ORGANISATION ANALYSIS
Irrigation Department
Irrigation Department
Tender activity
[GENERAL Action Plan 2026 2027 MVIP LBMC Annual Maintenance from ch 8000m to 16000m for the year 2026 2027 General Civil Work]2026_Irrig_885448_2
11/20/2026 08:30:00 AM[GENERAL MVIP LBMC Annual Maintenance from CH 16000m to 25624m of LBM General Civil Work]2026_Irrig_885649_2
11/20/2026 08:30:00 AM[GENERAL-ANNUAL BUND 2026-27-Putting up tidal bund across Various thodu in Tripunithura Municipality for the year 2026-27-General Civil Work]2026_Irrig_888038_1
11/16/2026 08:30:00 AM[GENERAL-ANNUAL BUND 2026-27-Putting up tidal bund across Athikai thodu in Trikkakkara Municipality for the year 2026-27-General Civil Work]2026_Irrig_887952_1
11/16/2026 08:30:00 AM[GENERAL-Pottanchira -Investigation for the reconstruction of Pottanchira regulator cum bridge in Chelakkara GramapanchayathInvestigation Work]2026_Irrig_887574_1
11/17/2026 12:30:00 PM[Reconstruction of Viruthi branch canal at Madathimoola of Avanamcode No.1(A) LIS]2026_Irrig_887617_1
11/17/2026 08:30:00 AM[ GENERAL-Natural Calamity-Monsoon Preparedness 2026-27 -Urgent Earth filling work at Punnok on the eastern side of tanur kootayi canal and removal of dangerous trees along the canal in Tanur Municipality ,Malappuram District-General Civil Work]2023_5_6_5
11/17/2026 11:30:00 AM[MVIP Fabrication erection and painting of new steel regulator shutter at Ch.8795 m of Kuravilangad distributory - General Mechanical Work]2026_16_3_1
11/17/2026 10:30:00 AM[GENERAL-PVIP-Action Plan 2026-27-Annual maintenance of Kodanad East branch canal from Ch1.500km to Ch5.000km-General Civil Work]2026_5_25_24
11/12/2026 10:30:00 AM[GENERAL-PVIP-ACTION PLAN 2026-27 Annual maintenance of Low Level Canal From ch 21/200 km to 28/800 km and Madathippadi MD Canal from ch 400m to ch 1280m and Thuruthippilly FC from ch 500m to ch 1750m General Civil Work]2026_5_24_23
11/12/2026 09:30:00 AM[DEPOSIT-Rectification of Thazhoor kadavu-Vallikkode Grama Panchayath Deposit-Rectification of Thazhoor kadavu at left bank of Achenkovil river in ward no 6 of Vallikode Panchayath in Konni Constituency-General Civil Work]2026_Irrig_887164_1
11/17/2026 10:30:00 AM[GENERAGENERAL-PVIP- ACTION PLAN 2026-27 Annual Maintenance of Low Level Canal from Ch 15/300km to 21/200km -General Civil WorkL-PVIP- ACTION PLAN 2026-27 Annual Maintenance of Low Level Canal from Ch 15/300km to 21/200km -General Civil Work]2026_5_13_12
11/12/2026 09:30:00 AM[PVIP-Annual maintanance of steel or concrete aqueduct at 9.300km of Kothamangalam Branch canal]2026_Irrig_887120_1
11/13/2026 12:30:00 PM[Modernization of Quality Control Wing-purchase of Digital weighing machine for the proposed QC lab at Kalpetta for the year 2026-27]2026_Irrig_886771_1
11/18/2026 05:30:00 AM[Procurement of Soil Sample Extractor]2026_Irrig_882796_2
11/16/2026 12:30:00 PM[KDLR-AM Painoor Kayal LIS 2026-27-Annual maintanence of Painoor Kayal LI schemes in Edathiruthy Panchayath. -General Civil Work]2026_Irrig_876368_2
11/12/2026 05:30:00 AM[Procurement of Digital Consolidation Test Apparatus]2026_Irrig_882788_2
11/16/2026 12:30:00 PM[Providing side protection wall for transition zone of well syphon between Ch. 13818.50 m and Ch.13850 m and establishing inlet pipe connection to existing chamber at Ch.13876 m]2026_Irrig_886736_1
11/17/2026 09:30:00 AM[GENERAL MVIP LBMC Engaging labour shutter operation and other connected works for water distribution from Ch 16000m to 25624m of LBMC and Marika distributory for the year 2026-2027General Civil Work]2026_Irrig_886706_1
11/16/2026 08:30:00 AM[Irrigation Quality Control Section, Kozhikode- Procurement of Ultrasonic Pulse Velocity Equipment for Quality control Lab at Kozhikode for the year 2026-27]2026_Irrig_885865_4
11/17/2026 10:30:00 AM[GENERAL-Annual Maintenance 2026-2027- Annual maintenance of pump and motor of LI station No.4 in Sooranadu North Panchayath for the year 2026-27-General Civil Work]2026_Irrig_886498_1
11/19/2026 11:30:00 AM[Tender for GENERAL-TIDAL BUND-PATTANAKKAD PANCHAYATH-Putting up Tidal bunds at various places in Pattanakkad Panchayath for the year 2026-2027-General Civil Work]2023_5_4_4
11/13/2026 11:30:00 AM[GENERAL-MIT/AM/2026-27-Annual maintenance of Edakkalathur LIS for the year 2026-27-General Civil Work]2026_5_6_4
11/13/2026 11:30:00 AM[Putting up tidal bund across Kadambrayar at Kozhithumbu for the year 2026-27]2026_Irrig_886622_1
11/13/2026 10:30:00 AM[GENERAL Annual Maintenance 2026 27 Ooranattuchira Annual Maintenance for the Year 2026 27 Ooranattuchira RCB in Pampakuda GP General Civil Work]2026_Irrig_880154_3
11/16/2026 05:30:00 AM[GENERAL 2026 27 Annual Maintenance of Amballoor Keecheri bund Amballoor Panchayath in Ernakulam district General Civil Work]2026_Irrig_873905_3
11/12/2026 05:30:00 AM[Tidal bund thanneermukkom]2026_Irrig_886204_1
11/13/2026 12:30:00 PM[GENERAL KIP RB budget work Rectification of transition portion of RBMC Aqueduct between ch 4011 m to 4200 m in Thenmala Grama Panchayath General Civil Work]2026_Irrig_886182_1
11/12/2026 12:30:00 PM[Procurement of Calyx Rotary Drilling Rig and Related Accessories for Departmental Execution of Investigationsand other works Procurement of heavy duty mechanical type Calyx Rotary Drilling Rig and related accessoriesAppendix 1]2026_Irrig_882711_2
11/12/2026 12:30:00 PM[GENERAL AMC 2026 2027 Karappuzha Dam Dam Safety Annual mechanical maintenance of 3 radial shutters and 2 intake shutters General Mechanical Work]2022_16_1_1
11/23/2026 06:00:00 AM[GENERAL IIP Renovation of damaged 1/3 3/3 5/3 quarters in IIP Colony compound Angamaly]2026_Irrig_885973_1
11/12/2026 09:30:00 AM[GENERAL Action plan 2026 2027 MVIP Kizhumury MD Urgent rectification works to canal lining near 900m for preventing leakage General Civil Work ]2026_Irrig_885991_1
11/10/2026 08:30:00 AM[GENERAL Action plan 2026 2027 MVIP Mamalassery MD Urgent rectification works to canal lining at ch 3500m General Civil Work]2026_Irrig_885955_1
11/10/2026 08:30:00 AM[Construction of retaining wall for Elambanam thodu near Ariyodichal padasekharam in Mannar panchayath - Reach 2- Balance Work]2025_Irrig_777114_3
11/12/2026 12:30:00 PM[GENERAL-Pazhangalam - Puliyila thodu Deposit-Renovation of thodu from Pazhangalam to Puliyila in Nedumpana Panchayath - Reach III-General Civil Work]2023_5_4_7
11/12/2026 09:30:00 AM[Construction of Minor boat terminal at Muttil in Cherukunnu Panchayath in Kannur District Balance work]2026_Irrig_868369_3
11/16/2026 09:30:00 AM[GENERAL Action plan 2026 2027 MVIP Annual maintenance of Ramamangalam Branch Canal and its distributories for the year 2026 27 General Civil Work]2026_Irrig_885722_1
11/10/2026 08:30:00 AM[GENERAL-Annual Maintenance 2026-2027- Annual maintenance of pump and motor of LI station No.3 in Sooranadu North Panchayath for the year 2026-27-General Civil Work]2026_Irrig_885630_1
11/17/2026 11:30:00 AM[GENERAL MVIP LBMC Annual Maintenance from CH16000m to 25624m of LBMC General Civil Work]2026_Irrig_885649_1
11/09/2026 08:30:00 AM[Modernization of Design WingPurchase of four sets of cubical mould for sample preparation and curing tank for cement tests in Quality control laboratory Kottarakkara]2026_Irrig_885503_1
11/13/2026 10:30:00 AM[GENERALAction Plan 20262027MVIPLBMC Annual Maintenance from ch8000m to 16000m for the year 20262027General Civil Work]2026_Irrig_885448_1
11/09/2026 08:30:00 AM[Construction of field drain for preventing innundation of Mavudy Padasekharam in Pothanikkad GP General CivilWork]2026_Irrig_876419_3
11/16/2026 05:30:00 AM[GENERAL-IIP-LLC-Engaging labour for clearing obstruction from canal and canal watching during water distribution from ch.0m to 14623m for the year 2026-27 including maintenance of shutter]2026_Irrig_885023_1
11/10/2026 12:30:00 PM[GENERALBudgetRectification work Urgent leak rectification works of Oyoor Branch Canal between ch 3900 m and 4400 m and 7900 m and 8400 m in Kottarakkara ConstituencyGeneral Civil Work]2025_5_5_4
11/11/2026 12:30:00 PM[GENERAL Annual Maintenance 2026 27 NO 1 LIS Annual Maintenance for the Year 2026 27 No 1 LIS Ramamangalam General Civil Work]2026_Irrig_885171_1
11/12/2026 05:30:00 AM[GENERAL-MI PTA ANNUAL MAINTENANCE 2026-27 vempala 1 LI Scheme Civil Works Annual Maintenance of Vempala 1 LI Station Under MI Section Thiruvalla Civil Works General Civil Work]2026_Irrig_885135_1
11/12/2026 11:30:00 AM[GENERAL KyIP ACP Plan 2026 27 Reconstruction of Poolakkadavu surplus shutter at the tail end of Kakkodi branch canal and maintenance of Thiruvangoor branch canal shutter at ch 0 00 km. General Mechanical Work]2026_Irrig_879506_2
11/17/2026 06:00:00 AM[G E N E R A L M V I P L B M C A n n u a l Maintenance from Ch 0 m to 3803m of Marika DistributoryGeneral Civil Work]2026_Irrig_884741_1
11/06/2026 08:30:00 AM[GENERAL-IIP-Division office-Reconstruction of collapsed compound wall of division office near store building-General Civil Work]2026_Irrig_884708_1
11/10/2026 09:30:00 AM[GENERAL-Monsoon Preparedness 2026- Urgent cutting of trees standing in dangerous condition on the right bund near Ch.1/100km and Ch. 5/400km of Pazhayannur LIS-General Civil Work]2026_Irrig_878447_2
11/09/2026 12:30:00 PM[ GENERAL-RENOVATION OF VETTIKADAVU LIFT IRRIGATION SCHEME-Soil Investigation for the Reformation of Thiruthikad Bund with Mechanical Shutter System and Side Protection Rectification -Investigation Work]2026_Irrig_880731_2
11/09/2026 12:30:00 PM[Annual Maintenance of Kakkad and Kakkad tail end LI Scheme]2026_Irrig_884684_1
11/07/2026 08:30:00 AM[Renovation of buildings in Model Area I and II]2026_Irrig_884687_1
11/09/2026 07:30:00 AM[Peechi Scheme Aqueduct a permananent solution at breached portion of left bund main canal bund between Ch.19/600km and 20/650kmBalance work ]2026_Irrig_863577_2
11/07/2026 12:30:00 PM[GENERAL-Urgent Repair of existing leaves of Thrikkunnapuzha 30 feet Lock gate-Patch Work of Existing 4 leaves of Thrikkunnapuzha 30 feet diamond lock gate-General Mechanical Work]2026_16_1_1
11/07/2026 10:30:00 AM[GENERAL Annual Maintenance 2026 27 Kizhumury LIS in Ramamangalam GP General Civil Work]2026_Irrig_884278_1
11/09/2026 05:30:00 AM[GENERAL-MI PTA ANNUAL MAINTENANCE 2026-27 vempala 1 LI Scheme(Civil Works)- Annual Maintenance of Vempala 1 LI Station Under MI Section Thiruvalla(Civil Works) General Civil Work]2026_Irrig_884014_1
11/09/2026 11:30:00 AM[GENERAL ACTION PLAN 2026 2027 KIP O and M Annual Maintanence of Iverkala main distributory between ch 0m to 4989m and its field boothy Iverkala I distributory between ch 0m to 3314m and its 5 field boothies during Water Distribution]2026_5_1_4
11/06/2026 11:30:00 AM[GENERAL ACTION PLAN 2026 2027 KIP O and M Annual Maintenance Edakkadu I distributory between ch 0m to 5100m and its 8 minor and 2 field boothies during Water Distribution General Civil Work]2026_5_5_2
11/06/2026 11:30:00 AM[GENERAL 2025 26 KIP O and M Urgent rectification works of Enath III distributary between ch 1560 m to 1750 m FB III Ch near 10 m FB IV Ch 600 m to 700 m in Kadampanad Panchayath General Civil Work]2025_5_6_5
11/06/2026 11:30:00 AM[GENERAL Protective Irrigation Work 2026 27 Putting up an earthen bund across KV Canal in Vaikom municipality General Civil Work]2026_Irrig_883866_1
11/06/2026 11:30:00 AM[GENERAL Protective Irrigation Work 2026 27 Putting up an earthen bund across Vadayar at Vazhamana Bhagam in Udayanapuram panchayath of Vaikom ConstituencyGeneral Civil Work]2026_Irrig_883848_1
11/06/2026 11:30:00 AM[GENERAL 2025 26 KIP O and M Urgent rectification works of Edakkadu I distributary between ch 0 m to 135 m in Kadampanadu Panchayath General Civil Work]2025_5_10_9
11/06/2026 11:30:00 AM[GENERAL-MHIS 2024-25-Maintenance of CGO stations under Hydrology Section Kottayam-CGO Station Maintenance -General Civil Work]2026_Irrig_883908_1
11/09/2026 10:30:00 AM[GENERAL Plan Work 2025 26 LBMC Urgent leak arresting work in emergency damaged portions between Ch 18000m to 18100m General Civil Work]2025_12_1_1
11/12/2026 12:30:00 PM[GENERAL-MVIP-Urgent Maintenance of Electrical DB Room and nearby Work Shed opposite to Dam Site Office and Supplying of Staff gauge(Reading scale) for the manual observation of Water levels in Reservoir and Canals.-General Civil Work]2026_Irrig_883508_1
11/06/2026 11:30:00 AM[GENERAL KIP O and M Action Plan 2026 2027 Rectification of breached portion of Keerukuzhy minor distributory at ch 600 m General Civil Work]2026_12_1_1
11/07/2026 09:30:00 AM[GENERAL-MI PTA -ANNUAL MAINTENANCE 2026-27--Maintenance of Thevankara L.I Scheme under M.I Section Mallappally-General Civil Work-General Civil Work]2026_Irrig_883220_1
11/07/2026 08:30:00 AM[GENERAL-MI PTA -ANNUAL MAINTENANCE 2026-27-Maintenance of Vennervila L.I Scheme under M.I Section Mallappally-General Civil Work]2026_Irrig_883211_1
11/07/2026 08:30:00 AM[GENERAL-MI PTA -ANNUAL MAINTENANCE 2026-27-Maintenance of Keeznvaipur -1 L.I Scheme under M.I Section Mallappally-General Civil Work-General Civil Work]2026_Irrig_883200_1
11/07/2026 08:30:00 AM[GENERAL-MI PTA -ANNUAL MAINTENANCE 2026-27-Maintenance of Ambattubhagam L.I Scheme under M.I Section Mallappally-General Civil Work]2026_Irrig_883170_1
11/07/2026 08:30:00 AM[Supply installation testing trial run and commissioning of 1 no 25 hp borewell Pump sets and 1 no 20hpSubmersible Pump set for K.M.Mani community Irrigation Scheme using Micro Irrigation in Ward No.1ofKuravilangad Panchayath in Kottayam Ds]2026_Irrig_883038_1
11/04/2026 11:30:00 AM[Procurement of Calyx Rotary Drilling Rig and Related Accessories for Departmental Execution of Investigations and other works Procurement of heavy duty mechanical type Calyx Rotary Drilling Rig and related accessories Appendix 1]2026_Irrig_882711_1
11/03/2026 12:30:00 PM[GENERAL-PVIP 2025-26-Rectification Urgent side protection work to Vazhappilly MD between Ch.5400m and Ch.5430m General Civil Work]2025_5_3_2
10/31/2026 05:30:00 AM[GENERAL-PSM 2026-27-Annual maintenance of Mudikkode branch canal from Ch. 0/000 to 6/700 km for the year 2026-27-General Civil Work]2026_5_12_11
11/02/2026 05:30:00 AM[GENERAL-MVIP -Urgent Repairs to the Sluice 1 Head Regulator Building Roof beam and slab-General Civil Work]2026_Irrig_877493_2
11/04/2026 11:30:00 AM[GENERAL Annual Maintenance 2026 27 Ooranattuchira Annual Maintenance for the Year 2026 27 Ooranattuchira RCB in Pampakuda GP General Civil Work]2026_Irrig_880154_2
11/04/2026 05:30:00 AM[LAC ADS Kyip LAC ADS 2025 26 Construction of culvert connecting Kattodimeethal to onchiyam school at ch 9 400 of Azhiyur branch canal in Onchiyam Panchayath Vadakara LAC General Civil Work]2025_5_7_6
11/02/2026 01:25:00 PM[GENERAL-PSM 2026-27-Annual maintenance of Vazhakkumpara branch canal from ch.0/000 to 4/200km and thekkumpadam branch canal from ch.0/000 to ch.1/050km for the year 2026- 27-General Civil Work]2026_5_16_13
10/31/2026 05:30:00 AM[GENERAL-Action Plan 2026-27-Annual Maintenance -Desilting of Thuruthikkara Distributory Ch 0 m to 5280m, and minor c a n a l s u n d e r K I P O and M S e c t i o n no.12/3 Bharanikkavu-General Civil Work]2026_5_6_5
10/30/2026 10:30:00 AM[GENERAL-Action plan 2026- 27 - Annual Maintenance-Jungle clearance and removing floating body for smooth flow of water during water distribution in Vallikunnam distributory from 0 m to 6777m General Civil Work]2026_5_3_2
10/30/2026 10:30:00 AM[ GENERAL PVIP IPTMC Improvements to PVIP Garden at Bhoothathankettu Phase I General Civil Work]2026_Irrig_881504_1
10/30/2026 10:00:00 AM[LAC ADS Kyip LAC ADS 2025 26 Construction of Mangottupara Peedikakandi canal road near ch 5 420 of Azhiyur branch canal phase 2 in Chorode Panchayath Vadakara LAC General Civil Work 1]2025_5_4_3
10/29/2026 01:25:00 PM[G E N E R A L - R E N O V A T I O N O F VETTIKADAVU LIFT IRRIGATION SCHEME-Soil Investigation for the Reformation of Thiruthikad Bund with Mechanical Shutter System and Side Protection Rectification -Investigation Work]2026_Irrig_880731_1
10/26/2026 12:30:00 PM[GENERAL FY 2026 2027 Renovation and Improvement Works to Soil Mechanics Laboratory Corridor and Entrance Lobby General Civil Work]2026_5_1_1
10/27/2026 12:30:00 PM[GENERAL-Monsoon Preparedness 2026- 27Urgent cutting of trees standing in dangerous condition on the right bund near Ch.1/100km and Ch. 5/400km of Pazhayannur LIS-General Civil Work]2026_Irrig_878447_1
10/26/2026 12:30:00 PM[-Main canal water distribution during 2026-27 engaging labour for watching canal and for clearing obstructions including removal of slipped earth during water distribution and clearing light jungle in the forest area from Ch16360 m to 28800 m of mai]2026_Irrig_871290_3
10/28/2026 09:30:00 AM[GENERAL Plan 2023 24 MI Class II Improving Irrigation facilities to Nalunnackal padasekharam at Vakathanam Panchayath in Puthupally LAC General Civil Wor1k]2023_5_1_1
10/23/2026 06:30:00 AM[GENERAL NIP Action Plan 2026 27 Maintenance near Ch 1400 m and 1550 m of Vizhinjam Branch Channel General Civil Work]2025_5_1_1
10/21/2026 10:30:00 AM[GENERAL-NIP - Action Plan 2026-27- Emergency Rectification of Olathanni Branch Channel Near Ch.150m and near Olathanni shutter-General Civil Work]2026_5_2_1
10/21/2026 03:30:00 AM[GENERAL-Annual Maintenance 2024-25- Panamaram LI scheme in panamaram panchayath, wayanad dt-General Civil Work]2024_5_2_1
10/26/2026 09:30:00 AM[GENERAL-MI-PTA-Annual Maintenance of civil work 2026-27-Annual Maintenance of Kulanilam LI scheme-General Civil Work]2026_5_8_7
10/26/2026 04:30:00 AM[GENERAL-PVIP-ACTION PLAN 2026-27 Annual maintenance of West Kunnackal MD from ch.0 km to 3/600 km,Valakom FC from Ch.0/000km to ch. 1/000km and Badhanippady FC from ch.0/000km to 1/000km-General Civil Work]2026_5_17_6
10/26/2026 05:30:00 AM[GENERAL-PVIP-ACTION PLAN 2026-27 Annual maintenance of Nellad MD from ch 0m to 7110m and Kunnakkurudi FC from ch 0m to 1500m-General Civil Work]2026_5_15_14
10/26/2026 05:30:00 AM[GENERAL-PVIP-ACTION PLAN 2026-27 Annual Maintenance of North Kunnakkal MD from Ch.0 m to 4215m -General Civil Work]2026_5_11_10
10/26/2026 05:30:00 AM[GENERAL CADA 2026 27 Renovation and modernisation works b w Ch 0 000Km and 0 200Km of Edakkara FB General Civil Work]2026_5_7_6
10/21/2026 12:30:00 PM[GENERAL-Action Plan 2026 27 Annual Maintenance Desilting of Alathur padam Ch 0 m to 2585m kumaranchira Ch 0 m to 3600m Muthupilakkad canals under KIP O M Section no 12 3 Bharanikkavu General Civil Work]2026_5_5_4
10/23/2026 05:30:00 AM[GENERAL KyIP ACP PLAN 2026 27 Rectification work at RBMC in between ch 18 500 km to ch 19 500 km General Civil Work]2026_5_4_3
10/20/2026 01:25:00 PM[Sooranadu- Kanjirathinkadavu LI Scheme- Mechanical Works- Balance Work]2026_Irrig_877701_1
10/30/2026 05:30:00 AM[MP LADS Open Gym Palakkad Block Panchayath PirayiriGrama Panchayath 2024 2025 FY MPLADS Construction of Open Gym at Puthukulangara area ward 21 in PirayiriGramaPanchayath General Mechanical Work]2025_16_1_1
10/20/2026 06:00:00 AM[Members Lounge]2026_Irrig_877284_1
10/19/2026 09:30:00 AM[GENERAL KyIP ACP Plan 2026 27 Replacement of river surplus gate valve at ch 3 820 km of RBMC General Mechanical Work]2026_16_3_2
10/23/2026 06:00:00 AM