ORGANISATION ANALYSIS
Department of Power
Department of Power
Tender activity
[FOR DESIGN, TESTING, SUPPLY OF STRCTR DRG, SHOP FLOOR DRG, BOM FOR 220 KV DOUBLE CKT AND MULTI CKT TOWERS AND MANUFACTURE, FABRICATION, GALVANISATION AND SUPPLY OF 3000 MT OF 220 KV DOUBLE CKT AND MULTI CKT TOWER MATERIAL (MS and HT) ]2026_POWER_179084_1
12/09/2026 05:30:00 AM[For Design, Manufacture, Testing, Supply and Delivery of Earthing Sticks Sets Complete with accessories suitable for use at 400 kV/220kV/132 kV Sub-Stations/Transmission Lines of PSTCL.]2026_POWER_179083_1
12/15/2026 05:30:00 AM[Hiring of Vehicle]2026_POWER_179104_1
11/25/2026 05:30:00 AM[Hiring 01 No mobile crane of 150MT capacity for loading, unloading and placement of power transformers upto 31.5MVA for carrying out various works under Grid Construction Circle, Ludhiana]2026_POWER_178945_1
12/09/2026 11:30:00 AM[Supplying and fixing of Ferro Trench Covers of various sizes on existing trenches under P and M Division Jagraon]2026_POWER_179025_1
12/10/2026 07:30:00 AM[Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works]2026_POWER_178957_1
12/21/2026 10:30:00 AM[Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works]2026_POWER_178933_1
12/17/2026 10:30:00 AM[763/P-3/EMP-13474 dt. 6.11.2026]2026_POWER_178952_1
11/27/2026 05:30:00 AM[764/P-1/EMP- 13476 dated 06-11-2026 Supply and fixing of 1 no. 20 HP Monoblock self-priming pump with starter complete set, 1 no. 12.5 HP Sewage Disposal Pumps along with starter, G.I pipes for sewerage treatment plants at Nuhon colony, Supply of 2 ]2026_POWER_178949_1
11/23/2026 04:30:00 AM[Procurement of Large Dia. Bearings for XRP-803 Coal Mills of stage-I units of GHTP, Lehra Mohabbat]2026_POWER_178948_1
12/10/2026 06:00:00 AM[Repair and renovation of roof of Shopping complex by tile terracing at GHTP Lehra Mohabat]2026_POWER_176126_2
11/25/2026 09:30:00 AM[Construction of 1 no. Solar bay for M/S Behari lal Engg. Ltd. and allied civil works at 66 KV S/S Phulewal (under Op. Circle, Sri Muktsar Sahib (Deposit work)]2026_POWER_178932_1
11/24/2026 09:30:00 AM[Construction of 1 no. Solar bay for M/S Arosol Renewable India Ltd. Patiala and allied civil works at 66 KV S/S Mukand Singh Wala. (under op. circle, Sri Muktsar sahib) (Deposit work)]2026_POWER_178930_1
11/24/2026 09:30:00 AM[09/SR.XEN/Civil/AHC/2026-27]2026_POWER_178803_1
12/05/2026 10:30:00 AM[MQP-277]2026_POWER_178872_1
11/23/2026 11:30:00 AM[Construction of 1 no. Addl T/F plinth and allied civil works at 66 KV S/S Bakshiwala]2026_POWER_178868_1
12/07/2026 10:00:00 AM[Construction of 1 no. Addl T/F T-2 (12.5MVA) plinth and allied civil works at 66 KV S/S Sehna ]2026_POWER_178875_1
12/07/2026 10:00:00 AM[Construction of 1 no. Addl T/F plinth and allied civil works at 66 KV S/S Loha Khera]2026_POWER_178864_1
12/07/2026 10:00:00 AM[MQP-271]2026_POWER_178857_1
11/23/2026 06:00:00 AM[Procurement of Spares of BAH CLINKER GRINDER.]2026_POWER_178854_1
11/23/2026 11:30:00 AM[Construction of all technical civil works at new 66KV Sub Station Teona (UNDER OPERATION CIRCLE Bathinda)]2026_POWER_178840_1
12/07/2026 10:00:00 AM[Procurement for Supply of Carbon Dioxide Gas Commercial Grade for Hydrogen gas purging from Generator]2026_POWER_178817_1
11/20/2026 11:30:00 AM[Procurement for Supply of Hydrogen gas Commercial Grade for Hydrogen gas cylinders for Generator cooling]2026_POWER_178807_1
11/20/2026 11:30:00 AM[Procurement of T and P items for maintenance of 220 kV ACFR (0.4 sq Inch) HTLS conductor ]2026_POWER_178853_1
12/07/2026 05:30:00 AM[Procurement of perforated screen plates for rotary breakers(crushers 1 A of stage-1) at GGSSTP Rupnagar]2026_POWER_178796_1
11/26/2026 05:30:00 AM[Modification of Pong-Talwara T-off for Amroh due to crossing in the Kartoli Punjab-Talwara new railway line section ]2026_POWER_178375_1
12/07/2026 09:30:00 AM[Augumentation of 20MVA 66/11 KV P/T/F-1 with 31.5 MVA 66/11 KV P/T/F at 66 KV S/S Dhaula and Katron (Under RDSS)]2026_POWER_178855_1
11/19/2026 09:30:00 AM[Augumentation of 20 MVA, 66/11 KV P/T/F-1 with 31.5 MVA, 66/11 KV at 66 KV S/S Ghamoorghat.(Under RDSS)]2026_POWER_178777_1
11/19/2026 09:30:00 AM[procurement of substation and line hardware fittings]2026_POWER_178819_1
12/07/2026 05:30:00 AM[Balance work of Construction of All Technical Civil Works for Upgradation from 66 KV to 220 KV Bhadson (as per revised scope)]2026_POWER_178798_1
11/19/2026 09:30:00 AM[Design Manufacture Assembly Testing and Inspection at firm s works packing dispatch, transportation safe delivery at site fabrication at site installation testing commissioning final painting at site of 4 Nos. EOT cranes hoists having 3 Ton capacity ]2026_POWER_178800_1
11/17/2026 05:30:00 AM[Laying of Premix Carpet over roads at Power Colony No.1, Sarabha Nagar, Ludhiana]2026_POWER_178847_1
11/19/2026 09:30:00 AM[QQ-278 Dead End Clamps]2026_POWER_178775_1
12/04/2026 10:30:00 AM[Saneta Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutor]2026_POWER_178732_1
11/30/2026 04:30:00 AM[IT City Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statuto]2026_POWER_178731_1
11/30/2026 04:30:00 AM[Assistance in taking over leftover manpower, T and P, consumable and transportation etc. for the work of routine, breakdown, preventive maintenance and overhauling jobs Mechanical works of Turbine, Generator and their auxiliaries]2026_POWER_178813_1
11/25/2026 06:00:00 AM[Annual Overhauling of Unit-1 and Unit-2 Boiler and its auxiliaries at 270 MW BHEL units at GVPGSL, Goindwal Sahib, Distt. Tarn Taran ,Punjab, as per detailed Scope of Work mentioned in Tender specifications.]2026_POWER_178758_1
11/18/2026 11:30:00 AM[Repair and Renewal of Ds city Sub Div. and Sub Urban Sub Div. Tanda ]2026_POWER_178802_1
11/18/2026 09:30:00 AM[Procurement of LED lights for RSD Power House and 220 kv RSD Switchyard.]2026_POWER_178752_1
12/02/2026 10:30:00 AM[Repair and Renewal of Ds Div.,Sub Div. Urban and Sub Div. Sub Urban Banga]2026_POWER_178791_1
11/18/2026 09:30:00 AM[Tender for hiring Consultancy for Maintenance of the existing Information Security Management System (ISMS) in accordance with ISO/IEC 27001 2022, Support for Surveillance Audits, Cyber Security Audit of IT OT Assets etc.]2026_POWER_178763_1
11/19/2026 06:00:00 AM[762/P-3/EMP-13482 dt. 5.11.26 for DEPLOYMENT OF MANPOWER TO ASSIST IN THE WORK OF BREAK DOWN/PREVENTIVE MTC. and OVERHAULING OF BFPS/CEPS/CWPS/ BCWS/MISC. PUMPS AND ALLIED AUXILIARIES OF 4X210 MW BHEL MAKE UNITS INCLUDING T and P and CONSUMABLES etc]2026_POWER_178764_1
11/11/2026 05:30:00 AM[DNIT forlaying of Tower Foundations,Erection of Towers,Stringing and Sagging of conductor for Part A Raising of 220 KV DC line from Pong to Dasuya Ckt-3 AND Ckt 4 BBMB from access 220 KV EHT Overhead Crossing in C/W work of electrification of New ]2026_POWER_178747_1
12/01/2026 05:30:00 AM[Enlistment and short listing of Architectural Consultants or firms for providing comprehensive Architectural and Allied Engineeing Drawings for New Modern Multistorey Office Building at Hall Gate Complex Amritsar]2026_POWER_178695_1
11/19/2026 07:30:00 AM[Repair of roof at 132kv ss Malout under PandM Division malout]2026_POWER_178635_1
12/07/2026 09:30:00 AM[Procurement of Spares for Boiler Feed Pumps, Booster Pumps, Condensate Extraction Pumps and CW Pumps of GHTP Stage-I andII Units. ]2026_POWER_178704_1
12/04/2026 06:00:00 AM[Procurement of RUBBER PADS FOR WAGON TIPPLERS STAGE-I and II]2026_POWER_178694_1
12/04/2026 06:00:00 AM[Repair, Maintenance and allied civil works at 220kv s/s Mahel Kalan under PandM Division Malerkotla]2026_POWER_178640_1
12/07/2026 09:30:00 AM[Various works such as de-loading of overloaded T/F releasing of AP/ISC/GSC connections work to be executed Under DS Division Dhuri (2027-28)]2026_POWER_178669_1
12/03/2026 10:30:00 AM[AMC CIVIL MAINTENANCE SERVICES]2026_POWER_178663_1
11/18/2026 11:30:00 AM[TE no. 366 dt. 4.11.26]2026_POWER_178700_1
11/19/2026 05:30:00 AM[OUTSOURCING OF ACTIVITY SERVICES FOR WATCH and WARD, CUTTING and CLEARANCE OF WILD GROWTH FROM THE JOINTS OF CEMENT CONCRETE LINING SLABS, INTERNAL SIDE SLOPES /EMBANKMENTS /DRAIN, STONE PITCHING ETC. OF MHC-I and II FOR THE PERIOD OF ONE YEAR.]2026_POWER_178622_1
11/30/2026 09:30:00 AM[ Development of infrastructure at 220kv s/s Rajpura]2026_POWER_178632_1
12/07/2026 09:30:00 AM[Development of infrastructure at 220kv s/s Patran]2026_POWER_178629_1
12/07/2026 09:30:00 AM[Strengthening of existing pile type foundation/ open pit foundation for 220 kv Lehra Barnala transmission line]2026_POWER_178626_1
12/07/2026 09:30:00 AM[Strengthening of existing pile type foundation/ open pit foundation for 220 kv Lehra Mansa(old) transmission line]2026_POWER_178623_1
12/07/2026 09:30:00 AM[Outsourcing of installation of new 66kV substation Focal Point bathinda wih 20MVA along with associated bay and 02 66kV line bays on partial turnkey mode under RDSS]2026_POWER_178602_1
12/02/2026 09:30:00 AM[Waterproofing of Roofs of 66 KV Sub Stations under O and M Division Khanna under P and M Circle Ludhiana under CE P and M Ludhiana]2026_POWER_178661_1
11/18/2026 09:30:00 AM[Waterproofing of Roofs of 66 KV Sub Stations under O and M Suburban Division under P and M Circle Ludhiana under CE P and M Ludhiana]2026_POWER_178660_1
11/18/2026 09:30:00 AM[specifications for design, manufacture, testing, supply and delivery of CPLRIs for 220kV transmission system.]2026_POWER_178598_1
11/17/2026 06:00:00 AM[Hiring consultant for Flexible operation implementation as per CEA guidelines on 4 x 210MW units of GGSSTP, Ropar.]2026_POWER_178658_1
11/23/2026 05:30:00 AM[Construction of 31.5 MVA Transformer Plinth and allied civil works at 220 kV S/S Jhoke Harihar.]2026_POWER_178647_1
11/18/2026 09:30:00 AM[Work of Construction of 3rd Addl. 20 MVA 66/11 KV TF plinth along with allied civil works at 220 KV S/S Himmatpura]2026_POWER_178621_1
11/17/2026 09:30:00 AM[Work of Aug.of 100 MVA TF to 160 MVA TF alongwith allied civil works at 220 KV S/S Handiaya (Barnala)]2026_POWER_178585_1
11/17/2026 09:30:00 AM[Development of infrastructure 220kv s/s Mandigobindgarh 1]2026_POWER_178618_1
11/30/2026 07:30:00 AM[Development of infrastructure at 400kv s/s Nakodar]2026_POWER_178612_1
11/30/2026 07:30:00 AM[Filling of cavities behind CC lining slabs by coarse sand grouting in between RD 31722 M to RD 35500 M on both sides of MHC-I during the year 2026-27]2026_POWER_178615_1
11/30/2026 09:30:00 AM[Repair of road at 132kv s/s Kathunangal]2026_POWER_178595_1
11/25/2026 07:30:00 AM[RESTORATION OF DAMAGED CC LINING SLABS IN BETWEEN RD 1846 M TO RD 2975 M ON BOTH SIDES OF MHC-II.]2026_POWER_178600_1
11/30/2026 09:30:00 AM[SUPPLY AND DELIVERY LINEMAN-ALM TOOL KITS (HAND TOOL and SAFETY TOOL KIT) AS PER APPLICABLE STANDARDS (WITH LATEST AMENDMENTS-REVISIONS IF ANY)]2026_POWER_178570_1
11/17/2026 11:30:00 AM[Construction of extension (Addition and renovation) of SHB at 66 kv S S Dyalpura Bhai ka O and M Division Bathinda]2026_POWER_178546_1
11/18/2026 11:30:00 AM[Const of Extension (Addition and renovation) of SHB at 66 kV S S Budhladha under O and M Division mansa ]2026_POWER_178543_1
11/18/2026 11:30:00 AM[Construction of Flood Protection Wall at 66 kv S S Budhladha under O and M Division Mansa ]2026_POWER_178539_1
11/18/2026 11:30:00 AM[Recasting of old unsafe roof slab and Extension of SHB at 66Kv S S Kattianwali O and M Division Fazilka ]2026_POWER_178530_1
11/18/2026 11:30:00 AM[Recasting of Unsafe Old Roof Slab, repair of boundary wall, UC fencing and Yard foundaion at 66Kv S S Ratta Tibba Under O and M Division Fazilka]2026_POWER_178525_1
11/18/2026 11:30:00 AM[Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works]2026_POWER_178519_1
12/08/2026 10:30:00 AM[Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works]2026_POWER_178502_1
12/07/2026 10:30:00 AM[Various works such as de-loading of overloaded T/F releasing of AP/ISC/GSC connections work to be executed Under DS Division Patran (2027-28)]2026_POWER_178562_1
12/01/2026 10:30:00 AM[Construction of all technical civil works at new 66KV Sub Station Fakarsar Theri (UNDER OPERATION CIRCLE Sri Muktsar Sahib)]2026_POWER_178544_1
11/17/2026 10:00:00 AM[Procurement of 140 MT of Sulphuric Acid for GHTP Lehra Mohabbat.]2026_POWER_178537_1
12/01/2026 06:00:00 AM[Construction of all technical civil works at new 66KV Sub Station Banawala (UNDER OPERATION CIRCLE Bathinda)]2026_POWER_178507_1
11/17/2026 10:00:00 AM[Procurement of Spares of Bottom Ash Hopper Feed Gate and Jet Pump]2026_POWER_178526_1
11/16/2026 11:30:00 AM[Procurement of REFRACTORY FOR BOTTOM ASH HOPPER.]2026_POWER_178518_1
11/16/2026 11:30:00 AM[Procurement of APH Seals and grating bar set.]2026_POWER_178511_1
11/16/2026 11:30:00 AM[Procurement of APH BASKETS for 270 MW Units.]2026_POWER_178509_1
11/16/2026 11:30:00 AM[Procurement of Modules for Max DNA DCS System]2026_POWER_178499_1
11/16/2026 11:30:00 AM[Procurement of Non-Ferric Alum]2026_POWER_178462_1
11/17/2026 11:30:00 AM[QQ-277 ACSR Weasel]2026_POWER_178447_1
11/30/2026 10:30:00 AM[EXTENSION OF SWITCH HOUSE BUILDING AT 66 KV SUB STATION FOCAL POINT BATALA GURDASPUR]2026_POWER_178517_1
11/17/2026 05:30:00 AM[7888 /P-3/EMP-13464 dated 30.10.2026 for Replacement of 2 Nos. Horizontal Fire water pumps of fire fighting System installed at stage-II fire pumps house GGSSTP Rupnagar.]2026_POWER_178505_1
11/25/2026 05:30:00 AM[7887/P-3/EMP-13465 dt. 30.10.2026 foProcurement of DM plant spares for DM Plants of Stage-II and III at GGSSTP, Rupnagar.]2026_POWER_178508_1
11/25/2026 05:30:00 AM[Various works such as de-loading of overloaded T/F releasing of AP/ISC/GSC connections work to be executed Under DS Division Dirba (2027-28)]2026_POWER_178506_1
12/01/2026 10:30:00 AM[Const. of Addl T/F Plinth, Bus bar and its allied civil works at 66 KV S/S Kot Bhai. (under op. circle, Sri Muktsar Sahib) (Non-RDSS)]2026_POWER_178409_1
11/28/2026 09:30:00 AM[Construction of Reinforced Cement Concrete Road at 220 kV Switching Station Bahawal Bassi.]2026_POWER_178433_1
12/01/2026 09:30:00 AM[Construction of Retaining wall/Boundary wall at 220 kV S/S Behak Khas (Fazilka).]2026_POWER_178419_1
11/17/2026 09:30:00 AM[Various works such as de-loading of overloaded T/F releasing of AP/ISC/GSC connections work to be executed Under DS Division Lehragaga (2027-28)]2026_POWER_178406_1
11/27/2026 10:30:00 AM[Various works such as de-loading of overloaded T/F releasing of AP/ISC/GSC connections work to be executed Under DS Division Sunam (2027-28)]2026_POWER_178380_1
11/27/2026 10:30:00 AM[DNIT for the work of Augmentation of 1 no. 100 MVA T/F with 1 no. 160 MVA T/F and allied civil works at 220 KV S/S Himmatpura]2026_POWER_178358_1
11/12/2026 09:30:00 AM[Tender Enquiry no 07 2026 27 for Hiring of 1 no LCV Canter Tata 407 2.5 Ton or its equivalent in price vehicle for the office of AEE TL Amritsar under SR XEN P and M Division PSTCL Amritsar for one year. Vehicle should not be more than 5 year old. ]2026_POWER_178233_1
11/16/2026 05:30:00 AM[Various works such as deloading of overloaded T/F releasing of AP/ISC/GSC connections work to be executed Under DS Division Sangrur (2027-28)]2026_POWER_178360_1
11/27/2026 10:30:00 AM[Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun]2026_POWER_178230_1
11/27/2026 04:30:00 AM[Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun]2026_POWER_178221_1
11/27/2026 04:30:00 AM[Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works ]2026_POWER_178299_1
12/02/2026 10:30:00 AM[For Supply and Delivery of 100no. 11kV Differential/ Metering CTs for various Substation of PSTCL.]2026_POWER_178318_1
11/13/2026 05:30:00 AM[Construction of All Technical civil works at new 66 KV Sub-Station Sotla (Under operation circle Hoshiarpur).]2026_POWER_178325_1
11/26/2026 10:00:00 AM[Construction of All Technical civil works at the 66 KV Sub-Station Mathi (Under op. Circle Khanna). Under RDSS]2026_POWER_178312_1
11/12/2026 10:00:00 AM[Executing work of 66 KV line for Shifting of 66 KV idle Ferozepur Road to Adda Dhakha line on Request of Madhuban Enclave Welfare Society]2026_POWER_178236_1
11/30/2026 04:30:00 AM[Repair and Repainting of steel railings of VR DR Bridges at RD 3509ft RD 5780ft RD 12128ft RD14975ft RD19410ft RD 25575ft RD 29683ft RD 41250ft RD 65640ft of UBDC hydel channel during 2026 27]2026_POWER_178331_1
11/26/2026 05:30:00 AM[Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works ]2026_POWER_178270_1
12/01/2026 10:30:00 AM[Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works]2026_POWER_178246_1
11/30/2026 10:30:00 AM[Procurement of BOILER HP VALVES and ITS SPARES which will be used in 2x270 MW BHEL ]2026_POWER_178189_1
11/11/2026 11:30:00 AM[Addition Alteration in SHB to accomodate extension in 11kv control room at 132 kv s/s Shamashpur]2026_POWER_177840_1
11/10/2026 06:30:00 AM[45/CCM/PTA/2026-27 dated 19.10.2026]2026_POWER_178264_1
11/25/2026 07:30:00 AM[Supply and Delivery of ISI marked 1.1 kV LT XLPE Insulated, PVC Sheathed, Aluminum Conductor unarmoured cable of size 4Cx50 sq. mm]2026_POWER_178185_1
11/27/2026 11:30:00 AM[ Works related to Outsourcing of Labour Part to rectify low-lying PVC cables at road/street crossing under City Banga]2026_POWER_178165_1
11/10/2026 10:30:00 AM[Construction of Allied Civil Works for Augmentation of 1 no. 100 to 160 MVA 220/66 kV T/F, 1 no. 12.5 MVA to 31.5 MVA 66/11 kV T/F and replacing of 1 no. 100 MVA to 100 MVA 220/66 kV T/F at 220 kV S/S Civil Line Amritsar. ]2026_POWER_178126_1
11/11/2026 09:30:00 AM[Procurement of ESP Spares for 270 MW BHEL Unit]2026_POWER_178125_1
11/10/2026 11:30:00 AM[Procurement of HOT AIR CONTROL DAMPERS]2026_POWER_178122_1
11/10/2026 11:30:00 AM[Procurement of GLAND PACKING SET OF BOILER HP VALVES]2026_POWER_178119_1
11/10/2026 11:30:00 AM[Procurement of Carbon Steel Plant 6 mm ]2026_POWER_178118_1
11/10/2026 11:30:00 AM[Procurement of BOILER TUBES PROTECTION SHIELDS]2026_POWER_178115_1
11/10/2026 11:30:00 AM[Procurement of Boiler Tubes used in 270 MW BHEL Units]2026_POWER_178111_1
11/10/2026 11:30:00 AM[7886/P-1/EMP- 13423 dated 23.10.2026 Procurement and replacement of various types of Fire extinguishers such as ABC type, CO2 type, and Mechanical form type for firefighting services at GGSSTP, Rupnagar.]2026_POWER_178109_1
11/23/2026 04:30:00 AM[Award of Service Contract for Checking, Servicing, Calibration and Other overhauling Jobs of Instruments]2026_POWER_178103_1
11/10/2026 11:30:00 AM[Award of Service Contract for Servicing and overhauling of motorized actuator at both the Units]2026_POWER_178102_1
11/10/2026 11:30:00 AM[Award of Service Contract for Servicing and overhauling of Pneumatically Operated Actuators and Cylinders]2026_POWER_178101_1
11/10/2026 11:30:00 AM[Labour Outsourcing for HT/LT Works]2026_POWER_178132_1
11/20/2026 07:30:00 AM[Outsourcing of Labour Part for works relating to 11KV HT/LT Lines]2026_POWER_178123_1
11/20/2026 07:30:00 AM[Construction of 1 No.66 KV Bay and allied civil works at 66 KV S/S Sekhupura (Under Operation Circle Mohali)]2026_POWER_178108_1
11/20/2026 05:30:00 AM[Outsourcing of Labour Part for works relating to 11KV HT/LT Lines]2026_POWER_178104_1
11/20/2026 07:30:00 AM[e-auction for sale of 383 nos. trees of different kinds standing in the yard area of 220 KV Substation Bhadson (Upgradation from 66 KV)]2026_POWER_178110_1
11/10/2026 09:30:00 AM[Addition alteration in SHB to accomodate extension in 11kv control room at 132 kv ss Seh]2026_POWER_177841_1
11/10/2026 06:30:00 AM[Extension of Switch House Building of 66 KV Sub-Station Baloki, PSPCL, Ludhiana]2026_POWER_178051_1
11/10/2026 09:30:00 AM[Extension of SHB at 66 KV S/S Badali Ala Singh, PSPCL, Ludhiana]2026_POWER_178049_1
11/10/2026 09:30:00 AM[Construction of 220kV Substation Toot(to be upgraded from 66kV)]2026_POWER_178047_1
11/25/2026 05:30:00 AM[Construction of 3rd Addl. 20 MVA 66/11 kv T/f plinth and allied civil works at 220 kv s/s Lalton Kalan]2026_POWER_178089_1
11/10/2026 06:30:00 AM[Construction of addl. Bay (From 220kv s/s Handiaya 2nd circuit) and allied civil works at 66 KV S/S Barnala( Under Op. circle Sangrur). (Under RDSS)]2026_POWER_178040_1
11/06/2026 11:30:00 AM[AMC Services for carrying out Environmental monitoring and testing in and around the plant.]2026_POWER_178010_1
11/19/2026 11:30:00 AM[Procurement Email and Office 365 Licenses]2026_POWER_178009_1
11/06/2026 11:30:00 AM[Procurement of Various Types of Tubes and Fittings.]2026_POWER_177991_1
11/06/2026 11:30:00 AM[Procurement of Spares for Boiler Ignition and Flame scanner System]2026_POWER_177986_1
11/06/2026 11:30:00 AM[390/SS(D)-II]2026_POWER_178011_1
11/23/2026 05:30:00 AM[7884/P-3/EMP-13460 dt. 22.10.2026 for Procurement of over-running clutch for MDU of air- preheaters of unit 3,4,5 and 6 at GGSSTP, Roopnagar .]2026_POWER_177988_1
11/18/2026 05:30:00 AM[Supply, Erection, Testing and Commissioning of CO Analysers for Unit 3 to 6 at GGSSTP, Ropar.]2026_POWER_178000_1
11/18/2026 05:30:00 AM[RENEWAL and REPLACEMENT OF DAMAGED PAINT, ELECTRICAL WIRING, JOINERY, WATER SUPPLY, SANITARY and OTHER ALLIED CIVIL WORKS AT BUILDING OF SUB URBAN SUB DIVISION FOCAL POINT, PSPCL, TARN TARAN.]2026_POWER_177951_1
11/04/2026 09:30:00 AM[Procurement of Temperature Pressure sensors installed in TG other BTG area]2026_POWER_177912_1
11/05/2026 11:30:00 AM[Procurement of Turbo Supervisory Instruments and Accessories]2026_POWER_177904_1
11/23/2026 11:30:00 AM[Unit-1VCB and VC Overhauling]2026_POWER_177888_1
11/05/2026 11:30:00 AM[HT Motors Overhauling]2026_POWER_177884_1
11/05/2026 11:30:00 AM[Maintenance of division office at 132kv s/s Kapurthala]2026_POWER_177928_1
11/19/2026 07:30:00 AM[Construction of boundary wall and UC Fencing at 220kv s/s Khasa.]2026_POWER_177921_1
11/19/2026 07:30:00 AM[Replacement of disc insulator strings along with single tension fittings of 132 kV lines emanating from 132 kV substation Swaddi Kalan under AEE TL Ludhiana Under P and M Division PSTCL Lalton Kalan]2026_POWER_177890_1
11/10/2026 05:30:00 AM[Construction of 3rd Additional 100 MVA 220/66 KVT/F plinth and allied civil works at 220 kv ss Gaunsgarh]2026_POWER_177900_1
11/04/2026 06:30:00 AM[Construction of DS Division and DS Sub urban Sub Division office Building Rampura at 66 KV Sub Station Complex Rampura]2026_POWER_177846_1
11/20/2026 11:30:00 AM[Construction of extension (Addition and renovation) of SHB at 66 kv S S Abohar O and M Division Fazilka ]2026_POWER_177838_1
11/06/2026 11:30:00 AM[Recasting of roof slab at 66Kv Sub Station Boha O and M Division Mansa ]2026_POWER_177837_1
11/06/2026 11:30:00 AM[Civil Works for Augmentation of 100 to 160 MVA 220/66 kV Transformer, Additional 20 MVA Transformer Plinth, Switch Gear Foundations and allied civil works at 220 kV S/S Patti. ]2026_POWER_177885_1
11/05/2026 09:30:00 AM[Liaison work of quantity materialization as per MSQ and transit loss minimization of ROM/washed coal and covering of Tarpaulin on coal rakes loaded from CIL sources for all the thermal power plants owned/to be owned by Punjab State Power Corporation ]2026_POWER_177876_1
11/19/2026 06:00:00 AM[7883/P-1/EMP- 13459 dated 19-10-2026 for Procurement of Heavy Chemicals.]2026_POWER_177879_1
11/04/2026 04:30:00 AM[Procurement of Pressure Transmitters]2026_POWER_177870_1
11/20/2026 11:30:00 AM[Service of condenser tube cleaning HP Jetting and bullet shooting in 270 MW BHEL Units during Annual overhauling for Both the Units of GVKPGSL Goindwal Sahib]2026_POWER_177869_1
11/04/2026 11:30:00 AM[Procurement of Turbine Speed Sensor]2026_POWER_177867_1
11/20/2026 11:30:00 AM[Construction of 4th Addl 20MVA 66/11kv T/f plinth and allied civil works at 220 kv ss Pakhowal]2026_POWER_177835_1
11/02/2026 06:30:00 AM[Work of replacement of t-clamps with c-wedge clamps (0.4-0.4 sq. inch, 0.2 sq. inch) alongwith change of jumpers (wherever required) on 220/132/66kV Busbars at various substations under P and M Circle jalandhar]2026_POWER_177808_1
11/17/2026 06:30:00 AM[ Works related to Outsourcing of Labour Part to rectify low-lying PVC cables at road/street crossing under City,S/U Division Garhshankar]2026_POWER_177805_1
11/05/2026 10:30:00 AM[Works related to Outsourcing of Labour Part to rectify low-lying PVC cables at road/street crossing under Phillaur- Goraya Division]2026_POWER_177762_1
11/04/2026 09:30:00 AM[Construction of Additional T/F Plinth and its Allied Civil Works at the 66KV Sub Station Korianwali (Ahlupur) (under op circle Bathinda)]2026_POWER_177759_1
11/02/2026 10:00:00 AM[Works related to Labour Outsourcing - City Sub division Hoshiarpur ]2026_POWER_172835_2
11/02/2026 09:30:00 AM[Representative agency for witnessing the third party sampling at loading end.]2026_POWER_177818_1
11/17/2026 11:30:00 AM[Strengthening of existing pile type foundation/ open pit foundation for various towers of 220kv Mohali-Ganguwal DC line under AOTL s/d Ropar]2026_POWER_177795_1
11/19/2026 09:30:00 AM[Strengthening of existing pile type foundation/ open pit foundation for various towers of 220kv Fagganmajra-rajpura(lilo to Bhateri) line under AOTL s/d 400 kv s/s Rajpura]2026_POWER_177792_1
11/19/2026 09:30:00 AM[Strengthening of existing pile type foundation/ open pit foundation for various towers of 220kv Bhalwan Dhuri DC line under AOTL s/d 400 kv s/s Bhalwan Dhuri]2026_POWER_177787_1
11/19/2026 09:30:00 AM[Strengthening of existing pile type foundation/ open pit foundation for various towers of 220kv malerkotla Dhuri DC line under AOTL s/d 400 kv s/s Bhalwan Dhuri]2026_POWER_177781_1
11/19/2026 09:30:00 AM[Strengthening of existing pile type foundation/ open pit foundation for various towers of 220kv Rajpura-railway line under AOTL s/d 400 kv s/s Rajpura]2026_POWER_177766_1
11/19/2026 09:30:00 AM[Strengthening of existing pile type foundation/ open pit foundation for various towers of 220kv Fagganmajra-Ablowal line under AOTL s/d 400 kv s/s Rajpura]2026_POWER_177760_1
11/19/2026 09:30:00 AM[Strengthening of existing pile type foundation/ open pit foundation for various towers of 220kv rtp- jadla DC line under AOTL s/d Ropar]2026_POWER_177804_1
11/19/2026 09:30:00 AM[Procurement of Napthenic based transformer Oil]2026_POWER_177706_1
11/17/2026 05:30:00 AM[Work related outsource LT/HT Network Safety Compliance etc under sub urban tanda s/d area Under Circle Hoshiarpur]2026_POWER_172852_2
11/02/2026 09:30:00 AM[Work related outsource LT/HT Network Safety Compliance etc under city tanda s/d area Under Circle Hoshiarpur]2026_POWER_172840_2
11/02/2026 09:30:00 AM[Outsourcing of Labour Part to rectify low-lying PVC cables under area of SUBURBAN sd under SUBURBAN div Hoshiarpur]2026_POWER_172873_2
11/02/2026 09:30:00 AM[Works related to Labour Outsourcing - City Dasuya s/d area Under Circle Hoshiarpur]2026_POWER_172864_2
11/02/2026 09:30:00 AM[Works related to Labour Outsourcing - Model Town Sub Division Hoshiarpur]2026_POWER_172827_2
11/02/2026 09:30:00 AM[Works related to Labour Outsourcing - Civil Line Sub Division Hoshiarpur ]2026_POWER_172844_2
11/02/2026 09:30:00 AM[Works related to Labour Outsourcing - Garhdiwala s/d area Under Circle Hoshiarpur]2026_POWER_172869_2
11/02/2026 09:30:00 AM[Manufacture, testing, supply and delivery of master trip and restricted earth fault relays for 11kv breakers and 66KV power transformers installed at various 66 KV substations]2026_POWER_177672_1
11/17/2026 09:30:00 AM[Manufacture, Testing, Supply and Delivery of SCADA compatible Numeric Differential Relays]2026_POWER_177635_1
11/17/2026 09:30:00 AM[Execution of work of Assembly, Testing and commissioning of Butterfly valve Door seal dia. 5000 mm and Trunnion seals of Butterfly valves of all the four units (4x150MW) at RSD, Shahpurkandi.]2026_POWER_177694_1
11/10/2026 09:30:00 AM[Supply of 2 No. High End Thermovision Cameras for thermal scanning during live line maintenance of 400/220/132 KV Transmission System of PSTCL]2026_POWER_177691_1
11/17/2026 05:30:00 AM[Repair Maintenance and allied civil works at 220kv ss Malerkotla]2026_POWER_177677_1
11/16/2026 09:30:00 AM[Repair Maintenance of roof and allied civil works at 220kv ss Dhuri]2026_POWER_177657_1
11/16/2026 09:30:00 AM[Maintenance of plants and grass at VIP Guest House]2026_POWER_176780_1
11/02/2026 06:30:00 AM[06/East/PTS/LDH/2026-27]2026_POWER_177524_1
10/29/2026 11:30:00 AM[Construction of 1 No. 3rd addl. 12.5 MVA 132/11 kV T/F Plinth and allied civil works at 132 kV S/S Khera Mandir. ]2026_POWER_177390_1
10/30/2026 09:30:00 AM[Work of reclamation of 2800 cubic meter spilled coal/biomass as per scope of work in Coal Handling Plant of GGSSTP, Roopnagar]2026_POWER_177377_1
10/27/2026 05:30:00 AM[Protection of Porcelain Insulators String of 400 KV Transmission Lines by offline washing Under P and M Organization of PSTCL]2026_POWER_177267_1
10/28/2026 05:30:00 AM[For Hiring of outsource vehicle 01 No. 8/9 MT or equivalent including loading and unloading by 4 NO unskilled workers for Grid const.Sub Division,PSTCL., Jalandhar.]2026_POWER_177239_1
11/10/2026 09:30:00 AM[Const. of all technical civil works for upgradation of 132 kV S/S Tanda to 220 kV.]2026_POWER_177181_1
10/27/2026 09:30:00 AM[66KV line for 66KV SStn Bazurg]2026_POWER_177116_1
11/10/2026 09:30:00 AM[Rate contract for a period of 1 year for Loading/Unloading of 10 MVA to 31.5 MVA capacity PTFs (main body excluding accessories) by Crane]2026_POWER_177147_1
11/09/2026 05:30:00 AM[Outsourcing of ETC of new 66 kv sub station Tarewala with 12 5 mva ptf work along with TF bay complete with all indoor and outdoor equipments on partial turnkey mode under grid construction division ludhiana]2026_POWER_177118_1
11/04/2026 06:00:00 AM