Tender activity
[Upgradation/Recapitalization of worn out components including replacement of 01 no. shaft of VT pump unit no. 03 along with allied works installed at Tawi Pump House, Jammu.]2026_IFC_330916_1
11/18/2026 09:30:00 AM[Construction of protection work at GMC Kathua by way of crated revetment in Kathua Khad and restoration work of drainage channel ay GMC Kathua Campus ]2026_IFC_330908_1
11/25/2026 12:30:00 PM[PERMANENT RESTORATION OF CHOKA NALLAH TO DERA MANDIR KHUL RD 0-200MTR AT PLACES (Under SASCI)]2026_IFC_330939_1
11/17/2026 08:30:00 AM[ Operation and Maintenance of irrigation supply of various Gravity Schemes/Khuls/Canals and their branches including removal of encroachments to ensure smooth irrigation season of Irrigation Sub Division Zainapora for the year 2026-27 Phase II]2026_IFC_330933_1
11/17/2026 10:30:00 AM[Construction of lining wall on left side of Palpora Ladi branch of Vehji canal d/s Pipe crossing at Meemandar]2026_IFC_330914_1
11/17/2026 10:30:00 AM[Construction of Flood Protection work in ANS River and its tributaries]2026_IFC_330890_1
11/16/2026 10:30:00 AM[MID/J/99]2026_IFC_330881_1
11/19/2026 06:30:00 AM[Repair to Electric Fitting and Lawn Development etc of Sub Division Office at Harwan]2026_IFC_330207_9
11/16/2026 06:30:00 AM[Removal of Blockages at intake of Kut Khul at RD 0 mtrs]2026_IFC_330207_5
11/16/2026 06:30:00 AM[Development of Lawn at Jammu Guest House]2026_IFC_330207_8
11/16/2026 06:30:00 AM[Maintenance of Guest House at Shivpora]2026_IFC_330207_7
11/16/2026 06:30:00 AM[Remodelling of Catch Water Drain near Golf Course Sidhra.]2026_IFC_330742_1
11/23/2026 10:30:00 AM[Supply, Installation, Testing and Commissioning (STIC) of Automatic Water Level Recorder (AWLR) with Integrated Automatic Rain Gauges (ARG), including Civil Works/ Construction at Bikram Chowk Bridge on River Tawi.]2026_IFC_330740_1
11/23/2026 10:30:00 AM[Urgent Repairs to Gear Box Assembly of C-12 CATERPILLAR Engine of Ital Jhelum Dredger Deputed at Johama of Flood Mechanical Division Baramulla.]2026_IFC_330736_2
11/16/2026 03:30:00 AM[Urgent replacement of Damaged Hydraulic Hose pipe of Budshah II Dredger deputed at Tulibal Sopore of Flood Mechanical Division Baramulla.]2026_IFC_330736_1
11/16/2026 03:30:00 AM[Providing of Light inspection vehicle SUV of make model not older than 2024, on rent/hire charges basis for a period of one year for official use of Executive Engineer Jal Shakti IFC Division Rajouri for inspection of Government works ]2026_IFC_330716_1
11/14/2026 10:30:00 AM[Restoration and improvement of Dingla DI Khul at places damaged due to flash and heavy rains in July and August 2026 in respect of Irrigation Sub Division Poonch.]2026_IFC_330715_1
11/16/2026 10:30:00 AM[MID/J/98]2026_IFC_330640_1
11/16/2026 06:30:00 AM[Operation maintenance Watch and Ward of machinery and electromechanical equipments installed at LIS Phalyana Khul Rajouri]2026_IFC_330565_1
11/20/2026 07:30:00 AM[Construction of lining wall on left side of Lal Nad Khul near the orchard of Abdul Hameed Malik and others at Malik Mohallah Hergam Shopian.]2026_IFC_330651_3
11/13/2026 10:30:00 AM[Construction of irrigation khul from land of Shahnaza Akhter and others at Zawoora Shopian ]2026_IFC_330651_2
11/13/2026 10:30:00 AM[Construction of irrigation channel near land of Mohd. Shafi Shah and Others at Lal Nad Mailk Mohallah Pinoora Dal Shopian]2026_IFC_330651_1
11/13/2026 10:30:00 AM[Consultancy Services for Structural Hydraulic design of various Hydraulic Structures, including soil investigation Topographical Survey Geotechnical Investigation formulation of both the reports duly Vetted by DIQC NIT IIT for various components fo]2026_IFC_330654_1
11/16/2026 10:30:00 AM[Providing of 1 No. inspection vehicle for Official use of Executive Engineer Jal Shakti IFC Division Rajouri on Daily Monthly basis]2026_IFC_330582_1
11/12/2026 04:30:00 AM[MID/J/97]2026_IFC_330536_1
11/16/2026 06:30:00 AM[MID/J/96]2026_IFC_330531_1
11/16/2026 06:30:00 AM[Providing and Topping of Transformer Oil along with allied works at LIS Rajal]2026_IFC_330502_1
11/20/2026 08:30:00 AM[Improvement/strengthening of D-10 of Main Tawi Canal from RD 1200-1500M at places by way of pitching/grouting]2026_IFC_330432_3
11/21/2026 10:30:00 AM[Upgradation of Main Tawi Canal by way of restoration of damaged pannels of canal by way of providing and laying of cement concrete from RD 1957-2157M.]2026_IFC_330432_2
11/21/2026 10:30:00 AM[Improvement/restoration of canal section near RD 800M including construction of tractor crossing for benefits of farmers at village Khadergal Pyt Patli Block Bari Brahmana.]2026_IFC_330432_1
11/21/2026 10:30:00 AM[Maintenance of office building of the Executive Engineer, MID Zaldagar Srinagar.]2026_IFC_330569_1
11/17/2026 08:30:00 AM[Restoration of flood protection works of Chandaji Nallah ]2026_IFC_330534_1
11/12/2026 10:30:00 AM[Execution of Civil and Mechanical works for Improvement of conveyance efficiency of canals.]2026_IFC_330405_3
11/12/2026 01:25:00 PM[Renovation of Residential Quarters near Guest House at Ujh Barrage.]2026_IFC_330405_2
11/12/2026 01:25:00 PM[Renovation of RTIC Guest House at Kathua.]2026_IFC_330405_1
11/12/2026 01:25:00 PM[Construction of Retaining wall near H/O Mohammad Ramzan Mir to H/O Ghulam Muhammad Mir at Gulzarpora Rawalpora]2026_IFC_330443_1
11/11/2026 12:30:00 PM[Providing and Fitting of 50 mm dia. Air release valve along with allied accessories at L.I.S Rajal]2026_IFC_330425_1
11/19/2026 08:30:00 AM[Fabrication, Providing, Fitting, Installation, Testing and Commissioning of Slip Ring Assembly along with allied works for 400 HP, HT BHEL make vertical solid shaft 6.6KV Motor No 1 installed at LIS Raja]2026_IFC_330416_1
11/19/2026 08:30:00 AM[Fabrication, Providing and Fitting of Carbon Brushes, Slip Ring Assembly and Flexible Copper Conductor to 485KW/650HP BHEL Make 3-Phase, 50 Hz, 6.6KV Vertical Solid Shaft HT Induction Motor with allied works installed at LIS Ranjan]2026_IFC_330406_1
11/19/2026 08:30:00 AM[MID/J/92]2026_IFC_330387_1
11/13/2026 06:30:00 AM[Construction of flood protection work in various local nallah of River Tarnah at places under FCSD Hiranagar in block Dinga Amb]2026_IFC_329639_1
11/11/2026 12:30:00 PM[Restoration of Khania Khul]2026_IFC_328070_3
11/11/2026 03:30:00 AM[Construction of Lining wall on outfall cahnnel of Wussan Lolpora Khul in village Chichilora]2026_IFC_330451_2
11/12/2026 10:30:00 AM[Construction of Protection works on Right side Hitchari Nallah to safeguard the RWM of WSS Hardaboora Budran]2026_IFC_330451_1
11/12/2026 10:30:00 AM[Construction of 0.1 MGD SSFP for Gratbal Daji Batoo and adjacent area including allied works]2026_IFC_330429_1
11/12/2026 10:30:00 AM[Supply, Providing of Commercial gas filled cylinder 19 kg excluding cost of cylinder and including all carraiges upto actual site, avg. distance 08 Kms The actual payments of the filled gas cylinder shall be made as per the rates which ]2026_IFC_330382_1
11/14/2026 10:30:00 AM[Restoration of Cement Concrete Lining of Main Ravi Canal from RD 37400M to 37900M and RD 38500 to 39500 m at Spots including restoration / protection of left side Canal Embankment by providing walling section and repair of canal syphon at RD 38696M.]2026_IFC_330266_6
11/18/2026 01:25:00 PM[Restoration of Cement Concrete Lining of Main Ravi Canal from RD 35880 to 36200M and RD 36600 to 36800 including silt clearance and repair of canal syphon at RD 35840m and RD 36782m]2026_IFC_330266_5
11/18/2026 01:25:00 PM[Restoration of Cement Concrete Lining of Main Ravi Canal from RD 34100M to 35100M at Spots including repair of MRC Aqueduct at RD 35019m.]2026_IFC_330266_4
11/18/2026 01:25:00 PM[Restoration of Cement Concrete Lining of Main Ravi Canal from RD 32450 to 33400 m, including repairs to MRC Aqueduct at RD 32583 m and MRC Syphon at RD 33692 to 33800M.]2026_IFC_330266_3
11/18/2026 01:25:00 PM[Improvement and Strengthening of Main Ravi Canal from RD 23550 to 24000M by way of providing canal lining and repair/renovation of escape gate at RD 24000M including allied civil works.]2026_IFC_330266_2
11/18/2026 01:25:00 PM[Remodelling/ Improvement of the MRC between RD 19200 to 19600M by providing cement concrete lining.]2026_IFC_330266_1
11/18/2026 01:25:00 PM[Construction of lining wall on brach of Noori Khul near the land of Ab. Gani Boda and others at Sheikh Mohalla Bongam Shopian Phase 1]2026_IFC_330227_3
11/11/2026 10:30:00 AM[Restoration of supplies by way of Providing and laying of GI Pipes at Sartajan near land of Gh. Mohammad and others block Zainapora]2026_IFC_330227_2
11/11/2026 10:30:00 AM[Augmentation of Irrigation supplies for Wadarbur at Chitragam block Chitragam]2026_IFC_330227_1
11/11/2026 10:30:00 AM[eNIT No MICD 32 of 2026-27 Dated 04.11.2026 Providing, Supply and Installation of Solar powered 12 watt LEDs along with Solar panels, battery backup and ST poles for various TWIS for Kashmir Division]2026_IFC_330242_4
11/11/2026 05:30:00 AM[eNIT No MICD 32 of 2026-27 Dated 04.11.2026 Replacement of Worn-out 7000 GPH discharge, 175 Meters of dynamic head submersible pumping units at Tube Well Irrigation scheme Chichiloora Tangmarg]2026_IFC_330242_3
11/11/2026 05:30:00 AM[eNIT No MICD 32 of 2026-27 Dated 04.11.2026 Replacement of Worn-out 8000 GPH discharge, 130 Meters of dynamic head submersible pumping units at Tube Well Irrigation scheme Renzipora Pulwama]2026_IFC_330242_2
11/11/2026 05:30:00 AM[eNIT No MICD 32 of 2026-27 Dated 04.11.2026Replacement of Worn-out 10000 GPH discharge, 150 Meters of dynamic head submersible pumping units at Tube Well Irrigation scheme Ghoom Ahmad Pora Baramulla]2026_IFC_330242_1
11/11/2026 05:30:00 AM[Improvement and Strengthening of Main Ravi Canal from RD 22500 to 23500M by way of providing Canal Lining]2026_IFC_330021_7
11/16/2026 01:25:00 PM[Improvement / Strengthening of MRC from RD 30900 to 32250M at different places by way of providing Cement Concrete lining.]2026_IFC_330129_8
11/17/2026 01:25:00 PM[Improvement / Strengthening of MRC from RD 28000 to 30150M at different places by way of providing Cement Concrete lining.]2026_IFC_330129_7
11/17/2026 01:25:00 PM[Improvement/Strengthening of MRC from RD 26000 to 27700M at different places by way of providing Cement Concrete lining including repair/protection to existing flare walls of syphon kathera 1st and kathera 2nd.]2026_IFC_330129_6
11/17/2026 01:25:00 PM[Improvement / Strengthening of Main Ravi Canal from RD 24492 to 24900M at different places by way of providing Cement Concrete lining including improvement to drainage culvert.]2026_IFC_330129_5
11/17/2026 01:25:00 PM[Improvement and Strengthening of Main Ravi Canal from RD 24200 to 24492 by way of providing canal lining, including repair of canal syphon at RD 24045 and strengthening of Head Regulator of D2 at 24492M]2026_IFC_330129_4
11/17/2026 01:25:00 PM[Remodelling of the MRC by providing M-20 Cement Concrete Lining between RD 17220 to 17650M.]2026_IFC_330129_3
11/17/2026 01:25:00 PM[Strengthening of Main Ravi Canal from RD 10760 to 11000m and RD 12250 to 12280m by way of walling and canal lining.]2026_IFC_330129_2
11/17/2026 01:25:00 PM[Strengthening of Main Ravi Canal from RD 9010 to 9110m , RD 11690 to 11740m,RD 11900 to 11930M, RD11980 to 12120 and 13260 to 13290m by way of walling and canal lining]2026_IFC_330129_1
11/17/2026 01:25:00 PM[Maintenance of Guest House at Shivpora]2026_IFC_330207_4
11/09/2026 12:30:00 PM[Removal of Blockages at intake of Kut Khul at RD 0 mtrs]2026_IFC_330207_1
11/09/2026 12:30:00 PM[MID/J/91]2026_IFC_330075_1
11/11/2026 06:30:00 AM[Improvement and Strengthening of Main Ravi Canal from RD 21400 to RD 22400 m by way of providing Canal Lining]2026_IFC_330021_6
11/16/2026 01:25:00 PM[Remodelling Improvement of MRC between RD 19800-20650m by providing cement concrete lining]2026_IFC_330021_5
11/16/2026 01:25:00 PM[Strengthening of the Main Ravi Canal from RD 14900 to 14950M, RD 15050 to 15100M and RD 15600 to 15700M .]2026_IFC_330021_4
11/16/2026 01:25:00 PM[Improvement/Strengthening of Main Ravi Canal by way of cement concrete lining from RD 9965-10170m, RD10240-10400m and RD 13200-13600m.]2026_IFC_330021_3
11/16/2026 01:25:00 PM[Strengthening and Improvement of the Maggar Canal Syphon of the Main Ravi Canal RD 20896M.]2026_IFC_330021_2
11/16/2026 01:25:00 PM[Revetment of Up Stream flare wall of Karyali Aqueduct.]2026_IFC_330021_1
11/16/2026 01:25:00 PM[Construction of Culvert on Kaaw Kull at Handoora]2026_IFC_330031_1
11/12/2026 12:30:00 PM[MID/J/90]2026_IFC_330019_1
11/11/2026 06:30:00 AM[Construction of Protection wall RD15800m at Pandach]2026_IFC_330029_2
11/07/2026 10:30:00 AM[Construction of Retaining wall at Kachan Ganderbal]2026_IFC_330029_1
11/07/2026 10:30:00 AM[Checking of overflow by way of construction of lining wall on R/s of Gam Khul (Gamud), B/O Sonman near RD 375 mtrs at Khandipora.]2026_IFC_330001_4
11/10/2026 08:30:00 AM[Construction of lining wall on R/S of Amnoo Canal near RD-100 mts.]2026_IFC_330001_3
11/10/2026 08:30:00 AM[Restoration of Breached spot on Parghan Ladi near RD 1100 mtrs.]2026_IFC_330001_2
11/10/2026 08:30:00 AM[Checking of leakages by way of RCC Jacketing near RD 3980 mts of Main Banimullah Canal.]2026_IFC_330001_1
11/10/2026 08:30:00 AM[Construction of Flood Protection work in ANS River and its tributaries.]2026_IFC_329970_2
11/07/2026 04:30:00 AM[Dumka Khul Renovation and Strengthening of Khul from RD 0 to 50 m by construction of parapet walls and laying of channel bed in cement concrete]2026_IFC_329970_1
11/07/2026 10:30:00 AM[River Jhelum Slope Stabilization by way of Geo Material/Geo Bags on Left Protection Bund near RD 112.150 KM for a length of 57 M and RD 123.000 KM for a length of 100 M]2026_IFC_329962_1
11/06/2026 10:30:00 AM[eNIT No MICD 31 of 2026-27 Dated 31.10.2026 Central Heating System 2026-27]2026_IFC_329960_1
11/09/2026 05:30:00 AM[MID/J/89]2026_IFC_329956_1
11/10/2026 06:30:00 AM[Supply Fitting Fabrication of material for Upgradation of existing temporary racks and DG shed structure alongwith allied electromechanical works at Ujh Barrage under M and S]2026_IFC_329928_1
11/14/2026 12:30:00 PM[Construction of flood protection anti-erosion work by way of crates on both sides from Satrajan at village Chitragam.]2026_IFC_329925_2
11/10/2026 12:30:00 PM[Construction of flood protection work on left side upstream Lelhar Bridge at Kakapora RD 35500m to RD 35600m ]2026_IFC_329925_1
11/10/2026 12:30:00 PM[MID/J/88]2026_IFC_329923_1
11/10/2026 06:30:00 AM[Establishment of SE, Hydraulic Bandipore Office]2026_IFC_329907_1
11/07/2026 10:30:00 AM[Realignment and shifting of affected raw water main and sub-mains from Manarnad to Ziyarat Sharief Kudara ]2026_IFC_329905_1
11/07/2026 10:30:00 AM[Improvements and Upgradation of Wani Arm Canal]2026_IFC_329868_1
11/21/2026 10:30:00 AM[MID/J/87]2026_IFC_329841_1
11/07/2026 06:30:00 AM[Chandak Khul IMP/MOD of Khul from RD 0 To 3600 Mtr]2026_IFC_329821_1
11/09/2026 12:30:00 PM[Providing / fitting of carbon brushes, bearings and allied components of 400 HP / 300 kW GEC make 3-phase induction motors, bearings / gland packings for HSC pumps, coupling bolts ,studs,V-gasket for dresser coupling, along with allied works at LIS R]2026_IFC_329807_1
11/13/2026 08:00:00 AM[Providing/Fitting by way of Replacement of Mechanical Control Valves i.e. 250 mm Foot Valve (1 no.), 300 mm Sluice Valve (1 no.) and 200 mm dia MS Pipe along with other allied works at LIS Nazlachak]2026_IFC_329795_1
11/19/2026 08:30:00 AM[Providing, Fitting, Installation, Testing and Commissioning of 5 HP Priming Pump with other allied works at LIS Kathar]2026_IFC_329792_1
11/19/2026 08:30:00 AM[LIS Brakpora Providing and fitting of 3.5 Cusec,147 M Head Pumping unit.]2026_IFC_329749_2
11/11/2026 05:30:00 AM[LIS Khiram Providing and fitting of 6 cusec, 106 M Head pumping unit along with 370 HP motor.]2026_IFC_329749_1
11/11/2026 05:30:00 AM[IRRLA2627100013- Construction of LIS Seri talla (Chaknobad) under NABARD]2026_IFC_329654_1
11/16/2026 09:30:00 AM[Strengthening of D-12 between RD 2100-2700M and D-11A between RD 1380-1420M at spot.]2026_IFC_329623_3
11/06/2026 10:30:00 AM[Improvement/ Strg. Of D-11 of NPC RD 1090-1400M at spot.]2026_IFC_329623_2
11/06/2026 10:30:00 AM[Improvement/ Upgradation of D-3 of Main Pargwal Canal between RD 1400-1430M]2026_IFC_329623_1
11/06/2026 10:30:00 AM[Providing, installation , testing and commission of 250-400Ipm priming pumpset and allied works at LIS Lethpora]2026_IFC_329665_2
11/07/2026 05:30:00 AM[Manufacturing, providing, fitting and installation of MS 300mm dia Foot valve at LIS Samboora.]2026_IFC_329665_1
11/07/2026 05:30:00 AM[Restoration of Lal nad Khul by way of construction of cement concrete channel and lining with bed treatment near land of Bashir Pandit]2026_IFC_329562_10
11/05/2026 10:30:00 AM[Construction of lining wall on either sides of Gagren Ladi branch of Vehji canal near Bondal near Degree college]2026_IFC_329562_9
11/05/2026 10:30:00 AM[Jacketing/ raising of D2 canal branch of Zainapora canal at Tumberkhun, Durpora Zainapora]2026_IFC_329562_8
11/05/2026 10:30:00 AM[Raising of D2 canal on both sides upstream delivery tank at Durpora of Zainapora canal]2026_IFC_329562_7
11/05/2026 10:30:00 AM[Bed treatment of Melhura canal U/s flume from RD 4700 M, Satheldar Minor, restoration of offtake breach and repairs to gates on Melhura canal]2026_IFC_329562_6
11/05/2026 10:30:00 AM[Construction of Irrigation channel/ water channel from huose of Ab. Aziz Dalal to land of Ab. Hamid hajama and others at Sheikh Mohallah Bongam Shopian]2026_IFC_329562_5
11/05/2026 10:30:00 AM[Construction of irrigation channel near land of Mohd. Shafi Shah and Others at Lal Nad Mailk Mohallah Pinoora Dal Shopian]2026_IFC_329562_4
11/05/2026 10:30:00 AM[Restoration of chowgam Ladi branch of Vehji canal by way of protection wall from land of Rayees Ahmad Lone to land of Mushtaq Ahmad Lone at Aikha Dal Chowgam Shopian]2026_IFC_329562_3
11/05/2026 10:30:00 AM[Construction of lining wall on both sides of Noori Khul near the house of Mohd. Yousuf Malik and others at Bongam Shopian]2026_IFC_329562_2
11/05/2026 10:30:00 AM[Development of Dhobi Khul from Shop of Riyaz Ah Allahi to main bridge near RnB Division Shopian]2026_IFC_329562_1
11/05/2026 10:30:00 AM[Restoration of Electro-Mechanical components along with other allied works at flood effected Lift Irrigation Scheme Bindala Mang at district Rajouri.]2026_IFC_329579_1
11/06/2026 07:30:00 AM[Construction of Cement concrete drain near Orchard of Mohammad Sidiq Malik towards land of Ghulam Mohammad and others at Khurwan Wangipora]2026_IFC_329585_2
11/06/2026 10:30:00 AM[Construction of irrigation khul from land of Shahnaza Akhter and others at Zawoora Shopian ]2026_IFC_329553_1
11/04/2026 10:30:00 AM[Construction L/wall on Athgami Khul right side NHO Fayaz Ahmad Mir, S/O M Amin Mir and others at Gagren Shopian.]2026_IFC_329553_2
11/04/2026 10:30:00 AM[Raising of FP Work on Hakura Nallah at Bunbagh at RD KM 14 350 Mtrs]2026_IFC_329575_1
11/04/2026 12:30:00 PM[Replacement by way of Providing Fitting Installation Testing and Commissioning of 3.5 cusec discharge 36 mtr Head HC Pump compatible with existing 3 phase Induction Motor with allied works at LIS Bhagwanachak]2026_IFC_329563_1
11/17/2026 09:30:00 AM[Desilting/Clearing of 914 mm dia. M.S. rising main No. 02 filled with silt at Tawi pump House. ]2026_IFC_329564_1
11/10/2026 09:30:00 AM[Providing Fabrication Fitting Installation Testing and commissioning after designing of 800 Amps 11KV 6.6 KV HT Panel Incomer VCB unit No. 01 and Auxiliary VCB unit No. 01 including control safety devices at LIS Rajal]2026_IFC_329560_1
11/17/2026 09:30:00 AM[Upgradation/Recapitalization of worn out components including replacement of 01 no. shaft of VT pump unit no. 03 along with allied works installed at Tawi Pump House, Jammu.]2026_IFC_329556_1
11/10/2026 09:30:00 AM[C/O Flood Protection Bund near Graveyard at Khull A. ]2026_IFC_329546_3
11/18/2026 12:30:00 PM[Construction of Gate at Wanduna Melhora Shopian on L/S of Veshow Nallah]2026_IFC_329546_2
11/18/2026 12:30:00 PM[Construction of Toe Crate at Village Kelam Gund on Right of Veshow Nallah]2026_IFC_329546_1
11/18/2026 12:30:00 PM[Improvement of Kushwani Khul Phase second]2026_IFC_329537_1
11/13/2026 12:30:00 PM[Tangwini Nallah Construction and strengthening of embankments on BS of Nallah US Tangwini Bridge ]2026_IFC_329513_1
11/17/2026 10:30:00 AM[MID/J/86]2026_IFC_329484_1
11/04/2026 06:30:00 AM[Providing and Fitting of New Mica Moulded Copper Coils to 400 HP/300 KW, BHEL Make, 3 Phase, 50 Hz 6.6KV, Slip Ring Type, vertical solid shaft HT Motor (Stator and Rotor) unit No. 05 installed at LIS Rajal.]2026_IFC_329482_1
11/16/2026 09:30:00 AM[Repairs to 100 KVA LT Electric Transformer along with allied works at LIS Gailla]2026_IFC_329477_1
11/05/2026 07:30:00 AM[Providing/fitting of 02 nos. inverter battery sets (each comprising of 500-watt Inverter along with battery 12V, 150AH) at Tawi Pump House, Jammu ]2026_IFC_329473_1
11/09/2026 09:30:00 AM[Replacement of damaged electro mechanical components for 6.6 KV, 800 Amp, 250 MVA HT control panels installed at Tawi Pump House Jammu.]2026_IFC_329468_1
11/09/2026 09:30:00 AM[Construction of Guage at Arihal Kull at Gulabagh Nowdal]2026_IFC_329407_2
11/10/2026 12:30:00 PM[Construction of Guage at Lazz Khull at Doonigund Baragam]2026_IFC_329407_1
11/10/2026 12:30:00 PM[Restoration of supplies by way of Providing and laying of GI Pipes at Sartajan near land of Gh. Mohammad and others block Zainapora]2026_IFC_329418_2
11/02/2026 10:30:00 AM[Augmentation of Irrigation supplies for Wadarbur at Chitragam block Chitragam]2026_IFC_329418_1
11/02/2026 10:30:00 AM[Construction of catchment Water Drain for diverting flood water to adjoining Nallah at village Satani]2026_IFC_329485_1
11/02/2026 07:30:00 AM[Restoration of flood protection works of Chandaji Nallah ]2026_IFC_329386_1
11/03/2026 10:30:00 AM[Replacement of 01 no lubrication pumps along with allied accessories/works at Tawi Pump House RTIC Jammu.]2026_IFC_329336_1
11/04/2026 09:30:00 AM[MID/J/85]2026_IFC_329335_1
11/04/2026 06:30:00 AM[Supply and delivery of refilled 19kg commercial LPG cylinders to IFC Division Srinagar during the financial year 2026 27]2026_IFC_329295_1
11/03/2026 12:30:00 PM[Providing fitting and Fabrication of new stainless steel plates of running length 70M including strengthening to damaged to damaged portion of I Section sill beam girders of radial gates along with electromechanical works at Ujh barrage]2026_IFC_329254_1
11/07/2026 12:30:00 PM[Modernization of Munad Guffan Irrigation Scheme for enhanced Irrigation efficiency, Ladh]2026_IFC_329314_1
10/30/2026 10:30:00 AM[Recapitalization of trash racks gate leaf winch machines 02 05 ton and their machinery parts at various RDs viz 8350 m 25800 m etc in lieu of damaged ones installed on Tawi Ravi Raya canal]2026_IFC_329118_1
11/04/2026 11:00:00 AM[MID/J/82]2026_IFC_329190_1
10/31/2026 06:30:00 AM[MID/J/83]2026_IFC_329204_1
10/31/2026 06:30:00 AM[LIS Miari Providing Fitting Commissioning Installation of FASD cum Panel one incomer two outer for two No. three Phase Motors consisting of one 140 Amp. Contactor. Recapitalization of 1 X 75 HP Electric Motor along with reconditioning of 3 Cusec Pump]2026_IFC_329141_1
11/12/2026 07:30:00 AM[Supply, Installation, Testing and Commissioning of 10 Cusec, 15M Head Horizontal Pumping Equipment at LIS Gundi Rehman.]2026_IFC_329155_1
11/02/2026 08:30:00 AM[Bemina Nallah-Construction of cement concrete retaining wall at vulnerable spots at wani Mohalla, Yousuf Abad d/s Rd2350m D/S Rd3780m up to confluence point FSC Mithayi bund at graveyard Khumani chowk.]2026_IFC_329078_1
11/09/2026 10:30:00 AM[Construction of Intake supply channel Sump Pump House delivery tank anchor saddle blocks for rising main including installation testing and commissioning of electro mechanical components LIS Adijin]2026_IFC_329074_1
11/13/2026 05:30:00 AM[Construction of Crate Protection Work Nallah near Ziyarat Kunderdhan Block Chassana under Untied Grants of District Capex Budget 2026-27]2026_IFC_329099_1
10/29/2026 10:30:00 AM[IRRSS2627100477-(CONSTRUCTION OF FLOOD PROTECTION WORKS ALONG LEFT RIGHT BANKS OF ZAMBIR NALLAH NOWSHERA TAWI AND THEIR TRIBUTARIES IN NOWHSERA CONSTITUENCY)]2026_IFC_329020_1
11/03/2026 09:30:00 AM[Repair to 200mm Dia Foot Valve of Pumping Unit no. 2, Replacement of Damaged Electric Pole and Repair to 100 KVA Electrical Transformer at LIS Kot]2026_IFC_328955_1
11/02/2026 08:30:00 AM[Repairs to 4 Cusec Discharge HC Pump and 100 HP 3 Phase Induction Motor at LIS Manda2]2026_IFC_328965_1
11/02/2026 08:30:00 AM[MID/J/81]2026_IFC_329024_1
10/31/2026 06:30:00 AM[Improvement of Disty. 4B by way of walling section near RD 950 m and near RD 1000 M - 1400 M including damaged fall.]2026_IFC_329017_1
11/07/2026 12:30:00 PM[Restoration of Khania Khul]2026_IFC_328070_2
10/28/2026 10:30:00 AM[Construction of RCC wall 150 Mtrs in Length along the right side of Dori Kassi Nallah near vikas bahsin and others.]2026_IFC_328947_2
10/30/2026 12:30:00 PM[IMP/MOD of Right chajjla khul from RD 0 TO 800 M at places]2026_IFC_328947_1
10/30/2026 12:30:00 PM[Construction of Flood Protection Work in Thanna Nallah at vulnerable spots]2026_IFC_328903_5
10/30/2026 10:30:00 AM[Upper Lower Sandal Khul Improvement Renovation of Khul from Rd 825 to 845 m and rd 400 to 1250m rd 2340 to 2360 by construction of r wall and laying of channel bed]2026_IFC_328903_4
10/30/2026 10:30:00 AM[Tralla Upper Khul Improvement and Strengthening of Khul by Construction of parapets and retaining walls in cement concrete 1 3 6 and laying of channel bed in cement concrete 1 2 4) from rd 150 to 220 m and 280 to 300 m]2026_IFC_328903_3
10/30/2026 10:30:00 AM[Lower Upper Potha Khul Improvement and Strengthening of Lower Khul Rd 0 to 50 m Rd 240 to 450 m and upper khul rd 50 to 85 m by construction of parapets and retaining walls in cement concrete 1 3 6 and laying of channel bed in cement concrete 1 2 4]2026_IFC_328903_2
10/30/2026 10:30:00 AM[Construction of Bulli Ghambir To Chowa Khul RD 0 to 1000 mtrs]2026_IFC_328903_1
10/30/2026 10:30:00 AM[Ghambir Mughlan Main Khul Improvement and Strengthening of Khul by construction of parapets and retaining walls in cement concrete 1 3 6 and laying of channel bed in cement concrete 1 2 4 from rd 300 to 550 m]2026_IFC_328895_1
10/30/2026 10:30:00 AM[Desilting and Jungle Clearance of Holy Pond Jhiri and allied works for smooth functioning of Annual Jhiri Festival.]2026_IFC_328904_2
10/27/2026 12:30:00 PM[Construction of diversion/bund on D2B of MRC for filling of Holy Pond at Bawa Talab and Jungle Clearance and desilting of D2B Dub Karam Din Kalyanpur 1st and 2nd Khul of D1 of MRC and allied works for smooth functioning of Annual Jihri Festival 2026]2026_IFC_328904_1
10/27/2026 12:30:00 PM[Up-gradation of 100KVA to 150KVA Transformer with other allied works at LIS Kot ]2026_IFC_328829_1
11/09/2026 09:30:00 AM[Up gradation, Improvement of LIS by way of replacement of worn out, rusted damaged sections of 300mm dia Mild Steel Rising Main with other allied works at LIS Kotgarhi HL ]2026_IFC_328824_1
11/09/2026 09:30:00 AM[Providing, Fitting, Installation, Testing and Commissioning of 5 HP Priming Unit with other allied works at LIS Meeni ]2026_IFC_328820_1
11/09/2026 09:30:00 AM[Improvement of distributary 3F by way of walling section and allied works near RD 2100M.]2026_IFC_328741_2
11/05/2026 12:30:00 PM[Improvement of distributary 3F by way of walling section near RD 100M and 500M.]2026_IFC_328741_4
11/05/2026 12:30:00 PM[Construction of protection wall from the land of Gh. Hussain Dar to the land of Nazir Ahmad Dar on Zabbar canal at Karipora]2026_IFC_328708_4
10/29/2026 10:30:00 AM[Construction of cement concrete lining wall on left side of Check Kali khan M/o Bemina Nallah at Laribal near Masjid Sharief.]2026_IFC_328708_3
10/29/2026 10:30:00 AM[Restoration of Kehwat Dara Minor of Kanir Canal by way of Construction of Cement Concrete Channel at Kanir.]2026_IFC_328708_2
10/29/2026 10:30:00 AM[Hiring of Consultancy Firm for Preparation of Detailed Project Report, Designs, Drawings, Estimates and Bid Documents for Construction of PickUp Weir Across Pohru Nallah at Buhamma Including Canal Section upto RD 2500 and Outlet Systems of Lalkhul]2026_IFC_328685_1
11/09/2026 08:30:00 AM[Construction of crate protection bund at Khandipora near RD 11000m on Sunaman Canal and Sais Khun B.o Sonman Canal at the upstream offtake point of Satwat Ladh]2026_IFC_328617_4
10/29/2026 08:30:00 AM[Gluthi Mung Khul Improvement and Strengthening of khul by construction of parapets and retaining walls in cement concrete 1 3 6 and laying of channel bed in cement concrete 1 2 4 from rd 0 to 660 m]2026_IFC_328509_8
11/04/2026 06:30:00 AM[Construction Of Boundary Wall Along Nallah Nand River From HO Manzoor Ahmad Parray S/O Late. Ab. Ahad Parray, Gull Mohd SO Late Habibullah Parray At Chawalgam Mohalla Darpora]2026_IFC_328617_3
10/29/2026 08:30:00 AM[Construction of Bund on river side at Aharbal Kulgam near Naid Mohallah for protection of Muqbara graveyard.]2026_IFC_328559_6
10/28/2026 08:30:00 AM[Restoration of cross bund of Noorabad canal.]2026_IFC_328559_8
10/28/2026 08:30:00 AM[Checking of leakage by way of Bed-treatment and Jacketing on Watoo canal RD 2000-3000 at spots.]2026_IFC_328559_4
10/28/2026 08:30:00 AM[Upgradation/ Improvements of Pattan Khul.]2026_IFC_328459_1
11/06/2026 09:30:00 AM[Pipe Syphon On Daderkote Minor At Chakdar Kutbrara Kader]2026_IFC_328617_2
10/29/2026 08:30:00 AM[Restoration of Breached spot on Parghan Ladi near RD 1100 mtrs.]2026_IFC_328559_5
10/28/2026 08:30:00 AM[Checking of leakage by way of jacketing on Yari canal near RD 3200 Mtrs.]2026_IFC_328559_7
10/28/2026 08:30:00 AM[Improvement/ Stg. Of Lift Irrigation scheme Balgarah]2026_IFC_328585_3
10/24/2026 10:30:00 AM[Protection work of Syphon Rd 28700M of NPC by way of Crates at spots.]2026_IFC_328585_2
10/24/2026 10:30:00 AM[Restoration of wall between RD 20-300M of Main NPC]2026_IFC_328585_1
10/24/2026 10:30:00 AM[Restoration and Improvement of Garh Khul from RD 340 to 750m, RD 835 to 1200m and RD 1300 to 1920m under UT Capex.]2026_IFC_328519_5
10/23/2026 10:30:00 AM[Strengthening/Improvement of Dadura Khul RD 0 to 450m, RD 450 to 650, RD 650 to 800m, RD 800 to 1350m at spots, including distributary of khul of length 700 m (RD 0 to 700m) under UT Capex]2026_IFC_328519_4
10/23/2026 10:30:00 AM[Improvement/Restoration of Such Sai Khul from RD 0 to 445m, RD 1025 to 1800m, RD 1900 to 2300m and RD 2600 to 3080m under UT Capex.]2026_IFC_328519_3
10/23/2026 10:30:00 AM[Construction of Crate Protection Work in flood-affected areas of Dharmari, Sounchal and Saral along the river and adjoining Nallah of Panchayat Thuroo-A2, Block Thuroo, District Reasi under UT Capex]2026_IFC_328519_2
10/23/2026 10:30:00 AM