Skip to Content
ORGANISATION ANALYSIS

IPGCL-PPCL

IPGCL-PPCL

Tenders45
Active45
Results0
Companies0

Tender activity

[Providing and fixing a fiber sheet shed over STG 3 and water proofing of roof of Mod 1,2 and 3 at GTPS.]2026_IPGCL_301278_1
11/19/2026 05:30:00 AM
[Repair and Maintenance of BHEL store Building at DM tank area GTPS.]2026_IPGCL_301274_1
11/18/2026 05:30:00 AM
[Biennial Contract for High Pressure Jet Cleaning of Condenser Tubes of 250 MW Steam Turbine at PPS III Bawana]2026_IPGCL_301168_1
11/25/2026 05:30:00 AM
[Repairing / Fabrication of CT Sludge and CT Blow down Pump at PPS-I]2026_IPGCL_301036_1
12/01/2026 05:30:00 AM
[Repair/ Fabrication of Cooling Tower Screen]2026_IPGCL_301010_1
11/30/2026 05:30:00 AM
[Supply of Spot RLNG on delivered basis at PPS I and PPS III Bawana Plants for the month of December 2026]2026_IPGCL_300992_1
11/17/2026 06:30:00 AM
[Repair of off base fan cooling coils of gas turbine at GTPS]2026_IPGCL_300919_1
11/26/2026 05:30:00 AM
[Rate contract (biennial) for fighting system in gas turbine power station IPGCL New Delhi.]2026_IPGCL_300931_1
11/27/2026 05:30:00 AM
[Cleaning of condenser of 122MW steam turbine at Pragati Power Station-I by High-Pressure water-jet]2026_IPGCL_300841_1
11/25/2026 05:30:00 AM
[Replacement of HRSG tubes in Super Heater Zone-1 at GTPS]2026_IPGCL_296149_1
11/30/2026 01:15:00 PM
[Hiring of hydraulic Crane (telescopic) for overhauling of GT#1 generator]2026_IPGCL_300724_1
11/11/2026 05:30:00 AM
[Development of the new scrap yard near ESP#2 and Railway Line and shifting of the iron scrap, and misc. scrap from different location of Rajghat Power House to New Developed scrap yard near # 2 and Railway Line.]2026_IPGCL_300658_1
11/13/2026 05:30:00 AM
[Renovation of Guest House and main sliding gate of Himadri Building at RPH office complex area.]2026_IPGCL_300616_1
11/12/2026 05:30:00 AM
[ARC for servicing and troubleshooting cranes hoists installed at PPS-1]2026_IPGCL_300319_1
11/12/2026 05:30:00 AM
[Repair to weldmesh fencing and Arresting sepage in blower building at sen nursing home STP PPS1.]2026_IPGCL_300238_1
11/04/2026 05:30:00 AM
[De-scaling of Condenser tubes by Hydro jet cleaning of Steam Turbine condenser, WHRU at Gas Turbine Power Station]2026_IPGCL_299969_1
11/05/2026 05:30:00 AM
[RENEWAL OF INSURANCE OF SNH and DGN SEWAGE TREATMENT PLANTS FOR THE PERIOD OF 01 YEAR FROM 24.11.2026 TO 23.11.2027.]2026_IPGCL_300085_1
10/23/2026 08:30:00 AM
[Major Repair, Rehabilitation and Strengthening of Aerator Structure at PPS3, Bawana.]2026_IPGCL_299954_1
10/28/2026 05:30:00 AM
[High Depth Desedimentation of Confined Process Tanks, Sumps and Sludge Pits at PPS3 Bawana.]2026_IPGCL_299760_1
10/30/2026 05:30:00 AM
[Revival of High Speed Water Spray System for COT/DOT Tank Area at GTPS]2026_IPGCL_299697_1
11/03/2026 05:30:00 AM
[Evocuation of waste sludge silt from water retaining sumps at Pragati Power Station1.]2026_IPGCL_299757_1
10/28/2026 05:30:00 AM
[Construction of Culverts, Safety Toe wall and Clearance of Big Drain in Switchyard PPS3, Bawana.]2026_IPGCL_299695_1
10/23/2026 05:30:00 AM
[ Supply of Spot RLNG on delivered basis at PPS-I and PPS-III Bawana Plants for the month of November-2026]2026_IPGCL_299634_1
10/19/2026 06:30:00 AM
[Beautification of facade of building at Delhi G Nursing Home STP at PPS1.]2026_IPGCL_299554_1
11/03/2026 05:30:00 AM
[Strenthening of structural steel work at sen nursing Home and delhi Gate Nursing Home staircase at PPS1.]2026_IPGCL_299553_1
11/02/2026 05:30:00 AM
[MISC civil works at IPGCL residential colony SKK.]2026_IPGCL_299545_1
10/22/2026 05:30:00 AM
[Repair replacement of existing wooden cabin by aluminium work at CandM building PPS 1.]2026_IPGCL_299504_1
10/21/2026 05:30:00 AM
[Online testing/calibration of safety valves at PPS-I]2026_IPGCL_299474_1
10/28/2026 05:30:00 AM
[Biennial Rate Contract for Mechanical Maintenance Works including supply Fabrication and Erection of Equipment supporting structures Winch Machine Installation and Maintenance Platforms for HRSG and Main Plant Equipment at PPSIII Bawana]2026_IPGCL_299424_1
10/28/2026 05:30:00 AM
[SITC of Passenger Elevator 8 person 544K AT PPSI]2026_IPGCL_299231_1
11/18/2026 05:30:00 AM
[PROCUREMENT OF SS PIPES AND FLANGES FOR PTP PLANT OF PPS-III, BAWANA.]2026_IPGCL_298481_1
10/22/2026 05:30:00 AM
[Biannual ARC for deputation of service engineer for 400KV BHEL make 3AT2 3AT3 hydraulic operated Circuit Breakers at PPS III on open tender basis]2026_IPGCL_299100_1
10/19/2026 05:30:00 AM
[Biennial rate contract for Repairing and Rewinding of different Critical motors installed at PPS III Bawana]2026_IPGCL_298882_1
11/03/2026 05:30:00 AM
[PROCUREMENT, DISMANTLING AND INSTALLATION OF BULK ACID TANKS AT RODM PLANT OF PPSIII BAWANA]2026_IPGCL_298604_1
10/21/2026 05:30:00 AM
[REPAIR OF NRV 1000 MM OF CW PUMP]2026_IPGCL_297214_2
10/27/2026 05:30:00 AM
[ARC FOR REPAIR OF DIFFRENT PUMPS INSTALLED IN GTPS]2026_IPGCL_298048_1
10/22/2026 05:30:00 AM
[Procurement of Inlet Air Filter 736 Nos (02sets)of Inlet air filter for Gas turbines at GTPS]2026_IPGCL_297498_1
10/21/2026 05:30:00 AM
[Upgradation of existing Pro-Control P13 DDC/DCS system at GTPS]2026_IPGCL_296353_1
11/02/2026 05:30:00 AM
[Procurement of Four sets of Blended Media Inlet Air Filters F9 AS PER EN 779 2012 OR MERV 15 AS PER ASHRAE 52.2 2012 STANDARD for 9 FA Gas Turbines installed at PPS III Bawana]2026_IPGCL_293250_1
10/21/2026 05:30:00 AM
[Biennial rate contract for repair and rewinding of LT Motors for GTPS For two years]2026_IPGCL_296694_1
10/28/2026 05:30:00 AM
[Design Supply Installation Testing Commissioning of 7 Nos LT 415V panels to replace the existing outdate switching device installed at SNH STP plant on open Tender Basis]2026_IPGCL_295175_1
11/16/2026 05:30:00 AM
[Procurement, installation and commissioning of two nos. Vacuum Pump with replacement of Existing Steam Jet Ejectors at GTPS]2026_IPGCL_289277_1
11/10/2026 05:30:00 AM
[Procurement of 02 Nos Open Channel Inlet Flowmeter with Totalizer 01 each for SNH AND DGN Sewage Treatment Plant of PPS 1]2026_IPGCL_292400_1
11/03/2026 05:30:00 AM
[Implementation Automatic Generation Control on 4 Gas Turbine Generators of 1500 MW PPS III Bawana]2025_IPGCL_281659_1
11/02/2026 05:30:00 AM
[Supply and Application of Energy Efficient Coating on Parts of CW pump of PPS 3 Bawana]2025_IPGCL_278083_1
10/27/2026 05:30:00 AM