 AM[IRCON]2026_POWER_78415_1
10/27/2026 12:00:00 PM[Collection of Outstanding Revenue through E-Wallet Recharge method by engagement of outsource agency under ED Amarpur of TSECL for 18 (eighteen) month.]2026_POWER_78215_1
11/16/2026 11:30:00 AM[Collection of outstanding Revenue through outsourced agency]2026_POWER_78219_1
10/30/2026 11:30:00 AM[Providing 4 (Four) nos. ladder carriable Maruti EECO/Omni Van in good running condition along with service of driver for revenue management, Service connection/ Operation and maintenance of HT/LT line, Sub-Station etc. within the jurisdiction of ESD-]2026_POWER_78123_1
10/30/2026 11:30:00 AM[Providing 5 (Five) nos. ladder carriable Maruti EECO/Omni Van in good running condition along with service of driver for revenue management, Service connection/ Operation and maintenance of HT/LT line, Sub-Station etc. within the jurisdiction of Kama]2026_POWER_78136_1
10/30/2026 11:30:00 AM[Replacement of old 11 KV VCBs by new VCBs at 33/11 KV Pecharthal Sub-Station under ESD - Pecharthal]2026_POWER_78067_1
11/03/2026 06:30:00 AM[Providing 78 Seventy Eight nos casual labour for revenue management Service connection Operation and maintenance of HT LT line Sub Station etc to be engaged under ESD Mohanpur ESD Bamutia ESD Hezamara ESD Lefunga within jurisdiction of ED Mohanpur]2026_POWER_77987_1
10/29/2026 11:30:00 AM[Extension of 11KV XLPE U.G Cable 3 Core,120 Sqmm and Installation of 1000 KVAX3 no DT (one no Spare Txr) for providing of double feeding power supply system at newly construction of G 14 Building at High Court Complex, Agartala under ESD-CC]2026_POWER_77824_1
11/02/2026 10:30:00 AM[Creation of infrastructure and Installation of 11/0.43 KV, 3X1000 KVA Distribution Transformer for system strengthening of three phase power supply system at the High Court of Tripura, Agartala]2026_POWER_77640_1
10/30/2026 08:30:00 AM[Collection of revenue/outstanding electricity bills from the Private Active consumers of Electrical Sub-Division- Jirania, Khumulwng and Mandwi under ED-Jirania of TSECL for 12(twelve) months through outsourcing.]2026_POWER_77531_1
10/27/2026 06:30:00 AM[Collection of Outstanding Electricity Bill from defaulting Consumers of various ESDs under ED-Udaipur of TSECL for 12 (twelve) months through outsourcing.]2026_POWER_77538_1
10/28/2026 09:30:00 AM[Supply Erection Testing and Commissioning of 132 KV and 33 KV Control Relay Panel for 132 KV Sub stations Grid 79Tilla of TPTL]2026_POWER_73551_2
10/30/2026 11:30:00 AM[Construction of 2nd 132 KV Single Circuit Transmission Line from 132 KV SubStation Banduar to Palatana OTPC by HTLS conductor]2026_POWER_75861_2
10/30/2026 11:30:00 AM[Development of 132 kV Line in Line Out LILO of 2nd Circuit of Surjamaninagar TPTL Bodhjungnagar 132 KV Double Circuit Line with HTLS Conductor]2026_POWER_75867_2
10/30/2026 11:30:00 AM[Supply Erection Testing and Commissioning of 33 KV Current Transformer alongwith Control cable for 132 KV Sub stations Grid 79Tilla of TPTL]2026_POWER_73552_2
10/30/2026 11:30:00 AM[Supply Installation and Commissioning of additional 50 nos ABT meters and other associated items for coverage of remaining EHV metering points through AMR under implemented SAMAST project for Energy accounting in TPTL]2026_POWER_77406_1
10/30/2026 11:30:00 AM[Setting up of Smart Centralized Customer Care Centre System on SaaS (System as a Service) basis]2026_POWER_76015_1
10/29/2026 11:30:00 AM[Engagement of Manpower and vehicles under Electrical Division I , EC-I ,TSECL PACKAGE A]2026_POWER_75864_1
10/29/2026 11:30:00 AM[Engagement of Manpower and vehicles under Electrical Division II , EC-I ,TSECL PACKAGE B]2026_POWER_75875_1
10/29/2026 11:30:00 AM[Engagement of Manpower and vehicles underCapital Complex Electrical Division , EC-I ,TSECL PACKAGE C]2026_POWER_75895_1
10/29/2026 11:30:00 AM