Tender activity
[INVITATION TO PRE-TENDER MEET AMBIENT AIR QUALITY MONITORING SYSTEMS FOR BPCL, BINA PETCHEM AND REFINERY EXPANSION PROJECTS (BPREP) AT BINA REFINERY, MADHYA PRADESH (INDIA)]2026_EIL_933946_1
11/16/2026 08:30:00 AM[PRE-TENDER MEETING FOR subscription of Microsoft 365 Business Standard with Copilot Software User Licenses]2026_EIL_933934_1
11/13/2026 05:30:00 AM[JP/B862-000-WB-MR-3337/143 - VALVES - DUAL PLATE, SWING CHECK AND PLUG FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_933917_1
12/02/2026 06:30:00 AM[SPN/B957-000-WG-MR-3285/253 STRAINER FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_933908_1
11/25/2026 06:30:00 AM[Civil, Structural and Piling Works for GPFM Plant of OIL]2026_EIL_933768_1
12/08/2026 06:30:00 AM[INVITATION TO PRE-TENDER MEETING FOR GREEN BELT TENDER FOR POLYPROPYLENE PROJECT FOR BPCL KOCHI]2026_EIL_933875_1
11/12/2026 11:30:00 AM[Invitation of offer to quote Rate of Interest for Term Deposit]2026_EIL_933756_1
11/11/2026 08:00:00 AM[VS/C310-000-SE-T-8702/1002 HYDROLOGICAL AND HYDROGEOLOGICAL STUDIES FOR NPCIL, NARORA]2026_EIL_933496_1
12/01/2026 06:30:00 AM[B348-000-PK-T-3010/1021 - MISCELLANEOUS COMPOSITE WORKS FOR BRAHMAPUTRA CRACKER AND POLYMER LIMITED (BCPL)]2026_EIL_933287_1
11/19/2026 06:30:00 AM[SPN/ B933-000-WB-MR-3319/237 - VALVE- GATE, GLOBE AND CHECK (CAST) FOR Bina Petchem and Refinery Expansion Project (BPREP)]2026_EIL_933240_1
11/19/2026 06:30:00 AM[Pre-Tender Meeting for APPOINTMENT OF ACCOUNTING CUM DIRECT and INDIRECT TAX CONSULTANT]2026_EIL_933289_1
11/12/2026 05:30:00 AM[GGC AND PISTON VALVES]2026_EIL_931869_1
11/25/2026 06:30:00 AM[COMPRESSOR-CENTRIFUGAL(SPP)]2026_EIL_933191_1
12/03/2026 06:30:00 AM[COMPRESSOR-CENTRIFUGAL(SPP)]2026_EIL_933009_1
12/03/2026 06:30:00 AM[SS/C050-1P39A-VV-MR-6014/74 - PRESSURE VESSEL -CS (UP TO 25MM), PRESSURE VESSEL -CS (26-50MM)) For Polypropylene Unit (PPU) Project at Numaligarh Refinery, Assam]2026_EIL_933029_1
11/25/2026 06:30:00 AM[LT/B440-003-WD-MR-3711/173 - FITTINGS- CS, AS and SS]2026_EIL_933067_1
11/16/2026 06:30:00 AM[SS/C050-1P39A-KA-MR-5200/61 - EXTRUDER VACUUM UNIT FOR POLYPROPYLENE PROJECT OF M/S NUMALIGARH REFINERY LIMITED ]2026_EIL_932891_1
12/01/2026 06:30:00 AM[SS/C050-1P39A-WP-MR-3050/68 - STATIC MIXER For Polypropylene Unit (PPU) Project at Numaligarh Refinery, Assam ]2026_EIL_932739_1
11/25/2026 06:30:00 AM[SS/C050-1P39A-WD-MR-3109/75 - FITTINGS-CS, AS AND SS for Polypropylene Unit (PPU) Project at Numaligarh Refinery, Assam ]2026_EIL_931868_1
11/25/2026 06:30:00 AM[SPN/B957-000-YI-MR-1301/244 FIELD INSTRUMENTS (Miscellaneous) FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_930408_1
11/17/2026 06:30:00 AM[INVITATION TO PRE TENDER MEETING FOR FABRICATED STRUCTURAL STEEL]2026_EIL_932949_1
11/06/2026 03:30:00 AM[NOTICE OF PRE-TENDER MEET FOR HOT TAPPING WORKS FOR REVAMPING OF SV STATIONS, GAS TERMINAL AND KRIBCHO TERMINAL (PART-B) AT ONGC HAZIRA PLANT]2026_EIL_932836_1
11/06/2026 04:30:00 AM[SS/C106-000-LA-T-8503/2 - SUPPLY OF LICENSE, BEDP FOR METHYL AMINE UNIT OF M/s NUMALIGARH REFINERY LIMITED AT NAMRUP]2026_EIL_932688_1
12/14/2026 06:30:00 AM[TN/B943-000-MR-T-3170/1014 - MISCELLANEOUS MECHANICAL WORKS FOR EXECUTION OF BIO-ATF PROJECT OF MRPL]2026_EIL_932702_1
11/12/2026 06:30:00 AM[SS/C050-000-EB-T-0020/1014 - 66kV GAS INSULATED SUBSTATION PACKAGE FOR POLYPROPYLENE PROJECT OF M/S NUMALIGARH REFINERY LIMITED]2026_EIL_932460_1
12/28/2026 06:30:00 AM[EIL/Accts/RoI/FY26-27]2026_EIL_932487_1
11/03/2026 06:45:00 AM[INVITATION TO PRE-TENDER MEET FOR COKE DRUMS (SITE FABRICATED) OF COKE DRUM REPLACEMENT, ALLIED MODERNIZATION AND PIPING WORKS IN DELAYED COKER UNIT OF PANIPAT REFINERY]2026_EIL_932489_1
11/03/2026 03:30:00 AM[AKD/C274-100-MC-T-7401/1]2026_EIL_932400_1
11/13/2026 06:30:00 AM[INVITATION TO PRE-TENDER MEET FOR SUPPLY OF ETHYL MERCAPTAN FOR PANIPAT REFINERY EXPANSION (P-25) PROJECT OF M/S INDIAN OIL CORPORATION LIMITED (IOCL), INDIA]2026_EIL_932328_1
11/02/2026 04:30:00 AM[INVITATION TO PRE-TENDER MEET FIRE PROTECTION ENCLOSURE SYSTEM (VALVES AND ACCESS.) FOR BPCL, BINA PETCHEM AND REFINERY EXPANSION PROJECTS (BPREP) AT BINA REFINERY, MADHYA PRADESH (INDIA) MR NO. B957-000-YC-MR-1495]2026_EIL_932292_1
11/02/2026 05:30:00 AM[Pre-Tender Meeting for Sports Items Rate Contract]2026_EIL_932033_1
11/04/2026 08:30:00 AM[SPN/ B957-000-WK-MR-3279/ 249 HOSE AND HOSE COUPLINGS(UTILITY) FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_931877_1
11/10/2026 06:30:00 AM[JP/B862-000-WA-MR-3307/125 - PIPES - 3LP COATED FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_927744_1
11/17/2026 06:30:00 AM[COMPRESSOR-SCREWOIL FLOODED]2026_EIL_931874_1
11/10/2026 06:30:00 AM[SPN/ B957-000-WB-MR-3222/ 245 Y-TYPE GLOBE VALVES FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_930439_1
11/06/2026 06:30:00 AM[ Appointment of Banker-26-27]2026_EIL_931501_1
10/27/2026 07:30:00 AM[ SS/C050-1P39A-YA-MR-1660/70 - ANALYSER SYSTEMS for Polypropylene Unit (PPU) Project at Numaligarh Refinery, Assam ]2026_EIL_931241_1
11/19/2026 06:30:00 AM[SPN/B957-000-YS-MR-1750/246 SIGNAL CABLES WITH T/C EXTENSION CABLES FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_930549_1
11/05/2026 06:30:00 AM[SPN/ B933-000-WA-MR-3301/232 - Pipes- CS-Seamless and Welded For Bina Petchem and Refinery Expansion Project (BPREP)]2026_EIL_928962_2
10/30/2026 06:30:00 AM[INVITATION TO PRE-TENDER MEETING FOR PROCUREMENT OF TANK LEVEL INSTRUMENTS (SERVO TYPE) FOR POLYPROPYLENE UNIT (PPU) AT NUMALIGARH REFINERY LIMITED OF M/S NRL]2026_EIL_931210_1
10/26/2026 05:30:00 AM[INVITATION FOR PRE-TENDER MEET OF HEAT EXCH - HIGH PR (SCREW PLUG / BREECH LOCK) FOR CPCL.]2026_EIL_931204_1
10/26/2026 06:30:00 AM[JP/B862-000-XT-MR-0217/141 - CABLES - HIGH VOLTAGE - XLPE FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_931191_1
11/11/2026 06:30:00 AM[SPN/ B933-000-WA-MR-3304/236 - PIPE FOR Bina Petchem and Refinery Expansion Project (BPREP)]2026_EIL_931117_1
11/04/2026 06:30:00 AM[JP/B862-000-WF-MR-3340/140 - GASKETS FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_931046_1
11/09/2026 06:30:00 AM[SPN/B933-000-WD-MR-3314/234 - FITTINGS (AS AND SS) FOR Bina Petchem and Refinery Expansion Project (BPREP)]2026_EIL_929506_1
11/02/2026 06:30:00 AM[INVITATION PRE-TENDER MEET]2026_EIL_930934_1
10/21/2026 08:30:00 AM[PRE-TENDER MEETING FOR Secure Internet IPVPN connectivity at EIL]2026_EIL_930710_1
10/21/2026 05:30:00 AM[PRE-TENDER MEETING FOR subscription of Microsoft 365 Business Standard with Copilot Software User Licenses]2026_EIL_930772_1
10/19/2026 08:30:00 AM[JP/B933-999-EE-T-3002/1015 FOR ELECTRICAL TRACING WORK OF BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]2026_EIL_930753_1
11/09/2026 06:30:00 AM[JP/B862-000-YS-MR-1751/139 - SIGNAL CABLES - FIRE RESISTANT FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_930771_1
11/06/2026 06:30:00 AM[SPN/ B957-000-WB-MR-3215/ 243 PLUG VALVES FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_930438_1
10/30/2026 06:30:00 AM[JP/B862-000-WD-MR-3320/137 - FITTINGS - CS AND LTCS FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_930594_1
11/05/2026 06:30:00 AM[SPN/B933-000-WB-MR-3123/225 - MISCELLANEOUS VALVES FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]2026_EIL_930515_1
11/05/2026 06:30:00 AM[JP/B862-000-WD-MR-3321/138 - FITTINGS - SS FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_930647_1
11/05/2026 06:30:00 AM[VS/C316-000-PN-T-8716/1001 BASELINE DATA COLLECTION FOR REACTORS (IPR AND HTGCR), BARC]2026_EIL_929638_1
10/26/2026 06:30:00 AM[JP/B862-000-WC-MR-3311/136 - FLANGES - SS FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_930339_1
11/04/2026 06:30:00 AM[SPN/ B933-000-WC-MR-3308/235 - FLANGES- (AS AND SS) FOR Bina Petchem and Refinery Expansion Project (BPREP)]2026_EIL_930356_1
10/28/2026 06:30:00 AM[SUPPLY OF 44 nos. SAFETY BOILER SUITS ]2026_EIL_930351_1
10/21/2026 01:15:00 PM[SPN/ B957-300-LZ-MR-5190/237 PUMP-RECIPRO(API 675,PLUNGER/DIAPHRAGM), DOSING PACKAGE (SKID MOUNTED) FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_929598_1
11/11/2026 06:30:00 AM[JP/B862-000-WB-MR-3336/135 - VALVES - BALL FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_929942_1
11/10/2026 06:30:00 AM[SS/C050-1P39A-YF-MR-1020/66 - VARIABLE AREA FLOWMETERS (INDICATORS,TRANSMITTERS) for Polypropylene Unit (PPU) Project at Numaligarh Refinery, Assam ]2026_EIL_929406_1
11/06/2026 06:30:00 AM[JP/B862-000-WC-MR-3310/133 - FLANGES - CS FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_929665_1
10/30/2026 06:30:00 AM[JP/B862-000-WA-MR-3301/132 - PIPES - SEAMLESS (CS/LTCS) FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_929567_1
10/30/2026 06:30:00 AM[JP/B862-000-WB-MR-3330/131 - VALVES - GATE, GLOBE, CHECK, PISTON AND NEEDLE (FORGED) FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_929581_1
10/29/2026 06:30:00 AM[JP/B862-000-WB-MR-3332/134 -VALVES-GATE, GLOBE AND CHECK (LT AND CRYO) FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_929593_1
10/28/2026 06:30:00 AM[SPN/B957-000-WA-MR-3208/238 PIPES-WELDED (3L PE COATED) FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_929452_1
10/23/2026 06:30:00 AM[SPN/ B933-000-WA-MR-3302/229 - Pipes-AS SEAMLESS AND WELDED FOR Bina Petchem and Refinery Expansion Project (BPREP)]2026_EIL_929607_1
10/23/2026 06:30:00 AM[Annual Support of Korf Hydraulics Software ]2026_EIL_929449_1
10/22/2026 06:30:00 AM[JP/B862-000-WB-MR-3333/127 - VALVES - GATE, GLOBE AND CHECK (CAST) FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_929338_1
10/29/2026 06:30:00 AM[JP/B862-000-WA-MR-3302/128 - PIPES -SEAMLESS (SS) FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_929368_1
10/27/2026 06:30:00 AM[JP/B862-000-WE-MR-3251/129 - FASTENERS FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_929482_1
10/26/2026 06:30:00 AM[JP/B862-000-WA-MR-3303/130 - PIPES- WELDED (CS/LTCS) FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_929504_1
10/28/2026 06:30:00 AM[SPN/B957-000-WD-MR-3247/230 FITTINGS - WELDED FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP)]2026_EIL_928959_1
10/28/2026 06:30:00 AM[SPN/B933-000-WC-MR-3311/230 - FLANGES- CS FOR Bina Petchem and Refinery Expansion Project (BPREP)]2026_EIL_929233_1
10/21/2026 06:30:00 AM[SPN/B933-000-WA-MR-3303/228 - PIPE - SS SEAMLESS AND WELDED FOR Bina Petchem and Refinery Expansion Project (BPREP)]2026_EIL_929180_1
10/21/2026 06:30:00 AM[SPN/B933-000-WD-MR-3313/233 - FITTINGS- (CS, LTCS AND CS- EPOXY COATED) FOR Bina Petchem and Refinery Expansion Project (BPREP)]2026_EIL_929041_1
10/21/2026 06:30:00 AM[Renovation of Flats (Garden Apartment) at EIL-Kolkata-DC/ 8590-000-PK-T-8207/361 ]2026_EIL_929220_1
10/27/2026 06:30:00 AM[JP/ B862-000-MF-MR-8002/109 - WATER CUM FOAM MONITOR, REMOTE CONTROLLED FIRE WATER CUM FOAM MONITOR, DELUGE VALVE (Diaphragm Type) FOR PLL.]2026_EIL_912228_2
10/21/2026 06:30:00 AM[SPN/ B933-000-WA-MR-3301/232 - Pipes- CS-Seamless and Welded For Bina Petchem and Refinery Expansion Project (BPREP)]2026_EIL_928962_1
10/21/2026 06:30:00 AM[JP/ B862-000-YC-MR-1331/560 - CONTROL VALVES FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_928378_1
10/29/2026 06:30:00 AM[LT/C050-000-CF-T-8201/1011 FOR BUILDING WORKS-1 FOR UNIT AND OFFSITE FOR POLYPROPYLENE PROJECT OF M/S NUMALIGARH REFINERY LIMITED]2026_EIL_928570_1
10/29/2026 06:30:00 AM[SS/C050-1P39A-PA-MR-5190/63 - PUMP-ROTARY SCREW (Catalyst Suspension Metering Pump) for Polypropylene Unit (PPU) Project at Numaligarh Refinery, Assam - NRL ]2026_EIL_926082_1
10/22/2026 06:30:00 AM[JP/B862-000-WA-MR-3304/126 - PIPES-WELDED (SS)]2026_EIL_928580_1
10/22/2026 06:30:00 AM[SPN/B957-000-WB-MR-3219/236 CRYO/LT- BALL VALVES FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_928275_1
10/22/2026 06:30:00 AM[CATHODIC PROTECTION SYSTEM ]2026_EIL_927914_1
10/21/2026 06:30:00 AM[RCM/B957-300-CG-T-8006/1034 - UG PIPING AND MISCELLANEOUS WORKS FOR ECU FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP), BINA REFINERY OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]2026_EIL_927876_1
10/19/2026 06:30:00 AM[JP/B862-000-WJ-MR-3384/124 - EXPANSION JOINT FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]2026_EIL_927731_1
10/22/2026 06:30:00 AM[SPN/B957-300-VV-MR-6123/223 PRESSURE VESSEL -CS (UP TO 25MM) FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_927153_1
10/19/2026 06:30:00 AM[SPN/ B957-000-YC-MR-1330/219 CONTROL VALVES FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_926621_1
10/21/2026 06:30:00 AM[SPN/B957-000-YC-MR-1351/222 SPECIAL CONTROL VALVES (BUTTERFLY) FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_925865_1
10/26/2026 06:30:00 AM[LT/C050-000-CF-T-8202/1010 - BUILDING WORKS-II FOR UNIT AND OFFSITE POLYPROPYLENE PROJECT OF M/S NUMALIGARH REFINERY LIMITED ]2026_EIL_925859_1
10/21/2026 06:30:00 AM[SPN/B957-000-YC-MR-1350/221 SPECIAL CONTROL VALVES-MIXED FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_925721_1
10/19/2026 06:30:00 AM[SPN/B957-000-YI-MR-1300/220 FIELD INSTRUMENTS (P,DP,F,L) FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_925103_1
10/21/2026 06:30:00 AM[SPN/ B957-000-YI-MR-1100/ 208 PRESSURE AND TEMPERATURE GAUGES FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP)]2026_EIL_921759_1
10/28/2026 06:30:00 AM[SPN/ B957-000-YT-MR-1410/213 TEMPERATURE ELEMENTS, THERMOWELLS FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]2026_EIL_922829_1
10/23/2026 06:30:00 AM[EXPRESSION OF INTEREST-EOI (TECHNICAL) FOR ENLISTMENT OF WATER BATH HEATER (EIL-ENGINEERED) (ITEM CATEGORY-12LT) PACKAGE VENDOR]2026_EIL_921316_1
11/05/2026 06:30:00 AM[EXPRESSION OF INTEREST FOR ENLISTMENT OF HEATER TREATER (EIL-ENGINEERED) (ITEM CATEGORY-12LS) PACKAGE VENDOR]2026_EIL_921167_1
11/05/2026 06:30:00 AM[JP/B862-000-XC-MR-0040/108 - SWITCHBOARD-LV-DRAWOUT WITH ACB FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT OF PETRONET LNG LIMITED, DAHEJ (GUJARAT)]2026_EIL_919928_1
10/19/2026 06:30:00 AM[SPN/ B957-000-YF-MR-1020/ 172 VARIABLE AREA FLOWMETERS (INDICATORS) FOR Bina Petchem and Refinery Expansion Project (BPREP)-BPCL]2026_EIL_910711_1
10/23/2026 06:30:00 AM[EXPRESSION OF INTEREST FOR ENLISTMENT OF CONTRACTORS FOR LGSF TYPE BUILDINGS]2026_EIL_908518_1
11/11/2026 06:30:00 AM